Summary of 820831-0903 Instrument & Control Site Audit
ML17213A775
Person / Time
Site: Saint Lucie 
Issue date: 11/18/1982
From: Nerses V
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8212010439
Download: ML17213A775 (7)


Text

Docket No.:

50-389 NOV 18 1982 Distribution:

See Attached Sheet APPLICANT:

Florida Power and Light Company, (FPBL)

FACILITY:

St. Lucie Plant, Unit 2

SUBJECT:

SUGARY OF t1EETING HELD WITH FPSL AT THE ST.

LUCIE 2 SITE ON AUGUST 31 THROUGH SEPTEMBER 3, 1982 REGARDING THE INSTRUt1ENT AND CONTROL SYSTEM SITE AUDIT The instrumentation and Control System Branch conducted their site audit.

These items were given to the licensee at the end of audit for formal responses.

Attachment:

NRC I8C Site Audit cc:

See next page poiginnlslgnbdb'I: g. l4

~

~

~

~

~

(

Victor Nerses, Project Manager Licensing Branch No.

3 Division of Licensing 82i20i0439 82iii8

'DR *DOCK 05000389 A

PDR OFFICE/

SURNAME DAT D

0 3

erses:ph

~

~ 0 ~ 0 ~ ~ 0 ~ ~ 0 ~ 00 ~ ~ ~ ~ 0 ~ 0 rgb.)$ /82 DL:

G n

ton

~

~ 0 ~ ~ ~ ~ ~ ~

~ ~ ~ ~ 0 ~ 0 ~ 0 ~ ~ 0 ~

ll/t.C

/82

~ ~ ~ ~ ~

~ Of00%0 ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~

NRC FORM 310 t10-80) NRCM 0240 OFFlCIAL RECORD COPY USGA: 1981~960

0 0

"r g" 'I~<

14>,

~

'( 4 deaf >'~>.),.'

~

4

~

~

ST.

LiJCIE Dr. Robert E.

gehrig, Vice Presdent Advanced Systems and Technology Florida Power 8 Light Company P. 0.

Box 529'i000 Miami, Florida 33152 Harold F. Reis, Esq.

Lowenstein, Nevrnan, Reis, Axelrad 8 Toll 1025 Connecticut Avenue, N.M.

Mashington, D.

C.

20036

doorman A. Coll, Esq.

St el Hector 8 Davis 1400 Southeast First National Bank Building ttiami, Flordi a 33131 Hr. l3artin H. Hodder 1131 N.

E. 86th Street Hiami, Flordia 33138 Resident Insp ctor St.

Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 5n>>.th A1A Jensen Beach, Flordi a 33457 Re 9i one l. Admins tra tor -

Re'g i on II V. S.

>> el~sr Pegulatory Commission 101 Marie ta Street Suite 3100 Atlant

, Georgia 30303

Au ust 31 1982 NRC I 6 C SITE, AUDIT; Item No. 1:

FPL identified their method. of identifying the sepe"ate instrument channels on the main control boards which nas resulted from various hu=an factor reviews.

The hu...an factors report (FPL LTR. L-82-424 of Septemoer 30, 1982) provides further discussion on the methods of identifying the separate instrument channels on the main control boards.

NRC will review this item in-house for acceptability.

Item No. 2:

Boric acid heat tracing channels 5A and 5B have a single alarm on the control board.

How does this provide sufficient

'edundancy?

Item No. 3:

The HVAC alarms in the control room do not appear to have redundant inputs.

7~hat redundant alarm does an operator have to indicate problems with his HVAC equipment?

Item No. 4:

The indiviual instruments throughout the plant are not color coded.

This is an NRC obsurvaticm:

tnere is nn ran>>irompnr

,I I

jug tne condor cod~kg of ~nsrrsiments Se tember 1

1982 Item No. 1:

Cable tray covers were not installed.

This is an NRC observation.

"tern No. 2:

RTG board 206 cable entry area has insufficient cable separation in one area.

Item No. 3:

Item No.

The conduit inside the main control boards does not:appear to have sufficient identification to readily determine which elec-trical train passes through each conduit.

P The nameplate designation on several items on the main control board appeared to be incorrect.

~ Item No. 5:

-The acoustic monitoring instrumentation for safety and relief valve leakage monitoring was not available for review.

This is not a finding but only an observation.

September 2

1982 Item No. 1:

The access door to the Hot Shutdown Panel room does not have a

door handle or lock.

What steps must an operator take to exit the control room and'ccess the Hot Shutdown Panel?

The Hot Shutdown Panel ap ea ppeared to have inadequate separation

'nternally within the center cabinet.

Provide a list of equipment that is required for cold shutdown including which pieces of equ'pment are not actuated from the Hot Shutdown Panel and which pieces of equipment are not isolable from the control room.

(a) Provide a list of equipment required to maintain hot shutdown.

(b) Provide a list of all transfer switches and their associated equipment including location and which s~itches are j~pered and which switches are alarmed in the control room.

It was noted that many wire terminations are not complete.

This is not a finding by an lKC observation.

Provide a description of the interaction between the diesel oonerarnr and'he bvnasc nr inon~r~nia si.eius bvacd.

0

MEETING

SUMMARY

V6ocument Control (50-38'RC PDR L PDR NSIC TERA-LB83 Reading J.

Lee G. Knlghton V

Nerses Project Manager

Attorney, OELD E. L. Jordon Regional Administrator, Region II J.

M. Taylor PARTICIPANTS NRC