Issue date | Title | Topic | |
---|---|---|---|
ML23163A250 | 12 June 2023 | Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations | |
ML23163A055 | 25 May 2023 | Plant Procedures Manual 13.8.1, Revision 41, Emergency Dose Projection System Operations | Met Tower Deep Dose Equivalent Hardened vent |
ML23115A170 | 6 April 2023 | Emergency Preparedness Procedure 13.14.9, Rev. 31, Emergency Program Maintenance | |
ML23080A119 | 9 March 2023 | Energy Northwest, Emergency Preparedeness Procedures 13.13.4, Revision 010/006, & 13.14.4, Revision 057/001 | Met Tower |
ML23041A215 | 15 December 2022 | Energy Northwest, Emergency Preparedness Procedure 13.10.17, Revision 006, TSC Ventilation Radiation Monitor System Operations | |
ML22178A140 | 16 June 2022 | Generation Station, Rev. 57 to EPIP 13.14.4, Emergency Equipment Maintenance and Testing | Met Tower |
ML20366A051 | 17 December 2020 | Energy Northwest Emergency Preparedness Procedure 13.5.1, Revision 031/001, Local, Protected Area or Site Evacuation | High winds |
ML20087H047 | 12 March 2020 | Rev. 32 to Emergency Preparedness Procedure 13.11.12 | |
ML20097B686 | 9 March 2020 | Emergency Plan Implementing Procedures | Met Tower Deep Dose Equivalent |
ML20087J669 | 2 March 2020 | Rev. 054/005 to Emergency Preparedness Procedure 13.14.4 | Met Tower |
ML20013E539 | 23 December 2019 | Energy Northwest - Emergency Preparedness-Emergency Plan Implementing Procedures | Met Tower |
ML19171A274 | 11 June 2019 | Energy Northwest - Revised Emergency Preparedness Procedure 13.8.1, Emergency Dose Projection System Operations | Met Tower Deep Dose Equivalent |
ML19171A273 | 23 May 2019 | Energy Northwest - Emergency Preparedness Procedure 13.14.9, Rev. 20, Emergency Program Maintenance | |
ML19031B343 | 16 January 2019 | Energy Northwest Distribution - Volume 13 - Emergency Preparedness Procedures | Safe Shutdown High winds Operating Basis Earthquake Pressure Boundary Leakage |
ML19010A103 | 18 December 2018 | Submittal of Emergency Preparedness Procedures 13.1.1A, Revision 034 & 13.13.2, Revision 018 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Met Tower Operating Basis Earthquake Operator Manual Action Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
ML18348A582 | 4 December 2018 | Plant Procedures Manual - EP Equipment | Health Physics Network Grab sample Met Tower Cyber Security Emergency Lighting Significance Determination Process B.5.b Mitigating Strategies Earthquake |
ML18254A190 | 30 August 2018 | Site-Wide Procedure SWP-EPP-01, Rev. 22, Emergency Response Organization and Training. | Fitness for Duty |
ML18227A150 | 7 August 2018 | Emergency Preparedness Procedures - Equipment Maintenance and Testing | Met Tower |
ML18192B996 | 3 July 2018 | Plant Procedural Manual | Met Tower Deep Dose Equivalent |
ML18087A051 | 8 March 2018 | Generation Station - Plant Procedures Manual | High winds |
GO2-18-029, Summary of Changes for Emergency Plan Implementing Procedures | 20 February 2018 | Summary of Changes for Emergency Plan Implementing Procedures | |
ML18026A629 | 17 January 2018 | Generation Station - Volume 13, Emergency Preparedness Procedures 13.1.1, Rev. 049; 13.1.1A, Rev. 033; 13.8.1, Rev. 038 and 13.14.11, Rev. 013 | Safe Shutdown Unanalyzed Condition Time of Discovery Health Physics Network High winds Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Met Tower Operating Basis Earthquake Operator Manual Action Cyber Security Emergency Lighting Significance Determination Process Battery sizing B.5.b Mitigating Strategies Earthquake Deep Dose Equivalent Fuel cladding Pressure Boundary Leakage Grace period Power change |
ML18009A483 | 21 December 2017 | Generation Station - Emergency Preparedness Procedures | Earthquake |
GO2-17-168, Summary of Changes and Analysis for Revision 65 of the Emergency Plan, Revision 48 of PPM 13.1.1 Classifying the Emergency, Revision 32 of the PPM 13.1.1A Classifying the Emergency - Technical Bases, and Revisions... | 10 October 2017 | Summary of Changes and Analysis for Revision 65 of the Emergency Plan, Revision 48 of PPM 13.1.1 Classifying the Emergency, Revision 32 of the PPM 13.1.1A Classifying the Emergency - Technical Bases, and Revisions... | |
ML17340A394 | 6 October 2017 | Emergency Preparedness Procedure 13.14.11, Revision 012 | Health Physics Network Grab sample Met Tower Cyber Security Emergency Lighting Significance Determination Process B.5.b Mitigating Strategies Earthquake |
ML17268A143 | 12 September 2017 | Emergency Preparedness Procedures, Including Revision 048 to 13.1.1, Revision 02 to 13.1A, and Revision 037 to 13.8.1 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Met Tower Operating Basis Earthquake Operator Manual Action Battery sizing Earthquake Deep Dose Equivalent Fuel cladding Pressure Boundary Leakage Grace period Power change |
ML17251B121 | 29 August 2017 | Procedure No. 13.4.1, Emergency Notifications | Fitness for Duty |
ML17248A037 | 17 August 2017 | Plant Procedures Manual, No. 13.1.8, Revision 025/001, Security Lieutenant and Security Force Duties | |
ML17165A433 | 24 May 2017 | Submittal of Emergency Preparedness Procedures 13.8.1, Revision 036/001 and 13.11.12, Revision 031 | Met Tower Deep Dose Equivalent |
ML17087A459 | 16 March 2017 | Revision to Volume 13, Emergency Preparedness Procedures | Fitness for Duty Grab sample Met Tower Nondestructive Examination Cyber Security Significance Determination Process B.5.b Mitigating Strategies Earthquake |
ML17059C906 | 14 February 2017 | Energy Northwest, Revision to Emergency Preparedness Procedures | Health Physics Network |
GO2-17-013, Submittal of Summary of Changes and Analysis for Revision 64 of Emergency Plan and Revision 20 of EPIP 13.2.2 Determining Protective Action Recommendations | 1 February 2017 | Submittal of Summary of Changes and Analysis for Revision 64 of Emergency Plan and Revision 20 of EPIP 13.2.2 Determining Protective Action Recommendations | |
ML16333A323 | 17 November 2016 | Revision 043/003 to Procedure 13.4.1, Emergency Notifications | Fitness for Duty |
ML16230A252 | 4 August 2016 | Emergency Equipment Maintenance and Testing | Met Tower |
GO2-16-023, Independent Spent Fuel Storage Installation - Emergency Plan Implementing Procedure, Regarding Revision 19 to PPM 13.2.2, Determining Protective Action Recommendations. | 3 February 2016 | Independent Spent Fuel Storage Installation - Emergency Plan Implementing Procedure, Regarding Revision 19 to PPM 13.2.2, Determining Protective Action Recommendations. | Earthquake |
ML16042A416 | 22 January 2016 | Revised Emergency Plan Implementing Procedures | Fitness for Duty |
ML16015A051 | 5 January 2016 | Revision 021 to SWP-EPP-01, Emergency Response Organization and Training | Safe Shutdown Fitness for Duty |
ML16014A135 | 5 January 2016 | Revision 019 to Procedure N. 13.2.2, Determining Protective Action Recommendations | Earthquake |
ML16020A015 | 15 December 2015 | Major Revision 010, Minor Revision 002 to Plant Procedures Manual, Procedure No. 13.13.4, After Action Reporting. | Fitness for Duty |
ML083500548 | 4 December 2008 | Rev. 31 to Emergency Plan Implementing Procedures Manual 13.10.2, TSC Manager Duties, and Rev. 23 to 13.10.7, Plant Administration Manager Duties, Volume 13 Package No. 2008-0968 | |
ML090680407 | 3 December 2008 | Submittal of Revision 28 to Emergency Dose Projection System Operations, Page 1 Being Redistributed Due to Date Formatting Error | |
ML041270094 | 29 April 2004 | Procedures Manual - Volume 13, Package No. 2004-290 | |
ML041210907 | 22 April 2004 | Plant Procedures Manual - Volume 13 Package No. 2004-263 | Fitness for Duty Health Physics Network Met Tower |
ML040820393 | 11 March 2004 | Revised EPIPS, Including Rev. 31 to EPIP 13.9.1, Rev. 9 to EPIP 13.12.19, Rev. 4 to EPIP 13.12.20 & Rev. 5 to EPIP 13.12.21 | Fitness for Duty |
ML040790369 | 11 March 2004 | 1 to SWP-EPP-01, Emergency Response Organization and Training. | Fitness for Duty |
ML040720436 | 2 March 2004 | Columbian Generation Station - Revised Emergency Plan Implementing Procedures | High winds |
ML040430189 | 5 February 2004 | Generation Station - Plant Procedures Manual, Volume 13, Package No. 2004-67 | Safe Shutdown Fitness for Duty Fire Protection Program |
ML040220456 | 8 January 2004 | Generation Station - Plant Procedures Manual, Revision 13 | Fitness for Duty Health Physics Network High winds Met Tower |
ML033460377 | 1 December 2003 | Revision 10 to SWP-EPP-01, Emergency Response Organization and Training. | Fitness for Duty |
ML033290612 | 13 November 2003 | Procedures Manual, Volume 13, Package No. 2003-783 |