ML17340A394

From kanterella
Jump to navigation Jump to search
Emergency Preparedness Procedure 13.14.11, Revision 012
ML17340A394
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/06/2017
From:
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
13.14.11, Rev. 12
Download: ML17340A394 (69)


Text

DISTRIBUTION-VOLUME 13- EMERGENCY PREPAREDNESS PROCEDURES Distribution Date: 11/28/17 LMB Filed By:

Procedure Number Revision Procedure Number Revision Procedure Number Revision 13.14.11 012 Security Receipt Acknowledgement for Control Copies 58, 59 and 214.

I hereby agree that the above stated revisions have been received.

Printed Name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,Date_ _ _ __

LEVEL 1 FILING (MUST BE FILED SAME DATE AS IMPLEMENTATION)

Copy# Location Procedures Mail Drop 2 Control Room - Shift Mqr Office All (Except 13.1.1) 964Y Control Room STA Desk Distribution List Only 964Y 31 Technical Support Center/Operations All (Except 13.1.1 ) 964Y Support Center

& 58 CGS Security - SAS-CR - S English 13.1.1 13.5.1 13.5.5 13.11 .1 0 13.12.19 13.13.4 ---

Call for pickup - RA Memo Req'd 13.4.1 13.7.5 13.10.8

& 59 CGS Security - CAS-GSB - S English 13.1.1 13.5.1 13.5.5 13.10.8 13.1 1.10 13.13.4 ---

Call for pickup - RA Memo Req'd 13.4.1 13.7.5 13.12.19 68 Remote Shutdown Room 13.2.1 13.2.2 13.4.1 13.5.1 13.10.1 13.10.9 964Y 78 Control Room STA Desk .' All (Except 13.1.1) 964Y 83 MUDAC (EOF) All (Except 13.1.1) 964Y 90 Joint Information Center All (Except 13.1.1) 964Y 94 Emergency Operations Facility All (Except 13.1.1) 964Y 160 Technical Support Center/Operations All (Except 13.1.1) 964Y Support Center 214 CGS Security - SCC- PAAP- S English 13.4.1 13.5.1 13.10.8 13.1 1.10 13.13.4 13.14.1 964Y Call for pickup RA Memo Req'd 238 Alternate Emergency Operations Facility All (Except 13.1 .1) 964Y

  • ' * , 1 * ' ~ * .:.. .. * * * * * '

& PPM 13.1 .1 is printed in color, single sided, on 11" x 17" paper, folded , 3-hold punched, stapled on top and distributed by Document Control. I 4-x45 /\,11' (<,

Updated 11!;'06/17 r"'

\

DISTRIBUTION - VOLUME 13 - EMERGENCY PREPAREDNESS PROCEDURES Distribution Date: 11/28/17 LMB Filed By:

Procedure Number Revision Procedure Number Revision Procedure Number Revision 13.14.11 012 NOTE: Distribution of the PPM 13.1 .1 wall flow charts is controlled by PPM 13.1.1 A and distribution is performed by EP .

OTHER FILING/ACTIONS Co # Location Procedures Mail Dro 6 Simulator All (Except 13.1.1) 1500 35 NRC Resident Inspector All (Except 13.1 .1) 988C 86 Simulator - STA Desk All (Except 13.1.1) 1500 129 Operations Training Classroom All (Except 13.1.1) 1050 132 Operations Training Classroom All (Except 13.1.1) 1050 219 Operations Training Classroom All (Except 13.1.1 ) 1050 220 Operations Training Classroom All (Except 13.1.1) 1050 999 Security Liaison - ICP Kit - EP 13.11 .10 PE30

~,~' '* . *::. ..

. - ~ .

~

~ . . . . ~

NOTE: Distribution of the PPM 13.1.1 wall flow charts is controlled by PPM 13.1.1 A and distribution is performed by EP.

Updated 10/06/17

/

DISTRIBUTION -VOLUME 13- EMERGENCY PREPAREDNESS PROCEDURES Distribution Date: 11/28/17 LMB Filed By:

Procedure Number Revision Procedure Number Revision Procedure Number Revision 13.14.11 012 TO: ENERGY NORTHWEST EXTERNAL CONTROLLED COPY PROCEDURE HOLDERS The following documents have been revised and are to be inserted into your controlled copy manual and the superseded revisions removed and destroyed. No receipt acknowledgement is required for the listed document(s).

Should you have questions on this distribution please contact Kim Saenz, Records and Information Supervisor at (509)377-2492 or KDSaenz@energy-northwest.com.

Distribution Date: 11/28/17 LMB Procedure Number Revision Procedure Number Revision Procedure Number Revision 13.14.11 012 i

EXTERNAL DISTRIBUTION Copy# Location Procedures 26 Region IV - US Nuclear Regulatory Commission All 28 Reqion IV - US Nuclear Requlatorv Commission All 52 State of Washington, Military Department All 55 Federal Emerqencv Manaqement Aqencv (FEMA) All 57 Benton County - Department of Emergency Management All 75 Department of Health Radiation Protection All 87 Document Control Desk - NRC All 142 Hanford EOC/SMT All 164 Oregon State Department of Enerov All 223 Franklin County Emergency Management All Updated 10/06/17

DISTRIBUTION-VOLUME 13-EMERGENCY PREPAREDNESS PROCEDURES Distribution Qate: *.

  • 11/28/1'7 LMB ,_. , :. - . Filed_ By:_,

~ ~ ~ - - - , ~ - - , - - - ~ ~ - ' - ' - - ' - - ' - - - ' - - - - ' - ' - - , - - - , - , - - _ .. ,-.-.- .. ..

Procedure Number Revision Procedure Number Revision Procedure Number Revision 13.14.11 ..

012. - -.

224 I Washington State Department of Health - Office of Radiation -Protection I All t:

NOTE: PPM 13.1.1 is printed in color; single sided, on 11" x 17"paper; fold~d, 3:-hold punched, stapled on the top & distributed by Document Control. *

~: . .*

NOTE: Distribution of the PPM 13; 1.1 wall flow chart~ is controlled by PPM 13.1.1 A an,d distribution is performed by EP.

J':-:: '

-e- )

~ *' " I ' .

Updated 10/06/17

Initials Date Number: 13.14.11 Major Rev: 012 t - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - 1 Minor Re.v: N/A

Title:

EP Equipment Page: 1 of 65 PCN#:

PLANT PROCEDURES MANUAL ' . N/A Effective bate:

Illllll lllll llll llllll lllll llll 1111111111111111111  :*,

13.14.11 ' .

11/28/17

Number: 13.14.11 I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 2 of 65 DESCRIPTION OF CHANGES CGS has adopted NEI 99-01 Rev 6 EAL scheme. No rev bars due to greater than 30% change.

Attachments Revised Attachments 8.1 and 8.2 based on changes for implementation of NEI 99-8.1 and 8.2 01 Rev 6 EAL scheme. Some equipment is no longer used for EAL classification.

Some new equipment has been added with the implementation of the new EAL scheme.

Various Deleted "IC" from "IC/EAL" column heading from attachments. Initiating Condition (IC) is not a useful identifier in this procedure.

11 Removed definitions for "Corrective Maintenance" and "Elective Maintenance",

these terms are not used in this procedure.

13 Removed definition of "Other Work" and "Safety Parameter Display System", these terms are not used in this procedure

  • 41 Revised table on page 41 to align with current notification systems for Site and Public .

Number: 13.14.11 I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 3 of 65 TABLE OF CONTENTS Page 1.0 PURPOSE ............................................................................................................................... 4 2.0 RESPONSIBILITIES ................................................................................................................ 4 3.0 DISCUSSION .........................................................................................................._. ................ 5 4.0 PROCEDURE ................ *.......................................................................................................... 7 5.0 DOCUMENTATION ............................................................................................................... 10 6.0 DEFINITIONS ........................................................................................................................ 11

7.0 REFERENCES

...................................................................................................................... 14 8.0 ATTACHMENTS ................................................................................................. ,.................. 14 8.1 EP Related Important Equipment by EPN .............................................................................. 15 8.2 EP Related Important Equipment by Function ........................................................................ 32 8.3 EP Related Important Equipment - TSC ................................................................................ 42 8.4 EP Related Important Equipment - OSC ............................................................................... 46 8.5 EP Related Important Equipment - EOF (Building 34) ........................................................... 48 8.6 EP Related Important Equipment - Alternate EOF ................................................................. 57 8.7 EP Related Important Equipment-JIG .................................................................................. 60 8.8 Unplanned Loss of Equipment ............................................................................................... 64 8.9 Planned Loss of Equipment ................................................................................................... 65

I Use Category: REFERENCE Number: 13.14.11 Major Rev: 012 Minor Rev: NIA

Title:

EP Equipment Page: 4 of 65 1.0 PURPOSE The purpose of this document is to ensure when equipment important to emergency response is removed from service for maintenance or is in a degraded condition, the correct restoration priority is assigned, compensatory measures are implemented, and the equipment is promptly restored to a functional condition.

This procedure provides identification of Important Emergency Preparedness (EP) related equipment. The equipment identified in this procedure is essential to implementation of the Emergency Plan.

For Emergency Response Facilities (ERFs) and associated equipment that are not included in the station work management process, the corrective action process is used to ensure issues are identified and corrected.

The information and direction in this procedure applies to on-site and off-site equipment and facilities normally operated or maintained by Columbia Generating Station that are necessary to meet the requirements of the Emergency Plan.

2.0 RESPONSIBILITIES 2.1 Emergency Preparedness Manager The Manager, Emergency Preparedness is responsible to assure that Important EP-related equipment is identified and repairs are executed expeditiously as necessary.

2.2 Shift Manager The Shift Manager is responsible for ensuring that a Condition Report and/or Work Request is generated for Equipment identified in Attachment 8.1 and 8.2 of this procedure, and to ensure identified compensatory actions are put in place.

2.3 Work Control Manager The Work Control Manager is responsible to assure that deficient conditions of Important EP-related equipment are appropriately prioritized and scheduled to be corrected promptly in the corrective maintenance program.

2.4 Emergency Planners The Emergency Planners are responsible to assure issues with Important EP-related equipment are identified for correction .

Number: 13.14.11 I Use Category: REFERENCE Major Rev: 012 Minor Rev: NIA

Title:

EP Equipment Page: 5 of 65 2.5 Unit Coordinator (Work Control)

Unit Coordinators are responsible to assign appropriate repair priorities to assure that Important EP equipment is factored into the daily work schedule for expeditious repair and return to service.

2.6 Corrective Action Program Manager Responsible for ensuring that the corrective action program supports the tracking and trending of deficiencies related to EP equipment.

  • 2.7 Design Engineering Manager Responsible for ensuring that the design change process identifies any impacts to emergency plan commitments and emergency response capabilities.

2.8 Regulatory Affairs Manager Responsible for providing guidance on compliance with the station licensing basis and related reportability issues.

  • NOTE: The Emergency Plan is designed as a last line of defense to address design basis accident events at a nuclear power plant, including the capability of protecting public health and safety during and following the accident. Therefore, regulations that govern EP equipment may require more timely restoration than technical specifications or other administrative controls. This procedure provides identification of Important Emergency Preparedness related equipment. The equipment identified in this procedure is essential to implementation of the Emergency Plan.
  • 3.0 DISCUSSION 3.1 INPO 10-007, Equipment Important to Emergency Response, was used as guidance in the development of this procedure. The information contained in this procedure assists Information Technology (IT), Maintenance, and Facilities planners in identifying Important EP equipment and assigning appropriate repair priority to assure prompt return to service of any EP-related component identified here.

3.1.1 Equipment with an identified EPN is listed in Attachment 8.1.

3.1.2 IF there is no EPN, THEN reference Attachment 8.2 to determine if the affected equipment impacts the ability of the ERF to function (i.e. power, HVAC, communications).

3.1.3 Items specific to an Emergency Center are listed in Attachments 8.3 through 8.7.

These items will impact the Centers ability to function but will NOT render the center non-functional.

IUse Category: REFERENCE Number: 13.14.11 Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 6 of 65 3.2 Regulatory guidance provided by the Nuclear Energy Institute (NEI) in their guidance NEI 13-01, which was endorsed by the NRC in NU REG 1022 Revision 3, differentiates between "Methods" and "Compensatory Measures," as applicable to the context in which these terms are used for equipment and facilities important to EPlan functions. Those definitions are included *here verbatim as they appear in the NEI 13-01 guidance, so that their significance with respect to EPlan functions and EPlan event notifications is understood.

3.2.1 METHOD

A means that could be employed to perform an emergency response function as described in the site emergency plan or an implementing procedure described in the emergency plan. [Site emergency plans and implementing procedures typically describe primary and one or more alternate methods for performing a given function. Provided that at least one METHOD is available, then the ability to perform the associated function has not been lost.]

3.2.2 COMPENSATORY MEASURE: A temporary means, established as part of a planned activity, to perform a given emergency response function during a period when the normally used methods are unavailable such that, when implemented, there is a reasonable expectation that the function would be accomplished during an actual emergency, albeit in a possibly degraded manner. [A COMPENSATORY MEASURE need not meet the same design or operating requirements as the normally used methods but must be sufficient.to support effective implementation of the site emergency plan. Also refer to the related term "VIABLE. '1

3.2.3 VIABLE

A COMPENSATORY MEASURE that (1) can restore a required function in a reasonably comparable manner and (2) is proceduralized prior to an event.

[Proceduralized means that the necessary instructions to perform a function exist in a document (e.g., a procedure, a user aid, a night or standing order, etc.) that will be followed by response personnel should an emergency occur. Further, individuals expected to implement the COMPENSATORY MEASURE must be aware of the measure, in advance of its potential or actual implementation. A VIABLE COMPENSATORY MEASURE does not include reliance upon, "skill-of-the-craft" or individual judgment.]

Number: 13.14.11 I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 7 of 65 4.0 PROCEDURE 4.1 Discovery of Degraded or Nonfunctional Equipment Important to Emergency Response (Unplanned Loss)

See Attachment 8.8, Flowchart: Unplanned Loss of Equipment Important to EP. This illustrates the process for addressing an unplanned loss of equipment, such as unplanned maintenance.

NOTE: This section pertains to unanticipated degradation or failure of equipment important to emergency response.

4.1.1 Generate a Condition Report and prioritize to restore function. This allows tracking and trending, as well as ensuring timely repair. The priority given to these actions should be commensurate with the significance of the impact on the associated emergency response function.

NOTE: Compensatory Measures identified in this procedure, which is not an Emergency Plan Implementing Procedure (EPIP), may or may not be acceptable Alternate Methods unless so recognized in another EPIP. See PPM 1.10.1, Notifications and Reportable Events, for potential notifications on loss of EP equipment.

4.1.2 Compensatory measures associated with the degraded or nonfunctional equipment can be found in the attachments to this procedure.

4.1.3 IF the equipment is INPO 10-007 Category A1 or Category A2 equipment, THEN implement identified compensatory measures.

a. The Shift Manager will implement compensatory measures to address the loss of plant equipment necessary to implement the station emergency plan. The compensatory measures should be documented in the lnop. Equip/LCO/RFO Log section of the Operations Logging System.
b. The status of out-of-service equipment can be obtained from the Operations Logging System Out of Service EPNs report.
c. Evaluate the loss of response capability. If the function requires more time to implement or cannot be implemented, evaluate the reportability requirements.
d. The Shift Manager coordinates with the licensing/regulatory affairs staff to evaluate Nuclear Regulatory Commission (NRC) reporting requirements for out-of-service EP equipment per PPM 1.10.1 .

IUse Category: REFERENCE Number: 13.14.11 Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 8 of 65 4.1.4 For INPO 10-007 Category B equipment:

a. Verify the availability of redundant equipment for degraded or nonfunctional Category B equipment. If redundant equipment is not available, then the equipment should be reevaluated as Category A 1 or Category A2 equipment.
b. Category B equipment is allowed to be out of service provided redundant equipment is available to maintain the emergency response function.
c. Notify emergency response personnel of the degraded condition and the compensatory measures in effect.

4.2 Removal Of Equipment From Service For Planned Maintenance (Planned Loss)

See Attachment 8.9, Flowchart: Planned Loss of Equipment Important to EP. This illustrates the process for addressing a planned loss of equipment.

NOTE: A rigorous work management process, which includes guidance for EP equipment, is essential to ensure that maintenance is completed and that the equipment is restored to service expeditiously.

  • 4.2.1 4.2.2 Individuals who are trained on and knowledgeable of emergency plan requirements should help evaluate equipment configuration changes that may impact emergency
  • plan functions or EAL assessment capabilities.

For INPO 10-007 Category A1 or Category A2 equipment, ensure compensatory measures are in place before equipment is removed from service for planned maintenance. Ensure the compensatory measure is controlled in accordance with PPM 13.14.11, PPM 1.3.68, or WCl-4.

a. Evaluate the loss of response capability. If the function requires more time to implement or cannot be implemented, evaluate the reportability requirements.
b. The Shift Manager will implement the compensatory measures as soon as practical.

4.2.3 For INPO 10-007 Category B equipment, verify the availability of redundant equipment to ensure the emergency preparedness function is maintained prior to removing the equipment for planned maintenance or testing.

a. Ensure that the equipment being removed from service is not being credited as a compensatory measure for another piece of equipment.
b. When redundant INPO 10-007 Category B equipment is not available to maintain the function, the affected INPO 10-007 Category B equipment is treated as INPO 1-007 Category A equipment.

IUse Category: REFERENCE Number: 13.14.11 Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 9 of 65 4.3 Degradation or Loss of Emergency Response Facilities (ERFs)

NOTE: Maintain ERFs, including alternate or backup facilities and their associated equipment, in a state of readiness. The following direction is related to planned maintenance and emergent issues and extends to all ERFs, including primary, alternate, and backup facilities as well as the equipment required to support their operation and habitability. Because of the broad scope of emergency preparedness functions conducted from these facilities, the loss of an ERF can have a significant impact on emergency plan implementation. Restoration of nonfunctional or degraded ERFs requires prompt management attention.

4.3.1 ERF Emergent Issues:

NOTE: Degraded or nonfunctioning equipment associated with these facilities is restored in a timely manner.

a. If primary power is lost to any ERF, then establish emergency power (if available).
  • b.

c.

If power cannot be restored to the ERF, then contact Emergency Preparedness to establish a backup or an alternate ERF (if available).

If INPO 10-007 Category B equipment used to perform a specified ERF function is lost or degraded, then verify the availability of redundant equipment. If redundant INPO 10-007 Category B equipment is not available, then treat the equipment as INPO 10-007 Category A.

d. If INPO Category A1 or Category A2 equipment used to perform a specified ERF function is lost or degraded, then implement the appropriate compensatory measures.
e. To ensure effective implementation of the emergency plan, keep the affected members of the emergency response organization informed of changes to ERF status or availability and any associated compensatory measures .

Number: 13.14.11 I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 10 of 65 4.3.2 ERF Planned Maintenance

a. Before a facility or its associated support equipment is removed from service, the Emergency Preparedness manager or designee should evaluate equipment and structural configuration changes that may impact Emergency Plan functions.
b. Identify and implement compensatory measures before the facility is removed from service or is otherwise rendered uninhabitable. Minimize the out-of-service time for the facility.
c. Maintenance should inform station management, including EP, of unanticipated delays in restoration.
d. To ensure effective implementation of the emergency plan, keep the affected members of the emergency response organization informed of changes to ERF status or availability and any associated compensatory measures.

4.3.3 ERF Restoration

a. In order to apply the appropriate priority and resources to the restoration effort, the Emergency Preparedness manager or designee notifies station management when the ERF or supporting ~quipment cannot be restored promptly.
b. Following the restoration of ERF electrical power after an unexpected loss, the center Emergency Planner wil( walk down the facility to ensure the necessary support functions are available including the following:
  • Habitability
  • Communications
  • Dose assessment
  • Lighting and electrical power
  • Computers and Intranet
  • Technical data acquisition and display 5.0 DOCUMENTATION None

I Use Category: REFERENCE Number: 13.14.11 Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 11 of 65 6.0 DEFINITIONS 6.1 Alternate indication - a backup means of monitoring a parameter or condition that should approximate the primary indication it is replacing.

6.2 Compensatory measure - a temporary means of mitigating the degradation or loss of an emergency response function or of maintaining the emergency response function until the equipment is restored to a fully functional condition:

6.2.1 A compensatory measure is the best available means to maintain the emergency preparedness function. Compensatory measures may include the use of redundant equipment.

6.2.2 Compensatory measures are put in place prior to scheduled equipment outages and design modifications and without delay following equipment loss or facility functional failures, to prevent or mitigate any loss of function that could result from the equipment being out of service.

6.2.3 Compensatory measures are incorporated into appropriate station processes, programs, and procedures. The station work management priority criteria appropriately address emergency preparedness equipment. Measures are in place to adjust work priorities when the compensatory measure put in place exceeds the time allowed in the evaluation or when the compensatory measure itself no longer maintains the emergency preparedness function.

6.2.4 Compensatory measures that rely on periodic monitoring also have an event-based trigger that prompts immediate and more frequent monitoring. For example, periodic sampling (such as once per shift) may be used to compensate for a nonfunctional ventilation radiation monitor. However, any increase in elevated area or airborne radiation levels in the affected buildings after the compensatory measure is put in place should trigger immediate and more frequent sampling.

6.3

  • Critical Digital Assets - Some of the components included in this document may be considered Critical Digital Assets. Contact Cyber Security Assessment Team (CSAT) for further information if necessary.

6.4 Emergency response facility (ERF) - facilities, buildings, and structures necessary to implement the site emergency plan

Number: 13.14.11 j Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 12 of 65 6.5 Equipment Important To Emergency Response (EP Equipment) -

6.5.1 Systems, structures, and components, as well as essential tools and equipment, necessary to implement the emergency plan.

6.5.2 The level of detail used in determining the functionality of these items should be sufficient to allow the shift manager (SM) or station leadership team members to identify any loss or degradation of function that supports the emergency plan.

6.5.3 Essential tools and equipment include facility computer links to the plant computer, dedicated telephone lines, handheld radiation survey meters, air samplers, and specially equipped radiation monitoring team vehicles. The loss or degradation of these items would result in the loss of an emergency response function, as identified in the emergency plan.

6.5.4 Nonessential tools and equipment are those items that, although useful, would not result in a loss of function or diminish the emergency response capability and that are not considered equipment important to emergency response. Nonessential tools and equipment include emergency response facility fax machines, white boards, furniture, and loudspeakers.

6.6 Functional readiness -

6.6.1 The capability of emergency response facilities and EP equipment to do what they were designed to do 6.6.2 Consult the documents listed in the References section for regulatory guidance related to "unavailable time" and restoration timeliness.

6.7 INPO 10-007 Category A1 equipment - equipment providing the sole indication or with little or no redundancy for a parameter used to assess an emergency action level (EAL) threshold.

6.8 INPO 10-007 Category A2 equipment- equipment providing the sole means of fulfilling an emergency response function.

6.9 INPO 10-007 Category B equipment- equipment having redundant components or trains that fulfill an emergency response function or redundant indications for a parameter used to assess an EAL threshold.

6.10 Loss of function - the inability of a facility, system, or component, including essential tools and equipment, to fulfill its emergency response purpose

IUse Category: REFERENCE Number: 13.14.11 Major Rev: 012 Minor Rev: NIA

Title:

EP Equipment Page: 13 of 65 6.11 Maintenance actions that restore -

6.11.1 Restoring the capability of an emergency response function by repair, overhaul, or replacement.

6.11.2 This includes servicing, parts replacement, surveillance, modification, and testing as defined in INPO AP-913, Equipment Reliability Process Description.

6.11.3 As required by INPO AP-928, Work Management Process Description, maintenance activities that impact emergency preparedness equipment, systems, or facilities must be controlled by a work management process specific to the process owner requirements.

6.11.4 This procedure applies to EP equipment that site personnel or their cpntractors normally control and maintain.

6.12 Plant equipment -

NOTE: In some cases, the equipment required to maintain emergency preparedness systems may be outside the scope of the plant work management process. In such cases, maintenance or repair of that

  • 6.12.1 equipment should be managed under processes applicable to the responsible organization.

Includes components defined by INPO AP-913, Equipment Reliability Process Description, as critical, noncritical, or run-to-failure 6.12.2 Plant equipment required to maintain federal or state regulatory compliance or emergency preparedness systems will be included in this grouping. If a component does not have a criticality code assigned per AP-913, the equipment should be considered run-to-failure.

6.13 Timely restoration - Actions site personnel take to return degraded or out-of-service EP equipment to service commensurate with the significance of the associated emergency response function .

Number: 13.14.11 I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 14 of 65

7.0 REFERENCES

7.1 INPO 10-007, August 2010 Equipment Important to Emergency Response 7.2 INPO 08-007, Emergency Preparedness Manual 7.3 SWP-MAl-01, Work Management Process Overview 7.4 SWP-SEC-11, Protection of Sensitive But Un-classified Information 7.5 PPM 1.3.68, Work Management Process 7.6 01-41, Operations Work Control Expectations 7.7 IMC 0609 Appendix B, Emergency Preparedness Significance Determination Process 7.8 INPO AP-913, Equipment Reliability Process Description 7.9 INPO AP 928, Work Management Process Description 7.10 10 CFR 54(q), Code of Federal Regulations

  • 7.11 NUREG 0696, Functional Criteria for Emergency Response Facilities 7.12 WCl-4, Online Work Control Processes 8.13 PPM 1.10.1 Notifications and Reportable Events 8.0 ATTACHMENTS 8.1 EP Related Important Equipment by EPN 8.2 EP Related Important Equipment by Function 8.3 EP Related Important Equipment - TSC 8.4 EP Related Important Equipment - OSC 8.5 EP Related Important Equipment - EOF (Building 34) 8.6 EP Related Important Equipment -Alternate EOF 8.7 EP Related Important Equipment - JIC 8.8 Unplanned Loss of Equipment 8.9 Planned Loss of Equipment
  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 15 of 65 EP RELATED IMPORTANT EQUIPMENT BY EPN J.*;Noun**Namef * * ...........

DescfiE?tfon; *. . ....... .* . . *... *.*

10~001>

        • ~.~* ~~CJ~i~~d.*Mo~e i<** ** Catego!Jl .* I
    • CAI i <t. . . . *. Arternate*lndication and/or
  • rn g .* Ill **

1...:111 :,;.* **** r

>** .}*:::*>*~***** Itt****** ... ........** ****** ........* ..**** ComQehsato~Measure .  :***.

                  • . * > ** i .. \ ./** <

Annunciator Off-gas Pretreatment P602.A5-3.3: Radiation Hi Hi Alarm. I I1 2 I I I I I 3

Establish periodic monitoring of Refer to EPN OG-RIS-612 "SJAE CONDRS A1 MU4.1 OG-RR-604.

Alternate Method OUTLET RAD Refer to ODCM 6.1.2.1.

Hi Hi" Annunciator Operating Basis Establish periodic monitoring of P851.S1-5.1. Earthquake alarm. I1 I2 I3 I4 I 5 I def I H13 P823 (Board L).

"OPERATING If seismic instrumentation BASIS B HU2.1 indications are not available, use Refer to EPN SEIS-SS-1 EARTHQUAKE" information in Attachment 7.4 of ABN-EARTHQUAKE to estimate seismic intensity level.

AEA-AD-51 TSC Notify the TSC EP Planner.

M.O. Exhaust Air I1 I 2 I 3 I 4 I 5 I def I If a FAZ signal occurs, manually Damper for AEA-FN-51 A2 NA close AEA-AD-51. Otherwise, consider relocating the TSC to the Main Control Room.

AEA-AD-52 TSC Notify the TSC EP Planner.

MO Suction Damper I 1 I 2 I 3 I 4 I 5 I def I If a FAZ signal occurs, manually for AMA-FN-52. A2 NA open AEA-AD-52. otherwise, consider relocating the TSC to the Main Control Room.

AEA-FN-51 TSC Exhaust Fan. Notify the TSC EP Planner.

I 1 I 2 I 3 I 4 I 5 I def I A2 NA If a FAZ signal occurs, de-energize the fan at PP-TSC-1.

AMA-AD-51 TSC Notify the TSC EP Planner.

MO Exhaust Damper I 1 I 2 I 3 I 4 I 5 I def I If a FAZ signal occurs, manually for AMA-FN-52 A2 NA open AMA-AD-51. otherwise, consider relocating the TSC to the Main Control Room.

AMA-CF-52 TSC Notify the TSC EP Planner.

AMA-FU-52 Charcoal I 1 I 2 I 3 I 4 I 5 I def I Establish periodic radiological Filter/Adsorber A2 NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • J Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 16 of 65

!I,:***T***,I***>i /1' ii* .Ne>uri'Na111~:t** }t1**?.cr:*,<C0111~: ,,* . . ._if:.

. iC '.:f .* ***

.*.*.;:. *.:: EPRegi.rired Mode 10-007  !>.*.** Alternate lndicatiortanctlor Com~ensatort Measure*'*******. i::i ,,: ; )

Descdetion: ****** /> .*Categotii /!Ii*******i*.~trr**-*I*1II AMA-FL-52 TSC Notify the TSC EP Planner.

AMA-FU-S2 Pre filter I1 J2 I 3 14 I 5 I def I Establish periodic radiological A2 NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

AMA-FN-51 AMA-AH-51 Notify the TSC EP Planner Recirculation Fan I1 J2 I 3 14 I 5 I def I Establish alternate cooling as A2 NA needed. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

AMA-FN-S2 TSC 1 12 3 14 Notify the TSC EP Planner.

Emergency Supply Fan I I I5 1 def I

Establish periodic radiological A2 NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

I s I def I AMA-FU-S2 TSC Notify the TSC EP Planner.

Emergency I1 J2 13 14 Establish periodic radiological HEPA/Carbon Filter A2 NA monitoring of the TSC. If a FAZ Unit occurs, consider relocating the TSC to the Main Control Room AMA-HF-S2 TSC 1 12 13 14 Is 1 def Notify the TSC EP Planner.

I I AMA-FU-S1 HEPA Establish periodic radiological Filter A2 NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

AOA-AD-S1 TSC M.O. Outside Air I1 J2 13 14 15 1 def I Notify the TSC EP Planner.

If a FAZ signal occurs, manually Damper A2 NA close AMA-AD-S1. Otherwise, consider relocating the TSC to the Main Control Room.

AOA-EHC-S1 TSC I1 J2 13 14 Js I def I A2 NA Notify the TSC EP Planner.

AMA-AH-51 Outside Establish alternate Air Duct Heater cooling/heating as needed.

Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 17 of 65

/} Noun Name/ *.... <Alternate Indication arid/ or

.* * * * *'> Descri(:!tionc * * :Compensatory Measure"*

AOA-FN-51 TSC Remote Air Intake Notify the TSC EP Planner.

Fan Establish periodic radiological A2 NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

AOA-V-51A TSC Remote Air Notify the TSC EP Planner.

Intake Isolation Valve I 1 I 2 I 3 I 4 I 5 I def I If a FAZ occurs, manually open A2 NA AOA-V-51A or 518, as appropriate. Otherwise, consider relocating the TSC to the Main Control Room ..

AOA-V-51B TSC Remote Air Notify the TSC EP Planner.

Intake Isolation Valve I 1 I 2 I 3 I 4 I 5 I def I If a FAZ occurs, manually open A2 NA AOA-V-51A or 51 B, as appropriate. Otherwise, consider relocating the TSC to the Main Control Room.

ARE-CR-51 TSC Chiller Notify the TSC EP Planner.

I 1 I 2 I 3 I 4 I 5 I def I Establish alternate cooling as A2 NA needed. Establish periodic temperature monitoring of the TSC.

ARE-TCV-1 TSC def Notify the TSC EP Planner.

AMA-CC-51 I1 I2 I3 I4 I5 I I Establish alternate Temperature Control A2 NA cooling/heating as needed.

Valve (Expansion Establish periodic temperature Valve) monitoring of the TSC. Verify ARE-TCV-2 is functional.

ARE-TCV-2 TSC def Notify the TSC EP Planner AMA-CC-52 I2 I 3 I4 I5 I I Establish alternate Temperature Control A2 NA cooling/heating as needed.

Valve (Expansion Establish periodic temperature Valve) monitoring of the TSC. Verify ARE-TCV-1 is functional.

Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • J Use Category: REFERENCE Major Rev: 012 Minor Rev: NIA

Title:

EP Equipment Page: 18 of 65 ARE-TIC-51 TSC Notify the TSC EP Planner.

Establish alternate cooling as Temperature needed. Establish periodic Indicating Controller A2 NA temperature monitoring of the For ARE-CR-51 TSC. If needed, establish alternate temperature control.

Notify the TSC EP Planner.

ARE-TIS-52 TSC Establish alternate A2 NA AOA-AD-51 Supply cooling/heating as needed Plenum Temp Switch ARM-RIS-1 Reactor Building 606' I 1 I 2 I 3 I 4 I 5 I def Fuel Pool Area ARM-RIS-1 / 2 RU2.1 OR A1 ARM-RIS-2 Reactor Building 606' RA2.2 HP monitoring during load I 1 I 2 I 3 I 4 I 5 I def movement over spent fuel Fuel Pool Area Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • j Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 19 of 65

<10~007 < ! J .EA~f: . * *. *. *. ***. * *. ~~. *. i.:. . *.; *.* .* . .*. *.* .**. .*. ; . *. I

  • ?;< .* < > . ** <*tf EPReguiredll\/lode*

)' . . Category> >/ . . . . . . . . . . . ** Alternate Indication and tof { < . *.*.C Compensatory Measure + . . *, <*** * *.<. *.o.*.**. m

.* .**.*.*. **.*m t.*.*.*.s.*.*.'.*.****...

ARM-RIS-4 Reactor Building 522' 2 East CRD Area ARM-RIS-5 Reactor Building 522' West CRD Area 2 5 I CG1.1 ARM-RIS-6 Reactor Building 572' 2 5 H2 Recombiner Area CG1.2 A1 ARM-RIS-7 Reactor Building 501' FS1.1 Tl P Drive Area FA1.1 ARM-RIS-8 Reactor Building 572' SGT System Area ARM-RIS-9 Reactor Building 422' "A" RHR Pump Room RA3.1 Refer to PPM 13.8.1 Alternate Method ARM-RIS-10 Reactor Building 422' 1 2 3 14 5 def "B" RHR Pump Room CG1.1 A1 CG1.2 FS1.1 FA1.1 ARM-RIS-11 Reactor Building 422' 1 2 3 4 5 CG1.1 1 1 1 1 1 1 "C" RHR Pump Room A1 CG1.2 ARM-RIS-12 Reactor Building 422' 3 4 RCIC Pump Room 1 1

! 2 1 1 1 5

1 FS1 .1 ARM-RIS-13 Reactor Building 422' 1 2 3 4 5 FA1.1 1 1 1 1 1 1 HPCS Pump Room Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 20 of 65 Iii**;<<.~(.. .I*****

  • Descri,2tion

/N6uri Nainef '.:*/::-.,:- .....

... ? '.::::f/1:::*:** i Ef> Regutred M6de *. </:;.'/; './ 10sOO'fi>

/ . \ '.I;=)'\/:::::-***

. *7tl*.

. Categoi:y I < >I Afternate lridfoatiori and for i Coin,2ensaforl/Measure

I
    • .*****:* Commerits/i***

\>

ARM-RIS-19 Rad Waste Building RA3.1 501' I 1 I 2 I 3 I 4 I 5 I def I CG1.1 Main Control Room CG1.2 Non-wireless Area Radiation A1 Monitor FS1.1 FA1.1 ARM-RIS-23 Reactor Building 422' CG1.1 CRD Pump Room I1 I2 I3 I4 I5 I I CG1.2 Refer to PPM 13.8.1 ARM-RIS-24 Reactor Building 471' 2 4 5 Alternate Method 1 3 Northwest Area I I I I I I I A1 FS1.1 5.3.1 Table 24 FA1.1 ARM-RIS-30 Radwaste Control Rm RA3.1 I1 I 2 I 3 I 4 I 5 I def I CG1.1 CG1.2 Refer to PPM 13.8.1 A1 FS1.1 FA1.1 ARM-RIS-32 Reactor Building 471' CG1.1 High Range ARM I1 I2 I3 I4 I5 I I CG1.2 Refer to PPM 13.8.1 ARM-RIS-33 Reactor Building 501' FS1 .1 High Range ARM I 1 I 2 I3 I4 I5 I I A1 FA1.1 5.3.1 Table 24 Alternate Method ARM-RIS-34 Reactor Building 606' ARM-RIS-1/2 High Range ARM I 1 I 2 I 3 I 4 I 5 I def I RU2.1 OR A1 RA2.2 HP monitoring during load movement over spent fuel Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • IUse Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 21 of 65

<>>).5f.ti

  • < /;

. * / . /*.**.** **.*. * .** ...*

  • Noun NameI

.*. >.>* Y>> * * *.*** * * ** *****. .*Description<*

CMS-LR-3 Suppression Pool Level Recorder I I2 I3 I4 I 5 I CA 1.1 CU1.1 CG1.2 B CS1.2 Redundant Instrument HCTL MA3.1 CMS-LR-4 Suppression Pool 2 3 4 5 Level Recorder 1 1 1 1 I MU3.1 MS6.1 CMS-PR-1 Primary Containment Pressure J 2 13 14 15 1 CG1.1 CMS-PR-2 Primary Containment Pressure 1 12131415 I CG1.2

  • PC Loss B FA1.1 Redundant Instrument
  • RCS Loss CMS-PR-3 Wetwell Pressure 121314151 FS1.1
  • HCTL FG1.1 CMS-PR-4 Wetwell Pressure 121314151 CMS-RIS-27E In-Containment Hi Range Area Radiation 1 I2 13 I I I
  • PC Potential Loss FA1.1 Readout CMS-RIS-27 A/B OR Perform
  • RCS Loss FS1.1 Core Damage Estimate if needed CMS-RIS-27F In-Containment Hi B
  • Fuel Clad Loss Range Area Radiation I2 13 I FG1.1
  • URI Readout Attachment 8.1, EP Related Important Equipment by EPN
  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 22 of 65 oun Namtf1 * * *1ternate 1nc1,cation**and1 escriE!tion /*** :icl~;i~~J 11,:1com12ensatorv*MeasUre**

CMS-SR-13 H2/02 Analyzer CG1.1 B CG1.2 CMS-SR-14/13

  • PC Potential Loss CMS-SR-14 H2/02 Analyzer I4 I5 I CMS-TR-5 Wetwell Temp MA3.1 I1 I2 I3 I I I B PC Potential Loss MU3.1 Redundant Instrument "

CMS-TR-6

  • HCTL MS6.1 EDR-FRS-623 Reactor Bldg CA1.1 EDR-FT-37 and I2 I3 I4 I5 I CU1.1 Drywell FDR-FT-38 A1 Manual Determination Recorder MU5.1 E-LP-TSC1 TSC Lighting Power Notify the TSC EP Planner.

Supply I 2 I 3 I 4 I 5 I def I A2 NA Relocate TSC E-MC-7AB TSC power supply. Notify the TSC EP Planner.

I 1 I 2 I 3 I 4 I 5 I def I A2 NA Relocate TSC E-PP-TSC1 TSC Power Panel Notify the TSC EP Planner.

I 1 I 2 I 3 I 4 I 5 I def I A2 NA Relocate TSC 125 voe VITAL DIST E-VM-DPS1/1 PNL S1/1 I1 I2 I3 I4 I 5 I CU4.1 MS2.1 Local voltmeter or on back of A1 remote indication meter.

MG1.2 E-VM-DPS1/2 125 voe VITAL DIST CU4.1 PNL S1/2 I1 I2 I3 I4 I5 I Local voltmeter or on back of A1 MS2.1 remote indication meter.

MG1.2 Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 23 of 65

,**,>***Noun.Nainel /Alternate.*1ndication>andfor)>

    • *.* *** . mescri[!tion *****************coinpensatorjMeasure** <<*******
  • FDR-RIS-606 Radwaste Liquid Perform Sample and Verify Effluent Rate meter Release Rate Calculation Prior to RA1.2 Release.

RHR "A" pump room FDR-LS-41 level high annunciator 12 13 14 js I RHR "B" pump room FDR-LS-42 level high annunciator 1 12 13 14 js I I A2 CG1.2 RHR "C" pump room FDR-LS-43 level high annunciator 12 1314 js I I CS1.2 CA6.1 Visual once per shift RCIC pump room level FDR-LS-44 high annunciator !2 13 14 js I MA8.1 HU3.2 LPCS pump room level FDR-LS-4S high annunciator 12 13 14 js I HPCS pump room FDR-LS-46 level high annunciator 12 13 14 js I Spent Fuel Pool Water FPC-Ll-21 Level i 1 12 13 14 js I def I B RG2.1 RS2.1 FPC-LIT-21A, 218 or 21 OR Spent Fuel Pool Water Prefered compensatory FPC-LIT-21A Level 1 i2 13 14 js I def I RA2.1 Visual twice per Shift OR measure is a level Skimmer Surge Tank Low Level indicator RA2.3 Not In With FPC Flow FPC-LIT-21 B Spent Fuel Pool Water Level i 1 12 13 14 js I def I RU2.1 Attachment 8.1, EP Related Important Equipment by EPN I

L-

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: NIA

Title:

EP Equipment Page: 24 of 65

!\i ~r .*.\* .. Noi:it'l Name/> *.* .. ><EP Reguited*Mode <:>10-001* .,

-:<c. :\* . ~ltern~te lridicatiohand/ ~f <*. . .*. . i<******<*.com~,:i;;,;****u i:: /i'""'

Ii.,. . .<.*.*<*.***.<*****

  • m;! }// oesc::ri~tioh * .**::*:.:,.:",:::..:., ?Categoi:y*** . . :. I ** ; Com~ensatoi;y: Measurer, . *** L i <i::nL LD-TE-3A/B RWCU-P-1A Rm I1 I2 I3 I I I I LD-TE-3C/D RWCU-P-18 Rm I 1 I2 I3 I I I I RCIC Pump Rm LD-TE-4A/B I1 I2 I3 I I I I LD-TE-18A/B RHR-P-2B Rm I1 I2 I3 I I I I LD-TE-18C/D RHR-P-2A Rm I1 I2 I3 I I I I LD-TE- RHRA HX Rm 18E/F/G/H I1 I2 I3 I I I I FA1.1 RHR B HX Rm LD-TE-18J/K/UM I I I 1 2 3 I I I I B FS1.1 Use Leak Detection temperature element in same vicinity PC Loss RCS Potential Loss FG1.1 LD-TE-24A/B RWCU Pipe Area RB 1 2 3 548 N (R509) I I I I I I I LD-TE-24C/D RWCU Pipe Area RB 548 S (R511) I1 I2 I3 I I I I LD-TE-24E/F RWCU Pipe Area RB 522 N (R408) I1 I2 I3 I I I I Above RWCU Pump LD-TE-24G/H Rooms RB 522 (R409) I1 I2 I3 I I I I LD-TE-24J/K TIP Mezzanine RB 501 NE (R313) I1 I2 I3 I I I I LD-TE- Main Steam Tunnel 31A/B/C/D I 1 I2 I 3 I I I I Attachment 8.1, EP Related Important Equipment by EPN
  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 25 of 65 c:Noun**Namef >. . EP Required Modei_ //10-007 *. *****i:::it.1 .. : Alternate Indication and I or lr> .... ;:~*****I***.*** . .* .* * ** }!\Jf ************Description . **

Primary Control Rack

) .** ~ : . t i *. Category **. '.: m;;;-: < .. Coiripensatory: Measure<

Channel B Met Tower l ***.*r}:: *. \ :/:

                      • .*.comm~It/:if

/\

MET-CPU-1A CPU 1 I 2 I 3 I 4 I 5 I def I instruments FFTF is Alternate B N/A METHOD Hanford FFTF Website MET-CPU-1B Backup Control Rack Channel A Met Tower CPU I1 I2 I3 14 I 5 I def I B N/A instruments FFTF is Alternate METHOD Hanford FFTF Website MET-TE-10A Primary 245' 1 2 3 def 245' temperature on Channel B Temperature Element I I I I4 I5 I I B NIA on eDNA/PDIS FFTF is Alternate METHOD Hanford FFTF Website MET-TE-10B Backup 245' 245' temperature on Channel A Temperature Element I 1 I 2 I 3 I 4 I 5 I def I B N/A on eDNA/PDIS FFTF is Alternate METHOD Hanford FFTF Website MET-TE-11A Primary 33' 33' temperature on Channel B on Temperature Element I 1 I 2 I 3 I 4 I 5 I def I B N/A eDNA/PDIS FFTF is Alternate METHOD Hanford FFTF Website MET-TE-118 Backup 33' 33' temperature on Channel A on Temperature Element I 1 I 2 I 3 I 4 I 5 I def I B N/A eDNA/PDIS FFTF is Alternate METHOD Hanford FFTF Website MET-TR-1 Temperature Recorder Delta temperature (245'-33') on I1 I2 I3 I4 I5 I def I B NA Channel A or B on eDNA FFTF is Alternate METHOD Hanford FFTF Website MET-WDR-4 Wind Direction 33' wind direction on Channel A Recorder I 1 I 2 I 3 I 4 I 5 I def I B NA or Bon eDNA FFTF is Alternate METHOD Hanford FFTF Website MET-WMON-2A Primary 33' Wind 33' wind speed/direction on Speed/Direction I1 I2 I 3

I 4 I 5 I def I B N/A Channel B on eDNA/PDIS FFTF is Alternate Monitor METHOD Hanford FFTF Website Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • 1Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 26 of 65 1>** ** .\Noi:i11Name ,.***  :.1QaQ()7/.** Alterhatel11dfoatiori and for>

  • I*.*******: I*i**~*.*.I*1.** **.* ii ......... Descriution/ *********.**>/ .. !:P********Beguired*.~~~~**J (\*<?.*

I

  • TCatego!}! !Mi*****E~t. . *.*.*. \. :** "<,

tCom12ensatonr*Measure, * ****r/ t.i.T~~~ej~~ }\*****\:I

... / *. *. .

MET-WMON-2B Backup 33' Wind 33' wind speed/direction on Speed/Direction I 1 I 2 I 3 I 4 I 5 I def I N/A Channel A on eDNA/PDIS FFTF is Alternate Monitor B METHOD Hanford FFTF Website MET-WSR-4 Wind Speed Recorder CA6.1 33' wind speed on Channel A or I1 I2 I3 I4 I5 I I B Bon eDNA FFTF is Alternate MA8.1 METHOD Hanford FFTF Website MS-LR-615 RPV Level - Fuel Zone CG1.1 I1 I2 I3 I4 I5 I I CS1.1 CS1.2

  • SAG Entry B Redundant Instrument FS1.1
  • Fuel Clad Loss MG1.1 MS6.1 MS-LR/PR-623A RPV Press & Level Recorder (Post Ace I I I I4 I5 I I CktA) CS1.1 Redundant Instrument Potential HCTL MS-LR/PR-623B Post Accident Mon B CA1.1 4 5 Instr Loop B Press & I I I I I I I Level Recorder OFMA-HF-1C HEPA Filter Bank for AHU1 Cold Deck I 1 I 2 I 3 I 4 I 5 I def I A2 NA Notify EOF Emergency Planner EOF confirms habitability upon reporting and relocates if necessary OFMA-HF-1H HEPA Filter Bank for EOF confirms habitability AHU1 Hot Deck I 1 I 2 I 3 I 4 I 5 I def I A2 NA Notify EOF Emergency Planner upon reporting and relocates if necessary OFMA-HF-3 EHPA Filter bank for EOF confirms habitability supply fan 3 I1 I2 I3 I I I I A2 NA Notify EOF Emergency Planner upon reporting and relocates if necessary Attachment 8.1, EP Related Important Equipment by EPN
  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 27 of 65

.* ./ ~,.,'l ,. * . I'.( >.******Nouri Name/ . / . . **.::,****EPReguited*Mdde*.*i********* T <10-00'7' ....

. . \DescriRtion.*.***** .. >r*  :::,:}/h:.\(:: Catego!Y*.

> t7f.~.I

  • A1ter11ate* 1ndicatidn*a11dt or: Ci

..... \ CorriRerisat<>ty Meas I.Ire < . . . . *.

  • I ...* *.*go111,:;~?ts*/*:*t********* ..

OG-RIS-612 Off-Gas Pretreatment Refer to EPN -

Rad Rate meter I1 I2 I3 I I I I Refer to ODCM 6.1.2.1 and PPM Annunciator P602.A5-3.3:

A1 "SJAE CONDRS OUTLET MU4.1 13.8.1 RAD Hi Hi" Alternate Method PRM-DPT-2 Reactor Building Flow RG1.1 PRM-SQRT-2 Rate Instruments I 1 I 2 I 3 I 4 I 5 I def I RS1.1 Alternate Method ODCM PRM-Fl-2 A1 Refer to ODCM 6.1.2. D RA1.1 6.1.2.D RU1.1 PRM-RE-18 Reactor Building Direct HP to establish Stack Door Exhaust, Intermediate I 1 I 2 I 3 I 4 I 5 I def I Monitor (SDM) per PPM 11.2.24.2 -- radiation monitoring RU1.1 SDM is Alternate A1 at the RB Stack Access Door (R-METHOD DOOR-R515). SDM readings are obtained from HP or from eDNA Point EP99M in ENW.WRM.

PRM-RE-1C Reactor Building Direct HP to establish Stack Door Exhaust, High I 1 I 2 I 3 I 4 I 5 I def I Monitor (SDM) per PPM RG1.1 11.2.24.2 -- radiation monitoring RS1.1 at the RB Stack Access Door (R- SDM is Alternate A1 DOOR-R515). SDM readings are METHOD RA1.1 obtained from HP or from eDNA Points EP99M or EP99H in ENW.WRM.

REA-R1S-609A-D Reactor Building Vent I 1 I 2 I 3 I 4 I 5 I def I B RA2.2 Redundant Instrument RFW-Pl-605 Reactor Pressure I I I I4 I5 I I B CA3.1 Redundant Instrument

  • PC Potential loss (0-1200 psig)
  • HCTL RWCU-Tl-607 RWCU-P-1A, 18 Only accurate if an RRC Discharge Header I I I I4 I5 I I CA3.1 Temporary Thermocouples or pump is running and B RPVRTDs RRC-TR-650 RHR-Temp CU3.1 RWCU flow is greater TRS-601 than 50 gpm.

Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 28 of 65

  • *. *. Nou11'Narne'r < * / EPRegufred 1Mode' '>* ****>Alternate lildicationandio,,, +

. *.* Descri tion ' ,.,., , . . . ,,***<cornpeilsatory*Measure >>:/{!

SEIS-SS-1 Triaxial Acceleration Establish periodic monitoring of Refer to EPN-Seismic Switch I 2 I 3 I 4 I 5 I def I HU2.1 H13 P823 (Board L red lights). Annunciator P851.S1-5.1:

A1 Refer to PPM ABN-Earthquake if "OPERATING BASIS full instrumentation is lost. EARTHQUAKE" SGT-FT-1A1 SGT A-1 Flow 2 3 I4 I5 def B NA Field Team Results SGT-FT-1A2 SGT A-2 Flow 1 2 3 I4 I5 def B NA Field Team Results SGT-FT-181 SGT 8-1 Flow 2 3 I4 I 5 def B NA Field Team Results SGT-FT-182 SGT 8-2 Flow 2 3 I4 I5 def B NA Field Team Results Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 29 of 65

.... Noun Namer. }

  • 1'tternate  : <. ' .
.f I .* seli
:::e:;~fguirf.~. ~(de ** fi**i <<1Categ<>!Y

' Ql()()7 *.. *lntlrcation<and/ or *. .*;* ..

Comments

<i *. . . .< ' ( ..

I* 1

.... Descri~tioit ,* :*************7~~!.]iI ,.. :com~ensatoD£Measure

  • SOFT-TECH- Electronic CNF on LAN ECN I 1 I 2 I 3 I 4 I 5 I def I B NA Form 24075 SOFT-TECH- eDNA Application EDNA Service I 1 I 2 I 3 I 4 I 5 I def I B NA eDNA Real Time Client or POIS Dose Software Emergency Dose RA1.1 Projection System I 1 I 2 I 3 I 4 I 5 I def I RS1.1 Redundant dose projection B

station or Table 3 of PPM 13.1.1 RG1.1 SPTM-Tl-5 Suppression Pool Avg Temp I1 I2 I3 I I I I MA3.1 B MU3.1 Redundant instrument

  • PC Potential Loss SW-RIS-604 RHR-HX-1A/B Outlet SW-RIS-605 Radiation I 1 I 2 I 3 I 4 I 5 I def I RU1.1 Perform grab sample every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and analyze for See PPM 1.10.1 A1 (0.1-1,000,000 CPS) radioactivity TDAS-SOFT- Plant Data Information POIS System (Control I 1 I 2 I 3 I 4 I 5 I def I B NA Control Room instruments Room)

TEA-FT-13 TG Building Elevated Release Air Flow I 1 I 2 I 3 I 4 I 5 I def I A1 NA Refer to ODCM 6.1.2.D Alternate Method per PPM 13.8.1 TEA-RIS-13 Turbine Building Refer to PPM 13.8.1 Exhaust I 1 I 2 I 3 I 4 I 5 I def I RG1.1 Attachment 7.6 for converting frisker readings RS1.1 Notify Chemistry to set up (in cpm) to equivalent A1 RA1.1 Sample Cart (Frisker in a Brick) TEA-RIS-13 readings (in per 12.5.358 µCi/cc).

RU1.1 Sample cart is an Alternate METHOD.

Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 30 of 65

/ EPReguired*Mode:< ** .* ,10-001***

. *. . .*. ;:**~i.}*. . .*i NounName/

.) DescriQtion *********.Jt., tategoi:y  :., ::E~~!,S.C'. *..*****>* t!ternateh1dicationan~ifor

ComQensatort Measure :

1.*

    • /**J.r********

Comments

  • .**/) .i \

TSC-CP-RAD/1 TSC Radiation Notify the TSC EP Planner.

Monitoring Rack I1 12 I3 14 I5 1 def I Establish periodic radiological A2 NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

TSC Mechanical Notify the TSC EP Planner.

TSC-FN-21 Equipment Room I1 12 I3 14 I 5 I def I Establish periodic radiological 1-3 CFM Sample A2 NA monitoring of the TSC. If a FAZ Pump occurs, consider relocating the TSC to the Main Control Room.

TSC Airborne Notify the TSC EP Planner.

TSC-RE-1A Radiation Detector - I1 12 I3 14 I 5 I def I Establish periodic radiological Particulate A2 NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

TSC Airborne Notify the TSC EP Planner.

TSC-RE-18 Radiation Detector - I 1 12 13 14 I 5 I def I A2 Establish periodic radiological Iodine NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

TSC Airborne Notify the TSC EP Planner.

TSC-RE-1C Radiation Detector - I1 12 I3 14 I 5 I def I A2 Establish periodic radiological Noble Gas NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

TSC Airborne Notify the TSC EP Planner.

TSC-R1S-1A Radiation Monitor - I1 12 I3 14 I 5 I def I A2 Establish periodic radiological Particulate NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

TSC Airborne Notify the TSC EP Planner.

TSC-RIS-1B Radiation Monitor - I1 j2 13 14 js I def I Establish periodic radiological A2 Iodine NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 31 of 65 iN<>ilff Name'l/'.***.* *** Alt~rn~tEl* lndfoation~rid*tr*

  • . DeiforiQtion L * .+.ycom~ensato!5{/MeasUre***

TSC-R1S-1C TSC Airborne Notify the TSC EP Planner.

Radiation Monitor - Establish periodic radiological A2 NA Noble Gas monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

TSC-RR-1 TSC Airborne Notify the TSC EP Planner.

Radiation Monitor 1

I 2 I 3 I 4 I 5 I def I Establish periodic radiological Recorder A2 NA monitoring of the TSC. If a FAZ occurs, consider relocating the TSC to the Main Control Room.

TSW-RIS-5 Ratemeter-Plant Serv Water Sample Rack I 2 I 3 I 4 I 5 I def I A1 RU1.1 Perform grab sample once per shift See PPM 1.10.1 TSW-SR-34 WEA-RIS-14 Rad Waste Building Refer to PPM 13.8.1 Exhaust I 1 I 2 I 3 I 4 I 5 I def I RG1.1 Attachment 7.6 for converting frisker readings RS1.1 Notify Chemistry to set up (in cpm) to equivalent A1 Sample Cart (Frisker in a brick)

RA1.1 WEA-RIS-14 readings (in per PPM 12.5.37.

µCi/cc).

RU1.1 Sample cart is an Alternate METHOD.

WEA-SUM-1 RW Bldg Exhaust NA Stack Air Flow I 2 I 3 I 4 I 5 I def A2 Refer to ODCM 6.1.2. D Alternate Method END Attachment 8.1, EP Related Important Equipment by EPN

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 32 of 65 Emergency Response Facility Function - Alternate Emergency Preparedness is As determined by EOF A2 NA Emergency Preparedness to be informed prior to ANY maintenance activity in this center.


*--*-**--*------------*****-**--*-h===r=,===;===r=r===n---*--*--..--..----*---* _.._, _________..__________..__..____.._ ...._,_....._____ "*-*-..*---*-*--..-*_..____.._ ..___.._ .._

~~::::jection I 2 I 3 I 4 I 5 I def I RG1.1 Stand alone software installed on selected RS1.1 Perform dose projections B individual computers RA1.1 in other centers EAL Table 3 Inter Facility Communications 1 2 I 3 1 4 1 s I def 1 Dedicated X300 and x500 Circuits B NA Dial-Up Line Ring down Line B NA Commercial Line Commercial Line No satellite phone assigned B NA Satellite Phone to the Alternate EOF. One available in the JIC.

FAX B NA Scan documents to email Field Team Radios Field Teams would be B NA Cell Phone dispatched to the plant to retrieve Field Team vehicles Ventilation Initiate work request Contact EOF Planner B NA Establish alternate cooling/heating as needed Attachment 8.2, EP Related Important Equipment by Function

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: NIA

Title:

EP Equipment Page: 33 of 65 INPO 10~()()1/ [;~lternate Indication and.>*

.... >i Cate~of¥:::** **(<***IO~* C~~aiti~:~~~'Y***.** ****.

Emergency Response def (Control Facility Function - Control B NA Remote Shutdown Room Room) Room AC Power 1 2 1 3 1 4 1 5 1 def 1 PPM 5.6.1 - Station B NA Blackout Dose Projection Standalone software 11 1 2 1 3 1 4 1 5 1 def 1 RG1.1 Software installed on selected RS1.1 Perform dose projections B individual computers RA1.1 in other centers EAL Table 3 Inter Facility Communications I1 1 2 1 3 1 4 1 5 1 def 1


* -------*-- ------------* *1----*--**-**-----*--~

Dedicated X300 ABN-Communication and x500 Circuits B NA Dial-Up Line Dial-Up Line ABN-Communication B NA Commercial Line Ring down Line ABN-Communication B NA Commercial Line Commercial Line ABN-Communication Satellite phone stored in B NA Satellite Phone TSC FAX B NA Scan documents to email Repair Team Radios B NA Plant phone system Ventilation I1 12 1 3 1 4 1 5 1 def I B NA ABN-HVAC Attachment 8.2, EP Related Important Equipment by Function

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 34 of 65

  • <tNPO 10-007'
  • Alternate Indication and,
  • }Catef:l~f'I,;***. , or Compensatorv .

_,.,, Measi.ire<c * * * * * * *

  • Emergency Response See PPM 1.10.1 Facility Function - EOF Emergency Preparedness is B NA Alternate EOF to be informed prior to ANY maintenance activity in this center.

AC Power 115 KV Line supplies power 12 I 3 I 4 Is I def I to Kootenai - EOF.

B NA Diesel (Bldg 34 DG) Diesel (Bldg 34 DG) supplies EOF Backup Power for RED Outlets and Emergency Lighting Standalone software Dose Projection 12 I 3 I 4 Is I def I RG1.1 installed on selected Software RS1.1 Perform dose projections B individual computers RA1.1 in other centers EAL Table 3 Health Physics Center Decontamination 11 I 2 I 3 I 4 I 5 I def I

. . B NA Use decontamination facilities located in-plant Shower


***--*---*---..--*---**---- -*-**-**-**-----*- *--*****-**--*-*--*-- (RW_487') and at EN_OC-*-** --*--*-----*-*--**-*-**-*-*--*-----

Health Physics Center Contact EOF Planner ERO to implement alternate Receiving Area B NA location as defined by Initiate work request 13.11.7 Inter Facility Communications 12 I 3 14 I sI def I Dedicated X300 B NA Dial-Up Line and x500 Circuits Dial-Up Line B NA Commercial Line Ring down Line B NA Commercial Line Commercial Line B NA Satellite Phone FAX B NA Scan documents to email

-*----*-**--------} -------1-------1---*---*---

Field Team Radios B NA Cell Phone Attachment 8.2, EP Related Important Equipment by Function

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 35 of 65

+r !;.Alternate Indication and**

  • ' */*or. comperit:iator;Y >
  • ** Meas Ure ;, * **

Contact facilities and confirm Kootenai HVAC EOF confirms habitability B NA Establish alternate upon reporting and relocates if necessary.

cooling/heating as needed Air Handling Unit 1 Verify normal Kootenai AHU-1 HVAC available Backup to normal Kootenai A2 NA HVAC Relocate to Alternate EOF HVAC Test performed f--------f-----------EOF if necessary ____ quarterly ~ MWO OOGCF3 Fan SF-3 Verify normal Kootenai HVAC available A2 NA Supply Fan 3 Relocate to Alternate


+-------1--E_O_F_i_f_ne_c_e_s_sa_ry_,_ ____1_ _ _ _ _ _ _ _ _ _- l Radiation Monitor, Confirm no release in Intake Air progress Only required if center is A2 NA activated.

Shift to filtered air if 1-----------1 release in prog~~.:'~----1------

Radiation Monitor, Confirm no release in Return Air progress Only required if center is A2 NA activated.

Shift to filtered air if release in progress Attachment 8.2, EP Related Important Equipment by Function

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 36 of 65 Notify JIC Planner Emergency Preparedness is A2 NA As determined by to be informed prior to ANY Emergency Preparedness maintenance activity in this center.

AC Power I 2 13 I 4 I 5 I def I B NA Diesel backup power Inter Facility Communications Dedicated X300 B NA Dial-Up Line and x500 Circuits Dial-Up Line B NA Commercial Line Ring down Line B NA Commercial Line Commercial Line B NA Satellite Phone FAX B NA Scan documents to email Ventilation Initiate work request Contact JIC Planner B NA Establish alternate cooling/heating as needed News Conference Capability- 12 I 3 I 4 I s I def I B NA MPF Auditorium Skamania Room Walkley Rm Attachment 8.2, EP Related Important Equipment by Function

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 37 of 65 Emergency Response See PPM 1.10.1 Notify OSC Planner Facility Function - OSC Emergency Preparedness is A2 NA Relocate the OSC as per to be informed prior to ANY "OSC Manager Checklist" maintenance activity in this (Form 26522) center.

AC Power Relocate the OSC as per 1 2 I 3 1 4 I 5 I def I B NA "OSC Manager Checklist" (Form 26522)

Inter Facility B NA Communications 1 2 1 3 1 4 I 5 I def I Dedicated X300 and x500 Circuits Dial-Up Line Dial-Up Line Commercial Line 1----------------------

Ring down Line Commercial Line Commercial Line OSC has no Emergency None Response Function that requires commercial lines._

FAX Scan documents to email Repair Team Plant phones Radios TSC Building Initiate work request Ventilation 1 2 1 3 1 4 I 5 I def I Contact OSC Planner OSC confirms habitability B NA upon reporting and relocates Establish alternate if necessary cooling/heating as needed Attachment 8.2, EP Related Important Equipment by Function

Number: 13.14.11

  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 38 of 65 Alternate lndicatiorfand

. * . Tfofcompensatory**.* .

... *fMeasurei<?i'** '

NA Emergency Response Notify OSC Planner See PPM 1.10.1 (TSC) Facility Function - TSC I 2 1 3 1 4 1 5 1 def 1 Emergency Preparedness is B NA Relocate the TSC as per to be informed prior to ANY "TSC Manager Checklist" maintenance activity in this (Form 26506) center.

AC Power Relocate the TSC as per 1 2 I 3 1 4 I 5 I def I B NA TSC Manager Checklist" See Attachment 8.1 (Form 26506)

Dose Projection 1 Standalone software 1 2 I 3 I 4 I 5 I def I RG1.1 Software installed on selected RS1.1 Perform dose projections B individual computers RA1.1 in other centers EAL Table 3 Inter Facility B NA Communications I 2 1 3 1 4 I 5 I def I 1------------*----

Dedicated X300 and x500 Circuits Dial-Up Line Dial-Up Line Commercial Line Ring down Line Commercial Line Commercial Line Satellite Phone


1 FAX Scan documents to email Ventilation Initiate work request 1 2 I 3 1 4 I 5 I def I TSC confirms habitability Contact TSC Planner upon reporting and relocates B NA if necessary Establish alternate cooling/heating as See Attachment 8.1 needed Attachment 8.2, EP Related Important Equipment by Function

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 39 of 65 Alternate Indication and<

  • . tor compensatory \
  • Measure>> '*

--*------------! ------**--*---*------------l Auto-Dialer Required only when Radio B NA Planner Call-Tree Paging System unavailable Normal Power NA Backup Generator Also powers company B


**--*---* - * - - - - - - * - - - - - - * - - - - - phone system Backup Generator Required only when Confirm Normal Power normal power unavailable B NA Contact Emergency Backup generator known as Preparedness TEL-COM-GEN,30-209, or DG-2(TEC) 1------------1 Cellular Phone B NA Commercial Line


.f-----*-***-------1 1 - - - - - - - - - - -NA Commercial Line B Cellular Phone

---1 *------+--- --------

Radio Paging Manual Activation Radio paging is the B NA OR primary method of ERO notification.

Auto Dialer Public Address Make PA Announcement B NA from other center.

NA NRC Notification Function B NA See PPM 1.10.1 (NRC 12 I 3 I 4 I s I def I Notification) ENS Line Commercial NRC HOO Line HPN Line Commercial Line 1------------

ERDS Verbally via ENS_~_a_ll_ _ .

1 FTS 2001 Commercial Line Attachment 8.21 EP Related Important Equipment by Function

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 40 of 65 CRASH Line Dial-Up Line Dial-Up Line Commercial Line Commercial Line Alternate phone switch (377,_ 372, 375) _____**-*****---****-****---**-*-*-----*****

Normal Power Backup Generator Also powers company

---****-*-----*-*-*-***--*** __ phone system *-****-*-*--****-***

Backup Generator Backup generator known as Confirm Normal Power TEL-COM-GEN,30-209, or DG-2(TEC)

Contact Emergency Required only when Preparedness

---*-****---***-**-*--_normal power_unavailable Radio Alternate channels Commercial Line LERN Commercial Line SCAN Commercial Line FAX CRASH Line Commercial Fax Attachment 8.2, EP Related Important Equipment by Function

  • Number: 13.14.11
  • \ Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 41 of 65 NA Site Evacuation Notification See PPM 1.10.1 Function CGS Site Evacuation Public Address or Area Siren System Sweep B NA HNES Units Area Sweep NA Pulic Alert & Notification See PPM 1.10.1 System (ANS) Function \ 2 \ 3 \ 4 \ 5 \ def \

Sirens (Primary Public For single siren loss:

ANS) For siren system loss: Contact IS to confirm Confirm functionality of functionality of adjacent ETNS system. sirens Emergency Telephone Contact County EM Staff Notification System Confirm functionality of (ETNS) (Backup B NA Public ANS Siren system.

and ETNS vendor for resolution as needed Public ANS)

Tone Alert Radios **TARs are in very limited (TARs)** use within the CGS 10-Mile KONA AM/FM Radio Emergency Planning Zone.

KORD FM Radio See CGS ANS Design Report for details.

END Attachment 8.2, EP Related Important Equipment by Function

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 42 of 65 Equipment< I or Compehsatory*** **.

  • Category .*.*.* ** * . Measure B NA Contact IS Chemistry I Effluent Engineer 1 Engineer 2 Engineer 3 Information Coordinator NRC Liaison NRC Computer Print station w/ large PORTAL J or hard copies CPU and Monitor monitor from TSC Library NA Printers/Copiers B NA Contact IS (TSC)

Print Station Plotter Printer, Engineering Area Lan Printer/Copy Contact Vendor Also for OSC Machine NA Fax Machines B NA Contact IS Also for OSC (TSC) ----**---***

Dedicated Commercial Attachment 8.3, EP Related Important Equipment-TSC

  • Number: 13.14.11
  • J Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 43 of 65 i' 11Neo10:.:oof

> Equipment+

  • cateEJor:v . ,.

NA Headset, Information B NA Contact IS (TSC) Coordinator NA Telephone B NA Contact IS Inventoried / tested by (TSC) 1 2 1 3 1 4 1 s J def J Telecom TSC Manager Operations Manager Radiation Protection Manager Technical Manager Plant/NRG Liaison Administrative Manager Chemistry/Effluent Manager Maintenance Manager Plant Technical Staff Plant Technical Staff Plant Technical Staff Plant Technical Staff Security Liaison Admin Support Staff Computer Engineer Attachment 8.3, EP Related Important Equipment- TSC

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 44 of 65 Alter~~te 1ricii~~ti6J!aric1*.

    • Eguipment
  • r**** .****.**..*...** ii .. iii<* .1:.* !\lor. Compensatory.;. <*

. Category ***. <Measure . .i

  • NA NRC Emergency B NA Contact IS Headset and phone (TSC) Notification System (ENS)

NA NRC Communications B NA Contact IS Inventoried / tested by (TSC) Telecom NRC Health Physics Network (HPN)

NRC Management Counterpart Link (MCL)

NRC Rad Safety Coordinator NRC Reactor Safety Counterpart Link (RSCL)

NRC Reactor Safety Ops Coordinator NRC Reactor Safety Specialist NRC Senior Resident Inspector NRC Protective Measures Counterpart Link (PMCL)

Attachment 8.3, EP Related Important Equipment- TSC

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 45 of 65

. . . INP010-001t': Alt~th~tJ'iriclicatJorl'and *. .

  • Equipment > l orcompensatcfry <**

Cateqory****** >. viMeasure)t***********

  • NA Radios B NA Contact IS Inventoried and tested by (TSC) I 2 13 I 4 I s I def I Telecom Base Station (x2)

There are 2 more base On-Site Channels stations for OSC (total of Area Wide channels 4)

NA Flat Screen Monitors B NA White Board (TSC) I 2 I 3 I 4 I s I def I END Attachment 8.3, EP Related Important Equipment - TSC

  • Nurnbei: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 46 of 65

?S1~:::::::::::::7c7::7:;:r~:-77-r':'J'""'-*-*----**-*-*r*,**cc,c='""'7"'===,

          • ,1NP610-001*>* **.*:Ait~fri~ti 1ridi~i1:iin**~~c1::

Egll1pmenf ..* f'.lorCompensatory :

Category, i . . . . Measure Computers B NA Contact IS Tested by EP, Maintained by IT HP Lead Repair Team Coordinator I Manager Electrical Craft Lead l&C Craft Lead Mechanical Lead NA Repair Team Coordinator B NA Contact IS (OSC) Headset I 2 I 3 I 4 Is I def I NA Telephones B NA Contact IS Inventoried and tested by (OSC) 1--------------1 11 I 2 I 3 I 4 1s I def 1 Telecom Manager HP Lead Repair Team Coordinator Team Tracker Electrical Craft Lead l&C Craft Lead Mechanical Craft Lead Craft Area Attachment 8.4, EP Related Important Equipment - OSC

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 47 of 65


,-,-,.,,--,-----,*******--,-..,,.-,,--,,l'"""c.~..,,.--,--,---,,,*='C--,-,

        • -*;..11~@~ie'rt1d12ati&ri aha*-****-

- Iorcompensatoty z

  • {Measure : * *- *-

NA Radios B NA Contact IS Inventoried and tested by (OSC) Telecom Base Station (x2)


1 There are 2 more base On-Site Channels stations for TSC (total of 4)

Area Wide channels Repair Team hand held (x6)

END Attachment 8.4, EP Related Important Equipment- OSC

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: NIA

Title:

EP Equipment Page: 48 of 65 EP RELATED IMPORTANT EQUIPMENT - EOF (BUILDING 34)

Equipment, **** Lff :>For Compensatory: /<

    • ca:tegory *. ***. \Measure ,* * *
  • 3 4 5 B NA Contact IS Tested by EP, Maintained by IT Asst EOF Manager DOH Dose Projection Energy Northwest Dose Projection EOF PIO Information Coordinator (x2)

INPO Network POIS Analyst Radiation Detection Engineer Telecom Manager NA Emergency Diesel A2 Confirm 115 kV available (EOF) Generator / 1 I 2 I 3 I 4 I 5 I def I Relocate to Alternate DG Load Test performed monthly by EOF. MWO#OOGBKO DG Switch Test performed quarterly by MWO#OOGBK2 Attachment 8.5, EP Related Important Equipment- EOF (Building 34)

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 49 of 65 L1NP610:oh1'. ******;;.!:~:iT 1*'iA1tJr~atJ l11dic~ti611 a~d

      • .**Equipment<
        • category < ....** **.***.* ilor*Compehsatory*****

....... Measure*

NA Fax B NA Contact IS Inventoried / tested by (EOF) f-----------**---- Telecom - EP CNF Dialogic Incoming Outgoing NA Health Physics Center B NA Kit at Alternate EOF Inventoried/tested by (EOF) Vehicle Field Team Air 1 I2 I 3 4 5 I def I Contact HP to provide Radiation Protection Sample Kit (x3) additional equipment quarterly- MWO 01050707 NA (EOF)

Health Physics Center Vehicle Field Team Field i2 I3 4 5 I def I B NA Kit at Alternate EOF Contact HP to provide Inventoried/tested by Radiation Protection Sample Kit (x3) additional equipment quarterly - MWO 01050707 NA Health Physics Center B NA Kit at Alternate EOF Inventoried/tested by (EOF) Vehicle Field Team I2 I 3 4 5 1 def 1 Contact HP to provide Radiation Protection Instrumentation Kit (x3) additional equipment quarterly- MWO 01050707 NA Health Physics Center B NA Kit at Alternate EOF Inventoried/tested by (EOF) Vehicle Field Team I2 I 3 1 4

1 5 I def I Contact HP to provide Radiation Protection Protective Clothing Kit (x3) additional equipment quarterly- MWO 01050707 NA Printers B NA Contact IS Tested by EP (EOF) I2 I 3 4 5 I def I HP Dose Projection INPO Network Coordinator Laser24 1----------------..-

Laser 147 NA Radiation Monitor, B NA Portable Monitor Tested / Calibrated by RP (EOF) Victoreen VAMP 11 1 2 1 3 1 4 1 5 1 def 1 Attachment 8.5, EP Related Important Equipment - EOF (Building 34)

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 1\/iinor Rev: NIA

Title:

EP Equipment Page: 50 of 65 1NP0*1otoo7********

. Eguipmen~ * * *

  • *. Category(*

NA Radios B NA Contact IS Inventoried and maintained (EOF) by Telecom EOF Radio inventory Field Team Console Field Team Monitoring Field Team Vehicle EN1 Field Team Vehicle EN2 Field Team Vehicle EN3 Portable Field Team (x6)

NOAA Weather WA State Field Team Console 1 - - - - - - - - - - - - -..--*-***

Security Area Wide Call sign KZl509 DOE Patrol Call sign Station 51 DOE Safety Console Call sign Station 51 Law Enforcement Call sign KOM785 Radio Network Attachment 8.5, EP Related Important Equipment - EOF (Building 34)

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 51 of 65

<. INP0:10:001 \UJ58.b i; > .*.*AitJtriat~i~~lcati6~ ~rid****

    • Equipment * \ .* **>I. . . . or*Compensatoiy,
    • Measure * *
  • L Category NA Telephones 3 4 5 B NA Contact IS Inventoried/ tested by (EOF) Telecom Admin Support Admin Support Assistant Manager Benton County Emergency Management BPA Representative FEMA Representative Decon Showers Dept. of Energy Representative Dept. of Health Field Team Coordinator Dept. of Health Protective Action Decision Group Liaison Dose Projection HP Dose Projection HP

~-----~----*-***-..----------L-----*-**----------~--------**-*-- ----L------*-*-*---*-*-*----~ *----------------

Attachment 8.5, EP Related Important Equipment - EOF (Building 34)

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment "

Page: 52 of 65 1NP0 :10::001tr t . .*Equipment . .

*>category ):

NA Engineering General 3 4 5 B NA Contact IS Inventoried/ tested by (EOF) Area Telecom Engineering Manager Engineering Support Field Team Coordinator Field Team Dispatcher Franklin County Emergency Management Health Physics Center INPO Network Coordinator 1----------*-----

lnstrument Calibration Lab Manager Manpower Scheduler NRC Deputy Site Team Director NRC Deputy Protective Measures Branch Leader


*--*L------------'---------'-------'-----------'-------------'

Attachment 8.5, EP Related Important Equipment - EOF (Building 34)

  • Number: 13.14.11
  • IUse Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 53 of 65

          • 1NP01olOoi > i***S!~*.* :tu* A1t~;~~t~1nt1itat,b~'iih<t***
  • .* Eqtiiprili:frit . . .*. * *J ofcorripensa.torv }
  • ca.tegorv .\***** *. Measure: >* *...

NA NRG Chronology B NA Contact IS Inventoried/ tested by 3 4 5 Telecom (EOF) Documentation Branch Leader NRG Dose Assessor NRC Dose Assessor Modem NRG ENS NRG Information Technology Specialist NRG Liaison Leader NRC Management Counterpart Link NRC Protective Measures Counterpart Link NRG Protective Measures Branch Leader NRG Chronology Documentation Communicator NRC Deputy Technical Assessment Branch Leader


***-*-*---*'---- * - - - - - _ _ _ _ _ _ _ _ _ . . L .- - -

.~-------***-------*-'---------------******--*----'

Attachment 8.5, EP Related Important Equipment - EOF (Building 34)

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 54 of 65 NA NRC Deputy B NA Contact IS Inventoried/ tested by 3 4 5 (EOF) Technical Assessment Telecom Branch Leader NRC Deputy Technical Assessment Branch Leader Modem NRC Reactor Safety Counterpart Link (RSCL)

NRC Response Branch Leader NRC Response Branch Leader Modem NRC Site Team Director NRC Technical Assessment Specialist NRC Technical Assessment Branch Leader Oregon State Liaison Oregon Radiological Dose Analyst POIS Analyst


*--- --- -*---*----------~ *-----..----------

Attachment 8.5, EP Related Important Equipment - EOF (Building 34)

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 1\/linor Rev: N/A

Title:

EP Equipment Page: 55 of 65

  • .************ep"Requir~d Mod~</ . : .1_N~d1oioo1******** .a.it:Jr~~t~ 1rit1ic:1t:ioil**ana***

. . I cir Compensatory

  • ....... .. Equipment>

>cat~goty,

. L Measure ............*.* * .* ***** * ***** ** **** ** *

  • NA Public Information B NA Contact IS Inventoried / tested by (EOF) Officer (PIO)

I2 I3 4 5 I def I Telecom Radiation Detections Systems Engineer Radiological Emergency Manager (REM)

Respiratory Testing Area Secretary Secretary Security Manager Site Support Manager State/County Liaison Technical Liaison Telecom Manager Washington Dept. of Agriculture Washington State Emergency Management Liaison Washington State DOH Liaison Attachment 8.5, EP Related Important Equipment - EOF (Building 34)

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 56 of 65 NA Vehicles B NA Acquire other ENW Maintained by CMS -

(EOF) vehicle EP verifies operable on a Field Team EN1 Contact Vehicle monthly basis Maintenance Field Team EN2 Contact WA to request Field Team EN3 DOH supplement NA Whelen Siren Console, Site j 2 j 3 j 4 j 5 B NA Activate from SCC Inventoried/Tested by (EOF) Evacuation Siren System 1 def 1 Telecom NA Wireless CRASH phone B NA Contact IS Inventoried/Tested by (EOF) system J 2 I3 1 4 1 5 1 def 1 Telecom and EP NA Overhead Projector (x2) B NA Contact IS (EOF) J 2 I3 4 1 5 1 def 1 NA Flat Screen Monitors B NA Contact IS (EOF) J 2 I3 1 4 1 5 1 def 1

--~--~-----*-**--*-*----*-*--*--**--***---~-*----~------

END Attachment 8.5, EP Related Important Equipment - EOF (Building 34)

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 57 of 65 EP RELATED IMPORTANT EQUIPMENT-ALTERNATE EOF INP610-001 i *.* Alt~rriati1ric1ih~tionand

  • . . Equipment/ \ .>J*o.r Compehsatorv.**

..*2 ~~~eqotv .* * ***.<:> ic:.Measure .t***.

NA Radios B NA (Alt. EOF)

B.5.b Radios Cellular phones


*--------l Field Team Base Cellular phones Station NA Fax B Inventoried/tested by (Alt. EOF) 1 2 I 3 I 4 I 5 I def 1 Telecommunications NA (Alt. EOF)

Health Physics Center Vehicle Field Team Air I 2 I 3 I 4 I 5 I def I B NA Kit at EOF Contact HP to provide Inventoried/tested by Radiation Protection Sampling Kit additional equipment quarterly - MWO 01050707 Health Physics Center Vehicle Field Team Field Sample Kit Health Physics Center Vehicle Field Team Instrumentation Kit NA Telephones B NA Contact IS Inventoried/ tested by (Alt. EOF) Telecom Assistant Manager Benton County Commissioner Dept. of Energy Field Team Coordinator Dept. of Energy Field Team Dispatcher

'--------**-*- .. ----------~--*-----* - - - - - * - * *-*-****-*-*****--**-- - * - - * - - * * - - - - - - - - - ' - - * - - - - - - - - - ~

Attachment 8.6, EP Related Important Equipment - Alternate EOF

  • Number: 13.14.11
  • j Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 58 of 65

'Nb~nN~rneibestfipti~~-*-***. '**)eiiR~qLii~edM6d~/'..; }/Y1NPd10~007.;;

. . ,,. < Equipment >

  • ** ** Category*** **

NA Dose Projectionist B NA Contact IS Inventoried / tested by (Alt. EOF) ----**-*---**-*-**---- Telecom Engineering Manager Manager Secretary Field Team Coordinator Field Team Dispatch Franklin County Commissioner Manpower Scheduler NRC/FEMA NRC Protective Measures Branch Lead NRG Reactor Safety Counterpart Link (RSCL) Communicator NRG Response Coordination Leader NRG Site Team Director

-- *------------***-------~-- - ~ - - - - - -

  • L----**------*--*--*-**------..-* -*--*--***--~----

Attachment 8.6, EP Related Important Equipment - Alternate EOF

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 59 of 65

, 1NP0*.10=001:> \**?**!:.!:!:!,#/(

  • i'J>lit;r11ate<i11ait\HJ11:arid:.***

>. Eguiprnerit c >IorCompensatofy:-: ><

  • >Measure * *** *
  • category:<******

NA NRC Technical B NA Contact IS Inventoried/ tested by (Alt. EOF) Assessment Branch Telecom Leader Oregon State Liaison REM Site Support Manager Security Manager Technical Liaison Telecom Manager Washington State Representative Washington Department of Health NA Headset B NA Contact IS Controller and Information (Alt. EOF) I 2 I 3 I 4 I 5 I def I Coordinator NA Computer, Dose Projection B NA Contact IS (Alt. EOF) 1 2 I 3 I 4 I 5 I def 1 END Attachment 8.6, EP Related Important Equipment -Alternate EOF

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: NIA

Title:

EP Equipment Page: 60 of 65

  • . **.**,tJi:,o,~01001* Ait~;riJi~*iriaiiiticin.~nd!:i
  • *Etjulpmenf i***. . Jor.C:omperisafory . ;<

... ;;;,*<*********,*,***i * '.,Category * .** ,.*.**************** ....

... .. Measure NA AM Tuner B NA FM Tuner (JIG) Internet NA Computers B NA Contact IS Tested by EP, (JIG) I 2 I 3 I 4 I s I def I Maintained by IT Alternate EOF/ENS AV Walkley Room Benton County PIO Franklin County PIO HP Spokesperson Internet News Monitor JIG Secretary News Release Editor NRG PIL Oregon PIO Phone Team (x8)

Rumor Control Technical Spokesperson)

Washington PIO)

Attachment 8.7, EP Related Important Equipment- JIC

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 61 of 65 0

7 ~

NA Copy Machine Eguiprhenf

  • .*.'****N*.*
  • . Category i:i.*.** **.-.1. . 0*1******.* **. *.*.*.>**.*,*..,**. ...***. 1.+j}"**********

B 0.*.**~.:o*******

>< 1 1 NA

  • .
  • Aitern~teihdic:';tirinaritt
  • * ***.* . . . . . ~i,*t/*)**************\***?

Contact Vendor Measure . .

  • Yr I> t *< . *. ***.* .* .* .* J
  • .. I or Compensatory * ***.* . !  :(~* .* ;. * *.* * .*. ***.
    • I,.**.*.**:**.*.*.-

> . . .** ...... . <f

.**.*. *.** *\::.~:*******\':*I******::*: 't >

(JIC)

NA DISH Network Receiver (x2) j 1 J 2 J 3 J 4 I 5 I def I B NA Contact Vendor (JIC)

NA Fax Inventoried/Tested by (JIC) Telecom

!-----*--*-------*- ---*---------*1 - - - - - - - - - - - - - - - * - - - !

Commercial (x2) B NA Contact IS 1----**----*-*-*--*----*-*---------- ---*--*--**--*------*** - - -------------f-----------*------

Dedicated {x2) B NA Contact IS 1 2 3 4 5 def I NA Flat panel displays (5) B NA Contact IS JIC, Phone Team Room (JIC) 1 2 3 4 5 def I and MPF Lobby NA FM Tuner B NA AM Tuner (JIC) 2 3 4 5 def I Internet NA Headset B NA Contact IS (JIC) ----------------1 2 3 4 5 def I Phone Team, (x8)

Spokesperson NA B NA Contact Vendor (JIC)

PIO Work Area Rumor Control Work Area NA Projection Booth AV B NA Contact IS Prox card and booth key (JIC) Equipment and DVR located in Support Manager's center desk drawer Attachment 8.7, EP Related Important Equipment- JIC

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 62 of 65 NA Telephones B NA Contact IS Inventoried/Tested by (JIC) I2 J 3 I 4 I s I def 1 Telecom AudioNisual Benton County Representative Distribution Team Supervisor DOE-RL Representative FEMA Representative Franklin County Representative HP Spokesperson Information Manager Manager Media Phone Team News Release Editor NRC Representative Oregon State Representative Public Phone Team Receptionist Attachment 8.7, EP Related Important Equipment- JIC

  • Number: 13.14.11
  • J Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 63 of 65

  • <,Npd:10Loo1,s .* **iti'1hcii~~1:i6Winct r

....................... ,.... *( Equipment ' Ior Compensatory*. . . **.

          • <*** category******** < Measure .

NA Spokesperson B NA Contact IS Inventoried/Tested by (JIG) Telecom Support Manager Technical Spokesperson Washington State Representative EMO Washington Department of Agriculture Washington Department of Health NA Televisions, broadcast (x2) B NA White Board (JIG) J 2 1 3 1 4 1 5 J def 1 NA Video B NA Contact IS (JIG) 1 2 1 3 1 4 1 5 1 def 1 JIG Projector Walkley Room Projector END Attachment 8.7, EP Related Important Equipment- JIC

  • Number: 13.14.11
  • I Use Category: REFERENCE Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 64 of 65 UNPLANNED LOSS OF EQUIPMENT Generate appropriate Unplanned deficiency tracking maintenance or loss documents and of function prioritize to restore function YES (Cat A) Implement YES Evaluate reportability compensatory requirements measure(s)

NO (Cat B) NO Review with mgmt. and determine actions Identify redundant or backup indication or method Track OOS equipment L - - - - - - - . i and return to service date Communicate need for Reclassify equipment heightened as Cat A. Reprioritize work a=rdingly. management awareness and deficiency tracking Notify ERO as necessary 14----------------...J

  • A function requires more time to Perform work as necessary perform or cannot be performed.

END Attachment 8.8, Unplanned Loss of Equipment

I Use Category: REFERENCE Number: 13.14.11 Major Rev: 012 Minor Rev: N/A

Title:

EP Equipment Page: 65 of 65 PLANNED LOSS OF EQUIPMENT Evaluate maintenance

~ - - - - activity or planned loss * - - - - - - - - ~

of function NO YES (Cat A) YES YES Is the compensatory Evaluate reportability measure available? requirements NO NO Review with mgmt. and (Cat B) determine actions Implement compensatory NO measure(s) prior to --------'

removal from service

  • YES

' - - - - - - - . - Notify ERO as necessary . - - - - - - - ~

Perform work as scheduled

  • A function requires more time to perfom, or cannot be perfom1ed.

END

  • Attachment 8.9, Planned Loss of Equipment