Energy Northwest, Emergency Preparedness Procedure 13.10.17, Revision 006, TSC Ventilation Radiation Monitor System Operations
ML23041A215
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/15/2022
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
13.10.17, Rev 006
Download: ML23041A215 (1)


Text

DISTRIBUTION - VOLUME 13 - EMERGENCY PREPAREDNESS PROCEDURES Page 3 of 3 Distribution Date: 12/15/22 Filed By: - - - - - - - - - - - - - - - Prepared by: Maria M.

Procedure Number Revision Procedure Number Revision Procedure Number Revision 13.10.17 006 TO: ENERGY NORTHWEST EXTERNAL CONTROLLED COPY PROCEDURE HOLDERS The following documents have been revised and are to be inserted into your controlled copy manual and the superseded revisions removed and destroyed. No receipt acknowledgement is required for the listed document(s).

Should you have questions on this distribution please contact Alan Page, Records and Information Lead at (509)377-8595 or atpage@energy-northwest.com.

I EXTERNAL DISTRIBUTION I Coov# Location Procedures 26 ReQion IV - US Nuclear Regulatory Commission All 52 State of Washington, Military Department All 55 Federal Emergency Management Agency (FEMA) All 57 Benton County - Department of Emergency Management All 87 Document Control Desk - NRC All 142 Hanford EOC/SMT All 164 Oregon State Department of Energy All 223 Franklin County EmerQency Management All 224 Washington State Department of Health - Office of Radiation Protection All

& PPM 13.1.1 and is printed in color, single sided, on 11" x 17" paper, folded, 3-hole punched, stapled on top and distributed by Document Control. All ERO Positional-Specific Binder procedures are stapled.

% Contact Security - All Security Procedures go to the sec for signature NOTE: Distribution of the PPM 13.1.1 wall flow charts is controlled by PPM 13.1.1A and distribution is performed by EP. Updated 02/03/2022

IVerify Revision lnforma~ion Prior To Use j ~=~:Is :

  • Number: 13.10.17

Title:

TSC Ventilation Radiation Monitor System Operations IUse Category: REFERENCE Major Rev: 006 Minor Rev: N/A Page: 1 of 12 PCN#:

PLANT PROCEDURES MANUAL N/A Effective Date:

Illllll lllll llll llllll lllll llll 1111111111111111111 13.10.17 12/15/22

  • Number: 13.10.17 t-----------------------'----------------1 Use Category: REFERENCE

Title:

TSC Ventilation Radiation Monitor System Operations DESCRIPTION OF CHANGES Major Rev: 006 Minor Rev: N/A Page: 2 of 12 Justification (required for major revision)

This is a major revision to remove reference to a chemistry calculation number that has changed. In lieu of referencing the specific chemistry calculation, a reference to the Instrument Master Data Sheet (IDMS) is more appropriate as the setpoint is directly controlled by the IDMS.

Page(s) Description (including summary, reason, initiating document, if applicable) 4 Removed reference to Chemistry calculation CH-98-002 and replaced with reference to IDMS for each instrument. AR-CR 437296 9 Removed reference to CH-98-002 and replaced with reference to TSC-RIS-1A,

-1B, and -1C IMDS

  • Number: 13.10.17

Title:

TSC Ventilation Radiation Monitor System Operations I Use Category: REFERENCE


'-----------------1 TABLE OF CONTENTS Major Rev: 006 Minor Rev: N/A Page: 3 of 12 Page 1.0 PURPOSE ............................................................................................................................... 4 2.0 DISCUSSION ........................................................................................................................... 4 3.0 RESPONSIBILITIES ................................................................................................................ 4 4.0 PRECAUTIONS AND LIMITATIONS ........................................................................................ 4 5.0 PROCEDURE .......................................................................................................................... 5 5.1 To Start Up the System ............................................................................................................ 5 5.2 To Shutdown the System ......................................................................................................... 7

6.0 REFERENCES

........................................................................................................................ 9 7.0 DOCUMENTATION ................................................................................................................. 9 8.0 ATTACHMENTS ...................................................................................................................... 9 8.1 TSC-CP-RAD/1 ...................................................................................................................... 10 8.2 E-PP-TSC1 ............................................................................................................................ 11

  • 8.3 TSC-RR-1 .............................................................................................................................. 12

\

  • Number: 13.10.17 1.0 PURPOSE I Use Category: REFERENCE

'--------------1

Title:

TSC Ventilation Radiation Monitor System Operations Major Rev: 006 Minor Rev: N/A Page: 4 of 12 This procedure provides instructions for operating the Technical Support Center (TSC)

Ventilation System Radiation Monitoring System TSC-CP-RAD/1.

2.0 DISCUSSION The TSC Ventilation System_Radiation Monitoring System continuously monitors and provides alarms for elevated airborne contamination levels in the TSC during an emergency.

TSC-RIS-1A is the TSC Airborne Particulate Radiation Monitor, TSC-RIS-1 Bis the TSC Airborne Radiation Monitor for Iodine and TSC-RIS-1C is the TSC Airborne Radiation Monitor for Noble gas.

The Instrument Master Data Sheets (IMDS) provide the setpoint information for TSC-RIS-1A,

-1 B and -1 C. The setpoint value is selected to allow operating margin between the IMDS limit and actual setpoint. The value in the IMDS is based on the requirement for posting areas above 0.3 Derived Airborne Concentration (DAC) as an airborne radiation area. This will provide High and Hi-Hi alarm set points equivalent to 0.3 DAC and 1.0 DAC, respectively, for a condition which affects TSC habitability .

  • 3.0 4.0 RESPONSIBILITIES '

The OSC Health Physics Technician assigned to perform TSC Habitability functions is responsible for performing'tasks controlled by this procedure.

PRECAUTIONS AND LIMITATIONS 4.1 TSC-CP-RAD/1 audible alarm is loud. Hearing PPE should be worn while working at this panel.

4.2 During Start-up and Operation of the TSC-CP-RAD/1 unit, the "FAIL" alarm may actuate (e.g.,

low flow, low counts, high voltage etc.).

, 4.3 The photomultiplier tubes are light sensitive and can easily be damaged from normal light intensities with high voltage to the detector. Do not remove the shield plug/filter housings potentially exposing the detector' assemblies to light.

4.4 Air Handling Unit fan motors can start and stop at any time. Be aware of rotating equipment located behind equipment guards and shrouds.

4.5 During initial start-up phase, the RIS LOW COUNTS indicating lamps may illuminate for up to 30 minutes due to low down scale indication .

  • Number: 13.10.17

Title:

TSC Ventilation Radiation Monitor System Operations 5.0 PROCEDURE IUse Category: REFERENCE Major Rev: 006 Minor Rev: N/A Page: 5 of 12 NOTE: Attachments 8.1, 8.2, and 8.3 provide pictures of panels with locations of switches called out.

5.1 To Start Up the System 5.1.1 . PROCEED to. TSC-CP-RAD/1 TSC Radiation Monitoring System Equipment Rack, located in the TSC Mechanical Equipment Room. See Attachment 8.1.

5.1.2

  • ENSURE TSC-RIS-1A, 18, and 1C "POWER" and "HIGH VOLTAGE" are OFF (pushbuttons not depressed) and indicator lamps of each are not illuminated.

5.1.3 ENSURE that the iodine charcoal cartridge and particulate filter are in place and in satisfactory condition per the following substeps:

a. OPEN the lower front panel to access the front of the detector housing.

NOTE: A small radioactive "keep alive" source is located inside the sample holder assembly, under the cartridge. Use care not to dislodge the source when removing and replacing charcoal filter cartridges.

b. REMOVE the IODINE shield plug/filter holder assembly AND CHECK that the charcoal cartridge is in place and in good condition. Replace if necessary.
c. REPLACE the IODINE shield plug/filter holder assembly.
d. CLOSE the lower front panel to access.
e. PROCEED to the back of TSC-CP-RAD/1 cabinet.
f. OPEN the back panel door to access the back of the detector housing.
g. REMOVE the PARTICULATE shield plug/filter holder assembly AND CHECK that the particulate filter is in place and in good condition. Replace if necessary.
h. REPLACE the PARTICULATE shield plug/filter holder assembly.
i. CLOSE the back panel door.

5.1.4 PROCEED to power panel PP-TSC1, located on the wall behind TSC-CP-RAD/1.

See Attachment 8.2.

5.1.5 OPEN the panel door on PP-TSC1 .

  • Number: 13.10.17 j Use Category: REFERENCE

Title:

TSC Ventilation Radiation Monitor System Operations CAUTION Major Rev: 006 Minor Rev: N/A Page: 6 of 12 System Startup may cause audible alarm and "fail" light(s) to come in (and then eventually clear). Hearing PPE should be worn while working at this panel due to the audible alarm potential.

5.1.6 ENSURE that'PP-TSC1 Breaker 11 is ON.

5.1.7 CLOSE panel door on PP-TSC1.

5.1.8 RETURN to TSC Radiation Monitoring System Equipment Rack TSC-CP-RAD/1.

5.1.9 ENSURE the Sample Pump is operating as per the following substeps:

NOTE: TSC-RMS-FN/21 rotates to the left (CCW) to the RUN position; STOP position is to the right (CW). This is reverse operating from most switches.

a. IF TSC-FN-21 is not already running (Green STOP lamp illuminated),

THEN PLACE TSC-RMS-FN/21 switch in the RUN position NOTE: It takes 30-40 seconds to see proper flow indication for TSC-FN-21.

b. ENSURE the Red RUN lamp is illuminated.

5.1.10 Startup TSC-RIS-1A, 1B, and 1C as follows:

a. DEPRESS the "OFF-PWR" pushbutton (bottom switch) on each RIS and ensure that each red Power LED is illuminated.
b. DEPRESS the "OFF-HV" pushbutton (second switch up from the bottom) on each RIS and ensure that each red High Voltage LED is illuminated.
c. MARK down the start time. - - - - - -

5.1.11 OPEN the soft key access cover located on front door of the recorder below TSC-RR-1 LCD Display. See Attachment 8.3.

5.1.12 PRESS the "Start" soft key on TSC-RR-1 and verify the green LED (record) light illuminates .

  • Number: 13.10.17 IUse Category: REFERENCE

Title:

TSC Ventilation Radiation Monitor System Operations 5.1.13 PLACE a start time stamp on recorder TSC-RR-1 as follows:

Major Rev: 006 Minor Rev: N/A Page: 7 of 12

a. PRESS FUNC (display the FUNC key menu),
b. PRESS the Message soft key.

C. PRESS the 1-10 soft key.

d. PRESS the 4 soft key, START TSC RAD MONITOR SYSTEM, to mark the graph on the recorder.
e. CLOSE the soft key access cover.

5.1.14 WAIT approximately 30 minutes afterTSC-RIS-1A, 1B, and 1C started to conduct response check of the RIS's. {6.1}

5.1.15 Perform a response check of each channel of TSC-RIS-1 A, 1B, and 1C as follows:

a. DEPRESS the "NOR-CS" push button and hold down until the appropriate meter reaches steady reading, or alarm sounds .
  • 5.2 NOTE: The following Steps are to be performed upon the termination of a declared emergency or EP drill unless directed otherwise by the RPM.

To Shutdown the System CAUTION Powering down, turning off the High Voltage, or Low Flow for the RIS units may cause the alarm to actuate. Hearing PPE should be worn while working at this panel.

NOTE: TSC-RMS-FN/21 rotates to the left (CCW) to the RUN position; STOP position is to the right (CW). This is reverse operating from most switches.

5.2.1 PLACE TSC-RMS-FN/21, fan switch in the STOP position. The LOW FLOW light will illuminate, and audible alarm will actuate (actuation may be delayed 20-30 seconds) .

Number: 13.10.17 I Use Category: REFERENCE

_ _ _ _ _ _ _ _ _ _.,____ _ _ _ _ _ _ _ _-------1 Major Rev: 006 Minor Rev: N/A

Title:

TSC Ventilation Radiation Monitor System Operations Page: 8 of 12 5.2.2 PLACE a stop time stamp on recorder TSC-RR-1 as follows:

a. If closed, OPEN the soft key access cover. See Attachment 8.3.
b. PRESS FUNC (display the FUNC key menu),
c. PRESS the Message Soft key,
d. PRESS the the 1-10 soft key, NOTE: To get the 5 soft key, you must use the fifth soft key, (to the right), to display the 5-8 soft keys.
e. PRESS the 5 soft key, STOP TSC RAD MONITOR SYSTEM, to mark the graph on the recorder.

5.2.3 STOP the recorder TSC-RR-1 as follows:

a. PRESS the "stop" soft key .
  • NOTE: Yes/ No option should be default highlighted to Yes.
b. When the Y/N window comes up on screen, with yes highlighted, PRESS Enter AND VERIFY the red LED (stop record) illuminates.
c. CLOSE the soft key access cover.

5.2.4 PRESS to release the "OFF-HV pushbutton (second switch up from the bottom) on each RIS and ensure that each red High Voltage LED is no longer illuminated.

5.2.5 PRESS to release the "OFF-PWR" pushbutton (bottom switch) on each RIS and ensure that each red Power LED is no longer illuminated.

5.2.6 CHECK the Iodine Cartridge and Filter Paper to determine need for replacement by repeating sections in step 5.1.3.

5.2.7 OPEN panel door on PP-TSC1.

5.2.8 ENSURE that PP-TSC1 Breaker 11 is OFF 5.2.9 CLOSE panel door on PP-TSC1 .

  • Number: 13.10.17 IUse Category: REFERENCE

Title:

TSC Ventilation Radiation Mo11itor System Operations

6.0 REFERENCES

Major Rev: 006 Minor Rev: N/A Page: 9 of 12 6.1 CR 00211042 TSC Ventilation Procedure PPM 13.10.17 needs to be updated 6.2 PPM 13.10.4, Radiation Protection Manager Duties 6.3 PPM 13.10.9, Operations Support Center Manager and Staff Duties 6.4 SOP-HVAC/TSC-OPS, Technical Support Center HVAC System Operation 6.5 Radiation Protection Manager Checklist, Form# 26514 6.6 OSC HP Technician Checklist, Form# 26526

  • 6.7 TSC-RIS-1A, -1B and -1C IMDS, respectively 7 .0 DOCUMENTATION Actions controlled by this procedure are documented in accordance with ERO Position Specific Checklist which outline document generation and retention .
  • 8.0 8.1 8.2 ATTACHMENTS TSC-CP-RAD/1 E-PP-TSC1 8.3 TSC-RR-1
  • Number: 13.10.17 I Use Category: REFERENCE

Title:

TSC Ventilation Radiation Monitor System Operations TSC-CP-RAD/1 Major Rev: 006 Minor Rev: N/A Page: 10 of 12 ALARM ACK (Alarm Acknowledge)

- - - 3RIS's

  • Particulate
  • Noble Gas TSC-RMS-FN/21
  • TSC-RR-1 Noble Gas Particulate Iodine
  • END Attachment 8.1, TSC-CP-RAD/1
  • Number: 13.10.17 I Use Category: REFERENCE

Title:

TSC Ventilation Radiation Monitor System Operations Major Rev: 006 Minor Rev: N/A Page: 11 of 12 Breaker 11

  • END Attachment 8.2, E-PP-TSC1
  • Number: 13.10.17 IUse Category: REFERENCE

Title:

TSC Ventilation Radiation Monitor System Operations TSC-RR-1 Major Rev: 006 Minor Rev: N/A Page: 12 of 12 Open here Key Number displays here To access key numbers 5-8, 9-12.

END Attachment 8.3, TSC-RR-1