DISTRIBUTION -VOLU ME 13-EM ERGE NCY PREPAREDNESS PROCEDURES Distribution Date: 03/12/2020 Filed By: Page 3 of 3

- - - - - - - - - - - - - - - Prepared by: CASSANDRA Procedure Number Revision Procedure Number 13.11.12 Revision Procedure Number Revision 032 TO: ENERGY NORTHWEST EXTERNAL CONT ROLL ED COPY PROCEDURE HOLDERS The following documents have been revised and are to be inserte d into your controlled copy manual and the superseded revisions destroyed. No receipt acknowledgement is required for the listed removed and document(s).

  • Should you have questions on this distribution please contac t Kim Saenz, Records and Information Supervisor at (509)3 KDSaenz@energy-northwest.com. 77-2492 or I EXTERNAL DISTRIBUTION Copy # Location I 26 Region IV - US Nuclear Regulatory Commission Procedures 28 Region IV - US Nuclear Regulatory Commission All 52 State of Washington, Military Department All 55 Federal Emergency Management Agency (FEMA) All 57 Benton County - Department of Emergency Management All

.; .- .. ..ffl __ -- - .- All 142

.OocumentC~oofroJ De~J<-:...~NRC-~~ =

Hanford EOC/SMT

--~-~*--,_*== ~=-~:- :::*-~- _**r-.:*:.- =~--~---=. *- - - -* ..- --:---:---

. --~*

. *- . -~=-..:.*-.

-.. ... -a-* ~ . *- <* *. *AIL~

.... **, .~ -

-- ----]r

- *~ - : ~

164 Oregon State Department of Energy All 223 Franklin County Emergency Management All 224 Washington State Department of Health - Office of Radiation Protec All tion All

& PPM 13.1.1 is printed in color, single sided, on 11" x 17" paper, folded, 3-hold punched, stapled on top and distributed by Document Control.

% Contact Security - All Security Procedures go to the sec for signature NOTE: Distribution of the PPM 13.1.1 wall flow charts is control led by PPM 13.1.1A and distribution is performed by EP.

Updated 02/12/2020

Number: 13.11.12 I Use Category: REFERENCE Major Rev:032 Minor Rev: N/A

Title:

EOF ENGINEERING MANAGER AND STAFF DUTIES Page: 1 of 7 PCN#:

PLANT PROCEDURES MANUAL N/A Effective Date:

IIIIIII IIIII IIII IIIIII IIIII IIII IIIIII IIIII IIII IIII 13.11.12 03/12/20

Number: 13.11.12 I Use Category: REFERENCE Major Rev:032 Minor Rev: N/A

Title:

EOF ENGINEERING MANAGER AND STAFF DUTIES Page: 2 of 7 DESCRIPTION OF CHANGES

.f1.1~tif1cation°,(f~q~ir~d fdrrn.ajcir,re;i~~io~l i.

_-*.** - . ' -- * .*. ,_ .,, .c .-. =-* ',,. ' -_ . .

Removed references to INPO Network Coordinator, this position is no longer manned at CGS .

.P~ge(s)

- ".c* * ** \S, 5 Deleted old section 3.5 INPO Network Coordinator Added "Prepare and provide event information to INPO" to Section 3.5 Deleted old section 4.4 "INPO Network Coordinator" 6 Section 4.4, deleted "Computer System" and added "EOF" to POIS Analyst Checklist Deleted old step 5.3.4 "INPO Network Coordinator Checklist, Form 26545" I

Number: 13.11.12 I Use Category: REFERENCE Major Rev:032 Minor Rev: N/A

Title:

EOF ENGINEERING MANAGER AND STAFF DUTIES Page: 3 of 7 TABLE OF CONTENTS 1.0 PURPOSE ............................................................................................................................... 4 2.0 DISCUSSION .......................................*.................................................................................... 4 3.0 RESPONSIBILITIES ................................................................................................................ 4 3.1 All ERO Members .................................................................................................................... 4 3.2 EOF Engineering Manager ....................................................................................................... 4 3.3 State I County Technical Liaison .............................................................................................. 4 3.4 Energy Northwest Representatives to State / County EOCs .................................................... 5 3.5 EOF POIS Analyst. ................................................................................................................... 5 3.6 Radiation Detection Systems Engineer .................................................................................... 5 4.0 PROCEDURE .......................................................................................................................... 5 4.1 EOF Engineering Manager ....................................................................................................... 5 4.2 State I County Technical Liaison .............................................................................................. 5 4.3 Energy Northwest Representatives to State / County EOCs .................................................... 5 4.4 EOF POIS Analyst. ...........................................................................................*........................ 5 4.5 Radiation Detection Systems Engineer .................................................................................... 6

  • 5.0 5.1 5.2 5.3

5.4 REFERENCES

........................................................................................................................ 6 Regulatory/ Licensing Documents ........................................................................................... 6 Procedures .............................................................................................................................. 6 Forms ....................................................................................................................................... 6 Correspondence I Other ........................................................................................................... 6 6.0 DOCUMENTATION ................................................................................................................. 7 7.0 ATTACHMENTS ...................................................................................................................... 7

Number: 13.11.12 \ Use Category: REFERENCE Major Rev:032 Minor Rev: N/A

Title:

EOF ENGINEERING MANAGER AND STAFF DUTIES Page: 4 of 7 1.0 PURPOSE This procedure provides instructions and guidance for activities of the EOF Engineering Manager and staff during an emergency. {R-5.1.1}

2.0 DISCUSSION None 3.0 RESPONSIBILITIES 3.1 All ERO Members 3.1.1 Perform position turnover for protracted events 3.1.2 Respond as directed when notified of a declared event 3.1.3 Maintain personal event logs and records in support of the after action report 3.1.4 Restore area and materials upon event termination 3.1.5 Apply fundamental ERO knowledge in the performance of your ERO duties 3.1.6 Properly use ERO procedures and checklists in the performance of your ERO duties

  • 3.1.7 Acquire & maintain qualification in your assigned ERO position 3.1.8 Apply human performance error reduction techniques in the performance*,otyour ERO duties 3.2 EOF Engineering Manager 3.2.1 Manage the technical assessment and monitoring group in the EOF 3.2.2 Perform accident assessment in support of event determination and mitigation actions 3.2.3 Coordinate outside engineering support 3.2.4 Provide input for facility briefs and updates 3.3 State I County Technical Liaison 3.3.1 Monitor plant conditions and event response activities 3.3.2 Provide information updates to and addresses questions and support requests from
  • the EOC representatives

Number: 13.11.12 \ Use Category: REFERENCE Major Rev:032 Minor Rev: N/A

Title:

EOF ENGINEERING MANAGER AND STAFF DUTIES Page: 5 of 7 3.4 Energy Northwest Representatives to State / County EOCs 3.4.1 Provide technical support and information to state and county EOCs 3.4.2 Communicate state and county actions and decisions to the EOF 3.5 EOF POIS Analyst 3.5.1 Activate EROS 3.5.2 Display and monitor the POIS data.

3.5.3 Prepare and provide event information to INPO 3.6

  • Radiation Detection Systems Engineer 3.6.1 Display and monitor the radiation monitoring system status for input used in dose assessment and in-plant radiological conditions 3.6.2 Assist the Radiation Emergency Manager (REM) in briefing outside responders to .:-t*

the EOF on radiological conditions 4.0 PROCEDURE 4.1 EOF Engineering Manager Perform appropriate actions using guidance in form 26538, EOF Engineering Manager:

Checklist, upon declaration of an emergency.

4.2 State I County Techn.ical Liaison Perform appropriate actions using guidance in form 26541, State/ County Technical Liaison Checklist, upon declaration of an emergency.

4.3 Energy Northwest Representatives to State / County EOCs Perform appropriate actions using guidance in form 26551, Energy Northwest Representatives to State I County EOCs Checklist, upon declaration of an emergency.

4.4 EOF POIS Analyst Perform appropriate actions using guidance in form 26540, EOF POIS Analyst Checklist, upon declaration of an emergency .

Number: 13.11.12 j Use Category: REFERENCE Major Rev:032 Minor Rev: N/A

Title:

EOF ENGINEERING MANAGER AND STAFF DUTIES Page: 6 of 7 4.5 Radiation Detection Systems Engineer Perform appropriate actions using guidance in form 26539, Radiation Detection Systems Engineer Checklist, upon declaration of an emergency.

5.0 REFERENCES

5.1 Regulatory / Licensing Documents 5.1.1 EP-01, Emergency Plan 5.1.2 Commitment, 10CFR50, Appendix E (VI), Emergency Response Data System (EROS) 5.1.3 Commitment, 10CFR50. 72, Immediate Notification Requirements for Operating Power Reactors 5.2 Procedures 5.2.1 PPM 13.2.2, Determining Protective Action Recommendations 5.2.2 PPM 13.13.2, Emergency Event Termination and Recovery Operations 5.2.3 PPM 13.13.4, After Action Reporting 5.3 Forms 5.3.1 EOF Engineering Manager Checklist, Form 26538 5.3.2 State I County Technical Checklist, Form 26541 5.3.3 Energy Northwest Representative to State/ County EOCs Checklist, Form 26551 5.3.4 EOF POIS Analyst Checklist, Form 26540 5.3.5 Radiation Detection Systems Engineer Checklist, Form 26539 5.3.6 Emergency Response Log, Form 23895 5.4 Correspondence / Other 5.4.1 OER SIL324R6, BWR Emergency Support Program 5.4.2 Work Release Order C-0875 5.4.3 Plant Data Information System (POIS) Users Manual

  • 5.4.4 Tech Memo 2117, Core Thermal or Reactor Engineer

Number: 13.11.12 I Use Category: REFERENCE Major Rev:032 Minor Rev: N/A

Title:

EOF ENGINEERING MANAGER AND STAFF DUTIES Page: 7 of 7 6.0 DOCUMENTATION All logs, forms and records completed as the result of implementing this procedure during an actual declared event shall be retained as permanent plant records. Transmit documents to the Permanent Plant File under DIC 2304.2.

A sub-set of documents generated during drills shall be maintained in the Emergency Preparedness Department files, as necessary, to support completion of drill/exercise commitments.

7.0 ATTACHMENTS None