Forwards Original & Rev 1 to Qcs Units 1 & 2 Colr.Original Rept Was Not Submitted Due to Administrative Oversight. Rev 2 to EMF-96-177 & Proprietary Rev 1 to EMF-96-180(P), Encl.Rev 1 to EMF-96-180(P) Withheld
ML20198R119
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 11/04/1997
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19313D060 List:
References
SVP-97-248, NUDOCS 9711130159
Download: ML20198R119 (2)


Text

w - ;

n,mn onwotih ranon on.quny Quan Otra Generating Mation amo sh Aunne sons ,

' Girdou,IL(,12 42 $3740 hl3&)U 4 2211 ,

SVP 97-248 November 4,1997 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Subject:

Quad Cities Nuclear Power Station Units 1 and 2 Q2Cl$ Core Operating Limits Report, Revision 1 NRC Docket Numbers 50-254 and 50-264 On September 27,1997 Quad Cities Unit 2 was shutdown for a mid-cycle replacement of a fuel assembly which had a single failed fuel pin. Pursuant to Technical Specification 6.9.A.6.c., Attachment A, Revision 1 of the Quad Cities Unit 2 Cycle 15 Core Operating

' Limits Report is enclosed. This revbion does not change any of the existing core analysis.

In Febmary,1997, Quad Cities Unit 2 was shutdown for refueling. Per our Technical Specification the Core Operating Limits Reports for Quad Cities Unit 2 Cycl 615 should have been submitted upon issuance of the repon. Due to an administrative oversight, the original Core Operating Limits Report was not submitted. Please find enclosed the original report, Attachment B.

APol'/

l 4

< w ,

y,

}

~

h

,m n , ,m 0.

PDR- ADOCK 05000254 ~

l MRR1\MIIMm P POR  !

A Unkom conqun3 b_

USNRC SVP-97-248 -2 November 4,1997

):

" If you have any questions concerning this letter, please contact Mr. Charles Peterson, Regulatory Affairs Manager, at (309) 654-2241, extension 3609.

Res ,

trull

  • r r

t '

L

' LL,W. Pearce 106((L

- Site Vice President Quad Cities Station

. Attact. ment A, Q2C15 Core Operating Limits Report, Revision 1 Attachment B, Q2C15 Core Operating Limits Report i

cc with attachments; A. B. Beach, Regional Administrator, Region III i R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities Office of Nuclear Facility Safety, IDNS i M. E. Wagner, Licensing, Comed cc without attachments:

W. D. Leech, MidAmerican Energy Company-D. C. Tubbs, MidAmerican Energy Company F. A. Spangenberg, Regulatory Affairs Manager, Dresden INPO Records Center