RBG-29067, Updates 871218 Response to Insp Rept 50-458/87-27.QA Surveillance OS-87-12-51 Performed to Satisfy Commitment to Ensure That Appropriate Procedures Identifed & Controlled for Approval,In Accordance W/Tech Specs 6.5.2.1 & 6.8.1

From kanterella
Jump to navigation Jump to search
Updates 871218 Response to Insp Rept 50-458/87-27.QA Surveillance OS-87-12-51 Performed to Satisfy Commitment to Ensure That Appropriate Procedures Identifed & Controlled for Approval,In Accordance W/Tech Specs 6.5.2.1 & 6.8.1
ML20205D883
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/19/1988
From: Deddens J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RBG-29067, NUDOCS 8810270235
Download: ML20205D883 (2)


Text

.

/ +

GULF STA TES r.w.m m UTILITIES r m.a ec e CODTPANY o mimma meu en a?e A M A C%' t G4 618. e Ms4 346 6e M

. October 19, 1988 RBG- 29067 File Nos. G9.5, G15.4.1 U. S. Nuclear Regulatory Commission  ;

Document Control Desk 1 Washington, DC 20555 Gentlemen:

RIVER BEND STATION - UNIT 1  ;

REFER T0: REGION IV '

DOCKET NO. 50-458/ REPORT 87-27 l

This letter is an update to Gulf States Utilities Company's (GSU) response to l NRC Inspection Report 50-458/87-27 dated December 18, 1987. The following l supplements the response to Notice of Violation 8727-01, "Failure to Obtain Required Procedure Approval."

In the December 18, 1987 letter, under the heading "Corrective Steps Which Will Be Taken to Avoid Further Violations", GSU stated that a review will be  ;

performed by our Quality Assurance (QA) organization to ensure that the j appropriate procedures are identified and controlled for approval in l accordance with Technical Specifications section 6.5.2.1 and 6.8.1. QA Surveillance 0S-87-12-51 was performed to satisfy this commitment and documented on a Surveillance Report dated January 8, 1988. During the course of the surveillance additional procedures were identified with similar approvals. All these inappropriately approved procedures have been reviewed and signed by the Assistant Plant Manager in compliance with Technical Specification 6.5.2.1. This additional corrective action was completed by January 31, 1988. ,

i This completes GSU's response to this item.

Sincerely, w

l

' 'd. C. Deddens i Senior Vice President

,f/ rguv River Bend Nuclear Group

@ JCD/ /f,JK/JWC/ch wh3 (P 88" Attachment

~8 l

bo cc: U. S. Nuclear Regulatory Comission  !

m Region IV ,

R8 611 Ryan Plaza Drive, Suite 1000 I

, g N

Arlington, TX 76011 l h NRC Resident Inspector I

@@a P.O. Box 1051 / A, ' 1 St. Francisville, LA 70775 't l

< 1, .

. ~

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION STATE OF LOUISIANA )

PARISH OF WEST FELICIANA )

Docket No. 50-458 In the Matter of )

GULF STATES UTILITIES COMPANY )

(River Bend Station - Unit 1)

AFFIDAVIT J. C. Deddens, being duly sworn, Ecates that he is a Senior Vice President of Gulf States Utilities Company; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information and belief.

~

J. d'.~Deddens Subscribed and sworn to before me, a Notary Public in and for the State and Parish above named, this /9bIU' day of 00dC IAt A , 19'5h . My Commission expires with Life.

_RAAd[_4 , k'l(LAOd Claudia F. Hurst Notary Public in and for West Feliciana Parish, Louinlana