From: Booker J
GULF STATES UTILITIES CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20138E701 List:
References
RBG-22482, NUDOCS 8512130531
Download: ML20138E711 (3)


Text

- - --

_7

,3 1 r

~, ,

c .g ..,w. .. ,

y

k <

,a } ; ).

.s_ b -

t GULF STATES UTIL1 TIES , COMPANY

,; , / .-

RIVER BENO STATION ' POST OFFICE BOX 220 St. FR ANCISVILLE, LOUISsANA 70775 AREA CCOE 504 635-6094 346 8651 i

\

v October 30, 1985

, RBG- 22482 File Nos. G9.5, G15.4.1 Mr.JRobert'D. Martin, Regional-Administrator U.S. Nuclear _ Regulatory Commission gggg7[y Region IV  ; ,'

- ' ' = ,

611 Ryan Plaza Drive, Suite 1000 ;s l Arlington, Texas .76011. j( h 9-l @ l p  ! ,

Dear' Mr. Martin:

t < -

< River' Bend Statir;. - Unit 1 ,

y

. Refer to:- ' Region IV f <

j Docket No.'50-458/ Report 85-51 .

e w ,

g

-This 'lette,r is.'in- response to the Notice of Violation and

' Deviation. contained. in.'NRC I&E Inspection- Report .No.

50-458/85-51. The inspection Lwas performed. by Messrs. D. D. i

. Chamberlain, W. R. Bennett, W.1M. McNeill, J. E. . Bess, H. F.

.Bundy, and C. C. Harbuck during the period June.16 through August

15,.1985, of : activities authorized . by NRC Construction Permit' CPPR-145 for River Bend Station' Unit'No. 1.
q. ).

v -Gulf . States. Utilities Company's (GSU)' response to, the . Notice of' Violation 51-01, " Failure _.to Follow an Admini,strative Procedure" 'and 1 Notice. of-Deviation 85-51-02 is provided in the enclosed attachment. This completes GSU's response to the Notice ~

of Violation and. Deviation.

Sincerely,

- . b- j .

^

J. E. Booker ,

' 8512130531 BNhPDR 9 PDR ADOCK O 58 Manager-Engineering,

!G .- Nuclear Fuels & Licensing River Bend Nuclear Group ct& .

~

.JEB/TCC/ E /amg Attachment t \

gcf.b d

\

A q<; >

f A

.x.y

.. .:. e g- .s

' # Y

,1;

.. 9

. ATTACHMENT l-October 30, 1985 RBG-22482 Response to Notice /of Violation ~

Reference' Notica 'of, Violation - E. H. Johnson letter to W. J. Cahill dated September- 30,'1985.

Refer.to Docket No. 50-458/85-49 Reason For Violation-Contrary _to -Administrative Procedure ADM-003, " Development,

. Control ?and Use of' Procedures," Rev. 6, fuel. transfer. operations were being conducted without the Temporary Change Notice (TCN) in use- stamped "TCN : SHIFT SUPERVI3OR-APPROVED COPY" in~ red ink as required. Furthermore, the TCN was not followed- exactly as written.

Corrective Steps Taken and ResultscAchieved Fuel transfer. ' operations were immediately halted and the procedural deficiencies were corrected.

CorrectiveMSteps Which Will Be Taken to Avoid'Further Violations

A-Memorandum was issued to' each- individual'
in the Operations Group of River Bend Station re-emphasizing the. requirement for.

procedural. compliance.

Date When Full Compliance Was Achieved-Full' compliance was accomplished:on July 16, 1985, the date of nthefoccurrence.

(

4

)

e

.1

. ._. _ _ _ - . . _ . _. ,_ . _ __ _ . . . _ . _ _ _ . _ _ _ m.

7_

e. f.~%* 4 o e 1

.t October 30, 1985 RBG-22482 ATTACHMENT 2 q_ .

Response to Notice of Deviation Reference Notice of Deviation ~E. H. Johnson letter to W. J. Cahill dated Septemberc30,.1985..

Refer to Docket No. 5'0-458/85-49.

Corrective Steps Taken and Results Achieved FSAR paragraph 14..2 12.1.44.1.b describes the test objective of

the. ECCS/LOOPEPreoperational Test as demonstrating, in part,.the

! ability of the RHR, LPCS and HPCS systems to realign and inject rated -flow to..the' vessel-within the prescribed period of time.

1This paragraph-was understood by GSU to not require the RHR system to.' recover 'from secondary . modes of operation, such.as-

.te sting . : LThisLinterpretation'is' based on GE design specification

'22A3845, Paragraph 4.2.5.3.1.which states:

...The. design basis. is~ that the RHR system shall not be

required to recover from. secondary modes of. operation, such
as testing, withinithe specified LPCI-injection time,.-because the' interval of.' time _ the RHR system remains in these

, secondary =gmodes is so short that- the 'effect on overall reliability is-insignificant."

ItlisDGSU's~positionithat preoperational testLprocedure- 1-PT-210

-" Integrated. .ECCS and -LOOP" did not deviate from the intent of

FSAR paragraph. 14.2.12.1.44.1.b.

Becauseithe-potential exists for more than one-interpretation of FSAR ' paragraph 14.2.12.1.44.1.b, . licensing change notice (LCN) number-14.2-1 has-been submitted .to revise this- paragraph .to.

reed:

"To demonstrate the ability of the RHR,'LPCS and HPCS" systems to realign, excluding realignment from secondary modes _ such P -as testing, and inject, rated flow to'the vessel........."

L f LThis change meets the intent offGE design specification 22A3845, E -

Paragraph 4.2.5.3.1 as stated-above.

GSUl considers this to be a'one time occurrence. All requirements

.of FSAR Chapter - 14 . have been ' met.

L ~

Date When Full Compliance Was Achieved I LCN 14.2-1 Rev. 11was: approved by GSU on October 18, 1985.

i l