PNO-IV-89-021:on 890324,stop-work Order Issued to Contractor (S&W).Contract Mechanics Were to Conduct Planned Pipe Cut on Portion of RHR Sys Train a Test Return Line to Suppression Pool.Rhr B Inadvertently Cut.On 890327,order to Be Lifted
ML20247F552
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/24/1989
From: Constable G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNO-IV-89-021, PNO-IV-89-21, NUDOCS 8904030478
Download: ML20247F552 (1)


_ = _ _ _

March 24, 1989

.P'RELkMiNARYNOTIFICATIONOF'EVENTORUNUSUALOCCURRENCE--PN0-IV-89-21 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public. interest significance. The information is as initially received without verification'or evaluation, and is basically all that is known by the Region IV staff on this.date.

FACILITY: Gulf States Utilities Licensee Emergency Classification:

River Bend Station Notification of Unusual Event Docket 50-458 Alert

, Site Area Emergency General Emergency X Not Applicable

SUBJECT:

STOP-WORK ORDER ISSUED TO CONTRACTOR DURING REFUELING OUTAGE The licensee issued a stop-work order on March 24, 1989, at'approximately 9 a.m.

to their Stone & Webster contractor who is providing staff augmentation work for the onooing outage. Contract mechanics were to conduct a planned pipe cut on a portion of the residual heat removal (RHR) system Train A test return line to the suppression pool. Because of inadequate verification, the pipe cut.took place on RHR B. The plant is currently utilizing RHR B for shutdown cooling; however, because of the location of the work, this function was not affected. RHR is not required due to the plant's shutdown condition and having greater than 23 feet of water above the vessel flange.

The licensee informed the NRC at 10:30 a.m. on March 27, 1989, that the stop-work order was lifted after additional quality control inspections were specified to assure adequate control of Stone & Webster work.

Neither the licensee nor the NRC plans to issue a press release.

The state of Louisiana will be informed.

Region IV received notification of this occurrence by telephone from SRI at 2 p.m., March 24, 1989. Region IV has informed E00, JRR, and PA.

This information has been confirmed with a licensee representative.

CONTACT: G. L. Constable, 728-8151 DISTRIBUTION:

0WFN NMBB NL MAIL: DCS(Orig.IE34)

Gii6. Zech SECY NM55 AEDIf RTS D0T (Transp. Only)

Comm. Roberts CA NRR ARM Comm. Carr 0GC OIA OGC FAX: (5520: 3/27/89 @ 12:20p.m.

Comm. Rogers GPA 01 THF0 Regions & HQ)

Comm. Curtiss PA SLITP H-St PDR ACRS ED0 0E FDR- NSAC RRI NRC Ops Ctr 1 Licensee (Reactor) p RIV:C:DRP/C D:DRP Af GLConstable;df LJCallan RDMartin 3/27/89 3/27/89 3/27/89 -

(

g40g7e890324 PNO-IV-89-021 PDC

_ _ _____