PM-82-868, Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept, Per 10CFR50,App J,Section VB Requirements

From kanterella
Jump to navigation Jump to search
Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept, Per 10CFR50,App J,Section VB Requirements
ML20065B052
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/01/1982
From: Nix H
GEORGIA POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20065B054 List:
References
PM-82-868, NUDOCS 8209140232
Download: ML20065B052 (1)


Text

l q

Georgis Pow:r Company Post Offica Box 439 Bralry, Georgl3 31513 Telephone 912 367-7781 912 537-9444 Georgia Power Edwin 1. Hatch Nucles< Plant September 1, 1982 PM-82-868 To idb PLANT E. I. HATCH Unit 2, Reactot Containment Building Integrated Leak Rate Test Mr. Harold R. Denton Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Transmitted herewith is the E. I. Hatch Plant, Unit 2, Final Report of the Reactor Containment Building Integrated Leak Rate Test completed in May, 1982. The report is written in accordance with 10CFR50, Appendix J, Section VB requirements and includes the results and an evaluation of the Local Leakage Rate Testing.

/

_d H. C. Nix Plant Manager WBK/hh i xc: J. P. O'Reilly J. T. Beckham, Jr.

J. R. Jordan T. V. Greene C. T. Jones H. L. Sumner i Document Control: h58 i

i

[ o17 l

i I

i s

I i

8209140232 820901 PDR ADOCK 05000366

\ P PDR l- -