PLA-2409, Monthly Operating Repts for Jan 1985

From kanterella
(Redirected from PLA-2409)
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1985
ML20112A599
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/31/1985
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2409, NUDOCS 8503180384
Download: ML20112A599 (11)


Text

__

f AVERAGE DAILY UNIT POWER LEVEL D

  • ct) w 3 -

DOCKET NO. 50-387 L.

6 UNIT one DATE 02/07/85 f+hggg gi COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-3759 MONTH .Tanuarv, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 938 37 920 2 1035 18 913 3 1018 39 779 _

4 1015 20 903 5 896 21 896 6 1015 889 22 7 990 23 877 8 986 372 24 9 979 0 25 _

10 071 26 59 11 959 27 630 12 9.50 28 871 13 946 29 881 14 937 30 869 15 933 865 33 16 928 INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole meg 2 watt.

(9/77) 8503180384 850131 d

{DR ADOCK 05000387 6 PDR V* h \

\\

gANN4 v Wr gp m

WO 7 E

kN* WJ OPERATING DATA REPORT DOCKET NO. 50-387

$ DATE 02/07/85 7 COMPLETED BY L.A. Kuczynski 0 .#fC Sif TELEPHONE (717)542-3759 OPERATING STATUS Unit 1 Notes

1. Unit Name: Susauehanna Steam Floceric gr,einn
2. Reporting Period: .Tn nn n rv . 1 gas End of core life power coast-
3. Licensed Thermal Power (MWt): 3293 down continued through the
4. Nameplate Rating (Gross MWe): 1152 m nth.
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1068
7. Maximum Dependable Capacity (Net MWe):

1032

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions,if Any: None This Month Yr..to.Date Cumulative
11. Hours in Reporting Period 744 744 14.497
12. Number Of Hours Reactor Was Critical 702.2 702.2 11.094.9
13. Reactor Reserve Shutdown Hours 41.8 _

41.8 513.2

14. Hours Generator On.Line 690.I 690.I 10,837
15. Unit Reserve Shutdown Hours 0 0 0 ,
16. Gross Thermal Energy Generated (MWH) 2.014.003 2,014,003 32.642.991 ,_
17. Gross Electrical Energy Generated (MWH) 657.200 657.200 10,647.730 ,__
18. Net Electrical Energy Generated (MWH) 629.281 629.281 10,253,79',
19. Unit Service Factor 92.8 92.8 /4.8
20. Unit Availability Factor 92.8 92.8 74.8
21. Unit Capacity Factor IUsing MDC Net) 82 82 68.5
22. Unit Capacity Factor (Using DER Net) 79.4 79.4 66.4
23. Unit Forced Outage Rate 7.2 7.2 13.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

Refueling Outage t February 9, 1985: 16 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION i 1

(0/77)

40 ANN 4 3)'hf?}'f*4

@l . . :. 5 Lh UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 }

f, p,u R UNIT NAME One f

4 by \S DATE 02/07/85 L.A. Kuczynski COMPLETED 8Y IC 5 REPORT MONTH Januarv. 1985 TELEPHONE (717)S42-3759 i

W.

_ E E No. Date

- 5 jh

= "EIi

)j$

Licensee Et Evt Cause & Corrective h $ Event (i Action to O

H f: 5 j di g Report # mU g Prevent Recurrence S

1 850124 F 53.9 H 3 '85-001-00 EG ELECON The unit scrammed when the generator experienced an over-voltage signal on the neutral phase as a result of ice in the auxiliary transformer isophase bus duct. Actions to pre-vent recurrence are under development.

1 2 3 4 Ff Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for l'icensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) Il-Other (Explain) - 9-Other

= . - ._ ___~

i .

i i

j UNIT 1 SUSQUEHANNA STEAM ELECTRIC STATION Docket No. 50-387 Date February 7, 1985 Completed by L.A. Kuczynski Telephone (717)542-3759 i

! Challenges to Main Steam Safety Relief Valves Following the scram of January 24, 1985, SRV's 'B' and 'E' actuated auto-matically. ' They reseated properly.

Rx Pressure (psig) Rx Pressure (psig)

-Open Closed at SRV Open at SRV Closed i

SRV 'B' i

10:34:41 10:34:51 1060 966 SRV 'E' 10:34:43 10:34:49 1048 982 Changes to the Offsite Dose Calculation Manual q None.

] Major Changes to Radioactive Waste Treatment Systems i

None.

i i t i

)

4 i

.i a

4

- . . - - . . - , . , . - - ,,, . . . . . . , ,_,,,c . , + , , _,r.-,,..y , -w -w---w-e, .- - - , , .---&-v -*y#9-e--

~

AVERAGE DAILY UNIT POWER LEVEL D )

r,1). ~..... 3 DOCKET NO. 50-388 L "' M J UNIT Two

( 0 DATE 02/07/85 hg gib COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-3759 l

MONTH Januarv, 1985 9

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 0 17 628 2 0 18 801 3 0 19 719 -

4 0 20 0 5 0 541 23 6 0 22 1018 7 0 952 23 _

8 73 y 803 9 200 25 830 ,

\

10 378 26 833 _

ll 477 p 885 12 788 936 28 13 979 240 29 14 1022 0 30 13 1054 31 0

16 1054 l

INSTRUCTIONS On this format, list the average daily unit power lar ! in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

N Y

s W%b w-.----

LA. 22F' ; OPERATING DATA REPORT O DOCKET NO. 50-388 bQ M DATE 02/07/85 COMPLETED BY L.A. Kuczynski RfC 5CT TELEPHONE (717)S42-3759 OPERATING STATUS Unit 2 Susquehanna Steam Electric Station b"

1. Unit Name:
2. Reporting Period: January, 1985 3293 '
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe):
  • To be determined.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions. If Any: None l This Month Yr..to.Date Cumulative ,
11. Hours In Reporting Period 744 744 5,100
12. Number Of Hours Reactor Was Critical 554.5 554.5 2.700.4
13. Reactor Reserve Shutdown Hours 94.8 94.8 589.8
14. Hours Generator On.Line 469.8 469.8 2,239.I
15. Unit Reserve Shutdown Hours 66.1 66.I 208.5
16. Gross Thermal Energy Generated (MWH) 1,193,659 1.191.6so 4,420,852 17 Gross Electrical Energy Generated (MWH) 382,160 382.160 1,371,200
18. Net Electrical Energy Generated (MWH) 364,906 364,906 1,296,932
19. Unit Service Factor NA NA NA
20. Unit Availability Factor NA NA NA *
21. Unit Capacity Factor IUsing MDC Net) NA NA NA
22. Unit Capacity Factor (Using DER Net) NA NA NA
23. Unit Forced Outage Rate NA NA NA
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: February 2, 1985.
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 05/09/84 05/08/84 INITIAL ELECTRICITY 06/28/84 07/03/84 COMMERCIAL OPER ATION 01/31/85 (9/77)

gANfW4 O

F G, I +7 -.

m1 E '

b DOCKE NO. 50-388

  • UNIT SHUTDOWNS AND POWER REDUCTIONS f[ UNIT NAME Two

$ Prat DATE 02/07/85

% COMPLETED BY L A Ene-vncki Nic SY REPORT MONTH Januarv, 1985 TELEPHONE (717)542-3759

- E E

, j3 3 } El Licensee [-t,  % Cause & Corrective Ni . Date i 3g s os5 Event y Action to I-f: 5 j ijj g Report er mO g{ Prevent Recurrence S

16 841027 S 176.1 B 4 NA NA NA Reactor scram as part of scheduled Startup Testing. Pre-cemmcreial out-age commenced.

1985 1 850108 F 3.3 A 9 NA CC VALV0P Turbine trip at low' power due to high moisture separator 'A' drain tank level. No reactor scram. Feedback arm on emergen'cy dump valve was replaced and turbine returned to service.

2 850117 S 0 B 5 NA NA NA Power Reduction for scheduled flot Functional Testing.

3 850119 F 28.7 B 3 85-003-00 IIA VALVEX Turbine trip on high vibration during surveillance test. Balance weights

. were installed on the turbine, and in the future, the surveillance t'est will be performed at a slightly lower reactor power, y 8$wn*E$uh5EN$t a"h oun0*sOftcS"w$s"c[$seE In*tSe 3 500 E swEtcSyar$'.' N oud8#sgitcN'was'$penE8E** " #

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & Ucense Examination from previous month F-Administrative 5 G-Operational Error (Explain) 5-Reduction Exhibit I - Same Source (9/77) Il-Other (Explain) 9-0ther

ggANN4 -

3 s@ .

y

f ) itM~)i n_ - , ~ gt 7
  • L DOCKET NO. 50-388 ,

UNIT SHUTDO'VNS AND POWER REDUCTIONS ho Pest UNIT NAME

$+ DATE 02/07/85 COMPLETED BY L.A. Kuczynski NIC Si REPORT MONTH Januarv, 1985 TELEPHONE (717)542-3759 n.

- E E

, .! E 3 ij j YIi Licensee [g geo Cause & Corrective No. Date g 38 js5 Event ~g gU'8 Action to H jE $ j;jjg Report a mO g Prevent Recurrence d

4 850129 S 66.1 B 3 NA NA NA Reactor scram as part of scheduled Startup testing.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)

E-Operator Training & License Examination from previous month F-Administrative 5 G-Operational Error (Explain) 6-Reduction Exhibit 1 - Same Source (9/77) 11-O:her (Explain) .

9-0ther

....-a

).

UNIT 2

] SUSQUEHANNA STEAM ELECTRIC STATION i Docket No. 50-388 Date February 7,1985

{ Completed by L.A. Kuczynski Telephone (717)542-3759 I

i Challenges to Main Steam Safety Relief Valves Safety relief valves 'B', 'C', and 'E' lif ted following the scram of January 4

19, 1985. All valves re-seated properly.

I ~

Rx Pressure (psig) Rx Pressure (psig)

Open Close at SRV Open at SRV Close r

SRV 'B' 16:55:15 16:55:27 1050 966 SRV 'C' 16:55:15 16:55:27 1050 966 l

SRV 'E' 16:55:15 16:55:27 1050 966 i

4 Safety relief valves 'B' and 'E' lifted following the scram of January

, 29, 1985. All valves re-seated properly.

i l SRV 'B' 05:54:11 05:54:21 1070 966 SRV 'E' i 05:54:11 05:54:21 1070 966

-l Changes to Main Steam Safety Relief Valves i

i None.

1 Major Changes to Radioactive Waste Treatment Systems i

! None.

I 4

4 I

r

__ _ __ _ . _ . . . . . . ~ _ - ~-- - - -

%, 3

. ~.-

PP&L Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101 + 215 / 770 5151 Bruce D. Kenyon Vice President-Nucleat Operations 215/770-7502 FEB 131585 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC. STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841. Docket Nos. 50-387/NPF-14 PLA-2409 50-388/NPF-22

Dear Mr. Beebe:

The January 1985 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, V)

MU h B. D. Keny Vice President-Nuclear Operations Attachment j

F Page 2 SSES PLA-2409 FEB 131985 ER 100450 File 841 Mr. M. R. Beebe cc: Dr. Thomas E. Murley INPO Records Center Regional Administrator-Region I Suite 1500 U.S. Nuclear Regulatory Commission 1100 Circle 75 Parkway 631 Park Avenue Atlanta, Georgia 30339 King of Prussia, PA 19406 Director Mr. Thomas E. Pollog Office of Inspection and Enforcement Department of Environmental U.S. Nuclear Regulatory Commission Resources Washington, D.C. 20555 Bureau of Radiation Protection Attn: Document Control Desk (12 copies) P.O. Box 2063 Harrisburg, PA 17120 Mr. R. H. Jacobs - NRC American Nuclear Insurers Ms. M. J. Campagnone - NRC The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 Attn: Librarian l

l l

,