Forwards Millstone Unit 2 Simulator Certification Submittal, Vols 1-4
ML20245K846
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/29/1989
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20245K850 List:
References
B13287, NUDOCS 8907050282
Download: ML20245K846 (2)


Text

w

.~

AST tlTILITIES cenerai Orfices . seiden street. Beriin. Connecticut L

l t TJ ' " , , 'O O"", "L"%~

NARTFORD. CONNECTICUT 06141-02 (203) ess-sooo June 29, 1989 Docket No. 50-336 B13287 Re: 10CFR55.45(b)

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Certification of Plant-Referenced Simulator Enclosed is the Northeast Nuclear Energy Company submittal for certifying the Millstone Unit No. 2 simulator as a plant-referenced simulator per 10CFR55.45(b). Enclosed is a completed, signed NRC Form 474 and four volumes to support this submittal.

The 'irst volume contains general information on the Millstone Unit No. 2 simulator. -The second volume contains the generic procedure governing certi-fication of the Millstone Unit No. 2 simulator. The third volume contains performance test results for the Millstone Unit No. 2 simulator. The fourth volume contains summaries of all certified malfunctions available on the Millstone Unit No. 2 simulator.

10CFR55.45(b)(5)(ii) requires that licensees " submit, every four years on the anniversary of the certification, a report to the Commission which identifies any uncorrected performance test failures." Also, Section (b)(5)(vi) requires "a. schedule for the conduct of approximately 25 percent of the performance tests per year for the subsequent four years." NNECO intends to comply with these requirements. See Volume 2, Procedure NSEM-4.07, " Master Testing Schedule," for our schedule and also for a description of the approximately 25 percent of performance tests to be done each year.

Please contact us if you have any questions.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l l

Y$

E.J.proczka / j SeniorVicePres[ident l Enclosures i l

cc: (Without Enclosures)

W. T. Russell, Region I Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit Hos.1, 2, and 3 P. Habighorst, Resident Inspector, Millstone Unit No. 2 ,

8907050282 890629 PDR- ADOCK 05000336 P PDC

Il /p/5 /

l ---

m_ __ _

e PRC pnan (74 . U.S. NUCLEAR REQULATORY coa 4Mi&SION i . (10 as7 Appre.ee av OMS l af" W' SIMULATION FACILITY CERTIFICATION W.b INSTRUCTIONS. This form is to be filed for initial certification, decertification (if required), and for any change to a simulation facility performance testmg plan ade af tr initial sabmittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal.

F ACILIT Y IDOCKtT NUMBER Millstone Unit 2 I g 336 DATE LICENSEE Northeast Nuclear Energy Company pg.g i= v e, con .i.n .. . ni. nc.o .mu , w m m erae. 'a .m. na.n,o.a. *.cuv re e a eu=, i,c.n

.,p no oc mn uoi on.

.. .,to.c.em , e.m m n.mm.n a A n o n.c..me.cm.on .i: .oo n.Nsu. cmo Aus a s. .no nesa.e.v u nor NAME tu other edents/scation/ AND LOCATION OF SIMULATION F ACILITY w on o n ..

o oac R.eaio.,,on.u.a i.is. .no

.-. a e.u,m.n%on u.

o . excep

. ,hnc m .c,n.n. o, io eraio is ons. seeM.o ume l...ermpage 70 Lelan F. Sillin, Jr. Nuclear Training Center. Waterford. CT 06385-0128 X l SIMULATION FACILITY PERFORMANCE TEST ABSTRACTS ATTACHED. tFor performance rests tonductedin the period endmp with rhe dere of this certificetson/

DESCR 6PTION OF PERFORMANCE TESTING COMPLETED IArtach eddernonet pagetsl es necessery. and odentify the orem orscroproon bemp conronved) \

l Refer to Millstone Unit 2 Simulator Certification Submittal I i

j l

i SIMULATION F ACILITY PERFORMANCE TESTING SCHEDULE ATT ACHED. IFor the conduct of appromirnere/y 25% of performance restsper year for the four year persod l>

7 l commencmg work the dare of thus certitucation.) i I

DESCRlPTION OF PE RF0RMANCE TESTING TO BE CONDUCTED IAtrach additoonalpegets) es necessary, and odentsfy the item descriproon being contmuod)

Refer to Millstone Unit 2 Simulator Certification Submittal i

J i

l PE RFORMANCE TESTING PLAN CHANGE. lfor ony modification to o performance restmg plan submorred on a previous certification) .

DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE LAttach addoruorantpagelsf as necessary, andidentify the item description bemo continued)

Initial submittal. not applicable. 4 4

l i

j R ECE RTiF ECAT CON (Descrour corr.ctive actions taken, arrach results or comptered performance restmg m accornance warh 10 CF R 9 65 45tbstbilv). }

lt Artach additiorw!pegels9 es nerenserY and idenrofy rhe item descrrprron boung contmved } l

/

l Initial submittal, not applicable. )

i i

j Any (gige statement Dr Omtssfon afi that OOcum.nt, including attachments, may be lubject to civil arid crimirlal lanC1:ons. I Ce,tsty under penalty of perjuf y that tf's information in that documtnt end attachm.nh 45 ttut and totr.Ct DATE SIGNATURE . AU HORIZE REPRESENTATIVE l TITLE Senior Vice-President I h g[ g In accordaned%pV10 CF R ll 5515. Cjo munications, tnis form shall be submitted to the N R C as follows:

SY MAIL ADDRESSED TO: Director,Offece of Nuclear Reactor Regulation BY DELIVERY IN PERSON U.S. Nuclear Regulatory Commission TO THE NRC OFFICE AT: 7920 Norfolk Avenue Washmgton,DC 20555 t3ethesda, MD