Forwards Justification for Alternative Schedule to Complete Items Requested in NRC Bulletin 88-011 Re Pressurizer Surge Line Thermal Stratification
ML20235X529
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/03/1989
From: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-011, IEB-88-11, WM-89-0075, WM-89-75, NUDOCS 8903130498
Download: ML20235X529 (4)


Text

f

-* W$LF CREEK NUCLEAR OPERATING CORPORATION {

d*

8*Neno* March 3,1989 cNef Executive Omcor WM 89-0075 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station F1-137 Washington, D. C. 20555 Subj ect : Docket No. 50-482: Alternative Schedule for Evaluation of Pressurizer Surge Line Thermal Stratification (NRC-Bulletin 88-11)

Centlemen:

The purpose of this letter is to transmit a justification for an alternative schedule to complete the items requested in NRC Bulletin 88-11, " Pressurizer Surge Line Thermal Stratification". Wolf Creek Nuclear Operating Corporation is currently participating in a program for partial resolution of this issue through the Westinghouse Owners Group (WOG). The attached j justification provides a description of the WOG program and an alternative schedule for completing the requirements of NRC Bulletin 88-11.

If you have any questions concerning this matter, please contact me or Mr. O. L. Maynard of my staf f.

Very truly yours, nj Bart D. Withers President and Chief Executive Officer BDW/j ad Attachment cc: B. L. Bartlett (NRC), w/a E. J. Holler (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a i ; o 1 t 3.04 t 5: i e 3 0 :-

RDOC f LGON ,

h FM

,. at ,

P.O. Box 411/ Burhngton, KS 66839 / Phone: (316) 364-8831 An Equal Opportundy Employer M'F/HC/ VET

~

Attachment to WM 89-0075 Page i of 3 3 ALTERNATIVE SCHEDULE FOR EVALUATION OF 6* PRESSURIZER SURGE LINE THERMAL STRATIFICATION Cn December 20, 1988, the NRC issued Bulletin No. 88-11, " Pressurizer Surge Line Thermal Stratification." It requests all addresses to establish and implement a program to confits pressurizer surge line integrity in view of the occurrence of thermal stratification, and requires them to inform the staf f of the actions taken to resolve this issue.

Pursuant to satisfying the requirements and schedules of Bulletin 88-11, Wolf Creek Nuclear Operating Corporation (WCNOC) is participating in a program for partial resolution of this issue through the Westinghouse Owners Group (WOG).

The program was approved at the October, 1988 WOG meeting and has the following objectives:

- Develop a generic justification for Continued Operation (JCO) to assure that plant safety is not compromised while the effects of thermal stratification are being determined.

- Collect and summarize relevant design, operational, analytical, and test data for as many WOG plants as possible. In addition, a representative sampling, of approximately ten plants, will be selected to perform a review of plant records and conduct interviews with operations personnel.

- Evaluate data and identify and prioritize significant parameters contributing to this issue. Categorize plants based on these parameters.

- Recommend additional monitoring to supplement the existing transient database required to bound all WOG plants.

- Estimate the effect of thermal stratification on fatigue life as a function of key parameters.

- Recommend short term and long term actions.

The WOG program is designed to benefit from the experience gained in the performance of several plant specific analyses on Westinghouse PWR surge lines. These detailed analyses included definition of revised thermal transients (including stratification) and evaluations of pipe stress, fatigue usage factor, thermal striping, fatigue crack growth, leak before-break, and support loads. The overall analytical approach used in all of these analyses has been consistent and has been reviewed, in detail, by the NRC staff. A significant amount of surge line thermal monitoring data has been obtained in support of these plant specific analyses. Additional surge line thermal monitoring and plant system data continues to be made available within the WOG, resulting in a steadily increasing database. A significant amount of progress has been accomplished toward meeting these objectives.

l Attachment to WM 89-0075 Page 2 of 3 To date, the WOG has completed approximately 80% of the effort of assembling

. plant specific design information on all domestic Westinghouse PWRs (55 units total.) This effort will establish the range of key design parameters and permit grouping of plants based on these parameters.

Based on the infor23 tion assembled to date, and the experience gained in plant specific analyses and monitoring programs, the WOG evaluation has resulted in the following observations regarding plant similarity and thermal stratification:

0

1. Thermal stratification (>100 F) has been measured on all surge lines for which monitoring has been performed and which have been reviewed by the WOG to date (7 plants). In addition, Wolf Creek Generating Station (WCGS) performed surge line monitoring during Refuel III. This data has been given to the WOG to include in their program.
2. The amount of stratification measured and its variation with time (cycling) varies. This variation has been conservatively enveloped and applicability demonstrated for plant specific analyses.

Additional monitoring data representing a wider range of surge line configurations may be needed in order to demonstrate the applicability of these thermal stratification transients to other Westinghouse units.

3. Significant factors which can influence the structural effects of stratification are:
a. Location and design of rigid supports and restraints
b. Pipe layout geometry and size
c. Type and location of piping components
4. Although the material and fabrication techniques for Westinghouse surge lines are reasonably consistent and of high quality, the design parameters listed in item 3 vary among Westinghouse PWRs.

This variation in design is primarily a result of plant specific routing requirements. This variability is currently being examined in order to assess the feasibility of a bounding analysis approach.

These observations developed through the on-going WOG program, indicate that the development of thermal stratification loadings and the evaluation of fatigue, considering these loadings, is a complex process. Therefore, in order to precisely evaluate stratification, additional time is needed.

While more time is needed to evaluate the stratification issue in detail, the NDE inspection history at Wolf Creek Generating Station (WCGS), as well as all other domestic Westinghouse designed PWR's, has not revealed any i

service induced degradation in the surge line piping that has been attributed to thermal stratification.

1 1

, e Attachment to WM 89-0075 Page 3 of 3 6

o In addition, all the plant specific analyses performed to date that have

, included the loadings due to stratification and striping have validated the

" leak-before break" concept and have substained a 40 year plant life. Thus, a prudent approach for providing a detailed evaluation of the effects of surge line stratification would be to follow the WOG program grouping evaluation recommendations and monitor as determined to be appropriate.

The WOG expects to complete a grouping evaluation, for the purpose of recommending a list of additional plants where thermal monitoring is needed, in Ma rch , 1989. The time required for this additional monitoring will be dependent on plant outage schedules.

To assure that the plant safety is not compromised within the requested period of schedule extension, a JC0 will be submitted to the staff. The JC0 which is currently being developed, will be submitted by WCNOC to the staff within ane year of receipt of NRC bulletin 88-11. The JC0 will utilize the information, experience, and monitoring data obtained through the WOG program, and will support the alternate schedule discussed herein.

WCNOC hereby requests an alternate schedule to that requested in NRC Bulletin 88-11. A schedule of two years from receipt of the Bulletin, is considered sufficient time to obtain the necessary additional monitoring data, define thermal transients, perform all required analyses and update the stress and fatigue analyses to ensure compliance with applicable code and regulatory requiremer.ts. This schedule, though different from that requested in action 1.b of Bulletin 88-11, is consistent with the requirement to update the stress and fatigue analyses within two years as stated in action 1.d of the Bulletin. As previously stated, the JC0 which is currently being developed will be submitted by WCNOC to the staff within one year of receipt of Bulletin.

At this time, WCNOC's request for an alternate schedule applies only to item 1.b of NRC Bulletin 88-11. WCNOC intends to comply with all other requirements of the Bulletin.