Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212A1631999-09-13013 September 1999 Forwards W Rept WCAP-15224, Analysis of Capsule Y from TVA Sequoyah Unit 1 Reactor Vessel Radiation Surveillance Program, Rev 0.Errata Sheet Containing Three Correction Pages to WCAP-15224 Also Encl ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210Q5011999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Sequoyah Nuclear Plant. Sample Registration Ltr Encl ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20211B9661999-07-26026 July 1999 Informs That Sequoyah Nuclear Plant Sewage Treatment Plant, NPDES 0026450 Outfall 112,is in Standby Status.Flow Has Been Diverted from Sys Since Jan 1998 ML20210B2521999-07-14014 July 1999 Confirms 990712 Telcon Between J Smith of Licensee Staff & M Shannon of NRC Re semi-annual Mgt Meeting Schedule for 990820 in Atlanta,Ga to Discuss Recent Sequoyah Nuclear Plant Performance ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 ML20209E4071999-06-30030 June 1999 Forwards Insp Repts 50-327/99-03 & 50-328/99-03 on 990328- 0531.Violations Being Treated as Noncited Violations ML20196J8261999-06-28028 June 1999 Forwards Safety Evaluation Authorizing Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements for Certain Inservice Inspections at Sequoyah Nuclear Plant,Units 1 & 2 ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195E9311999-05-28028 May 1999 Informs of Planned Insp Activities for Licensee to Have Opportunity to Prepare for Insps & Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20207A5721999-05-20020 May 1999 Forwards Correction to Previously Issued Amend 163 to License DPR-79 Re SR 4.1.1.1.1.d Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20209J0391999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept, Radiological Impact Assessment Rept & Rev 41 to ODCM, for Period of Jan-Dec 1998 ML20206C0841999-04-23023 April 1999 Forwards Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted ML20206C6541999-04-23023 April 1999 Forwards Response to NRC 990127 RAI Re GL 96-05 for Sequoyah Nuclear Plant,Units 1 & 2 ML20206B9591999-04-20020 April 1999 Responds to 990417 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in Unit 1 TS 3.1.2.2,3.1.2.4 & 3.5.2 & Documents 990417 Telephone Conversation When NRC Orally Issued NOED ML20205S5891999-04-17017 April 1999 Documents Request for Discretionary Enforcement for Unit 1 TS LCOs 3.1.2.2,3.1.2.4 & 3.5.2 to Support Completion of Repairs & Testing for 1B-B Centrifugal Charging Pump (CCP) ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212A1631999-09-13013 September 1999 Forwards W Rept WCAP-15224, Analysis of Capsule Y from TVA Sequoyah Unit 1 Reactor Vessel Radiation Surveillance Program, Rev 0.Errata Sheet Containing Three Correction Pages to WCAP-15224 Also Encl ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20209J0391999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept, Radiological Impact Assessment Rept & Rev 41 to ODCM, for Period of Jan-Dec 1998 ML20206C6541999-04-23023 April 1999 Forwards Response to NRC 990127 RAI Re GL 96-05 for Sequoyah Nuclear Plant,Units 1 & 2 ML20205S5891999-04-17017 April 1999 Documents Request for Discretionary Enforcement for Unit 1 TS LCOs 3.1.2.2,3.1.2.4 & 3.5.2 to Support Completion of Repairs & Testing for 1B-B Centrifugal Charging Pump (CCP) ML20205B1091999-03-19019 March 1999 Submits Response to NRC Questions Concerning Lead Test Assembly Matl History,Per Request ML20204H0161999-03-19019 March 1999 Resubmits Util 990302 Response to Violations Noted in Insp Repts 50-327/98-11 & 50-328/98-11.Corrective Actions:Lessons Learned from Event Have Been Provided to Operating Crews ML20204E8251999-03-0505 March 1999 Forwards Sequoyah Nuclear Plant,Four Yr Simulator Test Rept for Period Ending 990321, in Accordance with Requirements of 10CFR55.45 ML20207E6851999-03-0202 March 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/98-11 & 50-328/98-11.Corrective Actions:Lessons Learned from Event Have Been Provided to Operating Crews ML20207J1171999-01-29029 January 1999 Forwards Copy of Final Exercise Rept for Full Participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to Sequoyah NPP ML20202A7141999-01-20020 January 1999 Provides Request for Relief for Delaying Repair on Section of ASME Code Class 3 Piping within Essential Raw Cooling Water Sys 05000327/LER-1997-013-02, Forwards LER 97-013-02 Re Addl Conditions Identified During Performance of Corrective Actions.Details Added to Revs for Two Fuses,Not Included in Surveillance Program1999-01-11011 January 1999 Forwards LER 97-013-02 Re Addl Conditions Identified During Performance of Corrective Actions.Details Added to Revs for Two Fuses,Not Included in Surveillance Program ML20198S7141998-12-29029 December 1998 Forwards Cycle 10 Voltage-Based Repair Criteria 90-Day Rept, Per GL 95-05.Rept Is Submitted IAW License Condition 2.C.(9)(d) 05000327/LER-1998-004, Forwards LER 98-004-00,providing Details Concerning Inability to Complete Surveillance within Required Time Interval1998-12-21021 December 1998 Forwards LER 98-004-00,providing Details Concerning Inability to Complete Surveillance within Required Time Interval ML20198D5471998-12-14014 December 1998 Requests That License OP-20313-2 for Je Wright,Be Terminated IAW 10CFR50.74(a).Individual Retiring ML20197J5541998-12-10010 December 1998 Forwards Unit 1 Cycle 9 90-Day ISI Summary Rept IAW IWA-6220 & IWA-6230 of ASME Code,Section Xi.Request for Relief Will Be Submitted to NRC Timeframe to Support Second 10-year Insp Interval,Per 10CFR50.55a ML20196F9841998-11-25025 November 1998 Provides Changes to Calculated Peak Fuel Cladding Temp, Resulting from Recent Changes to Plant ECCS Evaluation Model ML20195H7891998-11-17017 November 1998 Requests NRC Review & Approval of Five ASME Code Relief Requests Identified in Snp Second ten-year ISI Interval for Units 1 & 2 ML20195E4991998-11-12012 November 1998 Forwards Rev 7 to Physical Security/Contingency Plan.Rev Adds Requirement That Security Personnel Will Assess Search Equipment Alarms & Add Definition of Major Maint.Rev Withheld (Ref 10CFR2.790(d)(1)) ML20195G5701998-11-10010 November 1998 Documents Util Basis for 981110 Telcon Request for Discretionary Enforcement for Plant TS 3.8.2.1,Action B,For 120-VAC Vital Instrument Power Board 1-IV.Licensee Determined That Inverter Failed Due to Component Failure 05000328/LER-1998-002, Forwards LER 98-002-00 Re Automatic Turbine & Reactor Trip, Resulting from Failure of Sudden Pressure Relay on B Phase Main Transformer1998-11-10010 November 1998 Forwards LER 98-002-00 Re Automatic Turbine & Reactor Trip, Resulting from Failure of Sudden Pressure Relay on B Phase Main Transformer ML20155J4031998-11-0505 November 1998 Provides Clarification of Topical Rept Associated with Insertion of Limited Number of Lead Test Assemblies Beginning with Unit 2 Operating Cycle 10 Core ML20154R9581998-10-21021 October 1998 Requests Approval of Encl Request for Relief ISI-3 from ASME Code Requirements Re Integrally Welded Attachments of Supports & Restraints for AFW Piping ML20155B1481998-10-21021 October 1998 Informs That as Result of Discussion of Issues Re Recent Events in Ice Condenser Industry,Ice Condenser Mini-Group (Icmg),Decided to Focus Efforts on Review & Potential Rev of Ice condenser-related TS in Order to Clarify Issues ML20154K1581998-10-13013 October 1998 Forwards Rept Re SG Tube Plugging Which Occurred During Unit 1 Cycle 9 Refueling Outage,Per TS 4.4.5.5.a.ISI of Unit 1 SG Was Completed on 980930 ML20154H6191998-10-0808 October 1998 Forwards Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 COLR, IAW TS 6.9.1.14.c 05000328/LER-1998-001, Forwards LER 98-001-00 Providing Details Re Automatic Turbine & Reactor Trip Due to Failure of Sudden Pressure Relay on B Phase Main Transformer1998-09-28028 September 1998 Forwards LER 98-001-00 Providing Details Re Automatic Turbine & Reactor Trip Due to Failure of Sudden Pressure Relay on B Phase Main Transformer 1999-09-27
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K6661990-09-17017 September 1990 Forwards Evaluation That Provides Details of Plug Cracks & Justification for Continued Operation Until 1993 ML20059H4031990-09-10010 September 1990 Discusses Plant Design Baseline & Verification Program Deficiency D.4.3-3 Noted in Insp Repts 50-327/86-27 & 50-328/86-27.Evaluation Concluded That pre-restart Walkdown Data,Loops 1 & 2 Yielded Adequate Design Input ML18033B5031990-08-31031 August 1990 Forwards Financial Info Required to Assure Retrospective Premiums,Per 10CFR140 & 771209 Ltr ML20059H1831990-08-31031 August 1990 Forwards Nonproprietary PFE-F26NP & Proprietary PFE-F26, Sequoyah Nuclear Plan Unit 1,Cycle 5 Restart Physics Test Summary, Re Testing Following Vantage 5H Fuel Assembly installation.PFE-F26 Withheld (Ref 10CFR2.790(b)(4)) ML20059E2881990-08-31031 August 1990 Forwards Addl Info Re Alternate Testing of Reactor Vessel Head & Internals Lifting Rigs,Per NUREG-0612.Based on Listed Hardships,Util Did Not Choose 150% Load Test Option ML20059E1851990-08-31031 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-327/90-22 & 50-328/90-22.Corrective Actions:Extensive Mgt Focus Being Applied to Improve Overtime Use Controls ML20028G8341990-08-28028 August 1990 Forwards Calculation SCG1S361, Foundation Investigation of ERCW Pumping Station Foundation Cells ML20063Q2471990-08-20020 August 1990 Submits Implementation Schedule for Cable Tray Support Program.Util Proposes Deferral of Portion of Remaining Activities Until After Current Unit 2 Cycle 4 Refueling Outage,Per 900817 Meeting.Tva Presentation Matl Encl ML20056B5181990-08-20020 August 1990 Responds to NRC Re Order Imposing Civil Monetary Penalty & Violations Noted in Insp Repts 50-327/90-01 & 50-328/90-01.Corrective Actions:Organizational Capabilities Reviewed.Payment of Civil Penalty Wired to NRC ML20063Q2461990-08-17017 August 1990 Forwards Cable Test Program Resolution Plan to Resolve Issues Re Pullbys,Jamming & Vertical Supported Cable & TVA- Identified Cable Damage.Tva Commits to Take Actions Prior to Startup to Verify Integrity of safety-related Cables ML20059A5121990-08-15015 August 1990 Provides Clarification of Implementation of Replacement Items Project at Plant for Previously Procured Warehouse Inventory.Util Committed to 100% Dedication of Commercial Grade,Qa,Level Ii,Previous Procurement Warehouse Spare ML20058M2321990-08-0707 August 1990 Forwards Rept of 900709 Fishkill,Per Requirements in App B, Environ Tech Spec,Subsections 4.1.1 & 5.4.2.Sudden Water Temp Increase Killed Approximately 150 Fish in Plant Diffuser Pond ML20058N2361990-08-0707 August 1990 Confirms That Requalification Program Evaluation Ref Matl Delivered to Rd Mcwhorter on 900801.Ref Matl Needed to Support NRC Preparation for Administering Licensed Operator Requalification Exams in Sept 1990 ML20058M0111990-07-27027 July 1990 Forwards Addl Info Re Plant Condition Adverse to Quality Rept Concerning Operability Determination.Probability of Cable Damage During Installation Low.No Programmatic Cable Installation Problems Exist ML20055J3531990-07-27027 July 1990 Forwards Revised Commitment to Resolve EOP Step Deviation Document Review Comments ML20058M4471990-07-27027 July 1990 Responds to Unresolved Items Which Remain Open from Insp Repts 50-327/90-18 & 50-328/90-18.TVA in Agreement W/Nrc on Scope of Work Required to Address Concerns W/Exception of Design Basis Accident & Zero Period Accelaration Effects ML20055J0771990-07-26026 July 1990 Requests Termination of Senior Reactor Operator License SOP-20830 for Jh Sullivan Due to Resignation from Util ML20055G6611990-07-17017 July 1990 Forwards Justification for Continued Operation for safety- Related Cables Installed at Plant,Per 900717 Telcon.No Operability Concern Exists at Plant & No Programmatic Problems Have Been Identified.Summary of Commitments Encl ML20058L7001990-07-16016 July 1990 Forwards Response to SALP Repts 50-327/90-09 & 50-328/90-09 for 890204 - 900305,including Corrective Actions & Improvements Being Implemented ML20055F6151990-07-13013 July 1990 Provides Addl Bases for Util 900320 Proposal to Discontinue Review to Identify Maint Direct Charge molded-case Circuit Breakers Procured Between Aug 1983 & Dec 1984,per NRC Bulletin 88-010.No Significant Assurance Would Be Expected ML20044B2211990-07-12012 July 1990 Forwards Addl Info Clarifying Certain Conclusions & Recommendation in SER Re First 10-yr Interval Inservice Insp Program ML20055D2531990-07-0202 July 1990 Provides Status of Q-list Development at Plant & Revises Completion Date for Effort.Implementation of Q-list Would Cause Unnecessary & Costly Delays in Replanning Maint,Mod, outage-related Activities & Associated Procedure Revs ML20043H9061990-06-21021 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementaion of Generic Safety Issues Resolved W/Imposition or Requirements or Corrective Actions. No Commitments Contained in Submittal ML20043H2281990-06-18018 June 1990 Informs of Issue Recently Identified During Startup of Facility from Cycle 4 Refueling Outage & How Issue Addressed to Support Continued Escalation to 100% Power,Per 900613 & 14 Telcons ML20043G4901990-06-14014 June 1990 Forwards Tabs for Apps a & B to Be Inserted Into Util Consolidated Nuclear Power Radiological Emergency Plan ML20043F9301990-06-13013 June 1990 Responds to NRC Re Violations Noted in Insp Repts 50-327/90-17 & 50-328/90-17.Corrective Action:Test Director & Supervisor Involved Given Appropriate Level of Disciplinary Action ML20043F9261990-06-13013 June 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High-Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S3502 Swing Check Valves or Valves of Similar Design ML20043H0361990-06-11011 June 1990 Forwards Supplemental Info Re Unresolved Item 88-12-04 Addressing Concern W/Double Differentiation Technique Used to Generate Containment Design Basis Accident Spectra,Per 900412 Request ML20043D9921990-06-0505 June 1990 Responds to NRC Re Violations Noted in Insp Repts 50-327/90-14 & 50-328/90-14.Corrective Actions:Util Reviewed Issue & Determined That Trains a & B Demonstrated Operable in Jan & Apr,Respectively of 1989 ML20043C0581990-05-29029 May 1990 Forwards Response to NRC 900426 Ltr Re Violations Noted in Insp Repts 50-327/90-15 & 50-328/90-15.Response Withheld (Ref 10CFR73.21) ML20043C2821990-05-29029 May 1990 Requests Relief from ASME Section XI Re Hydrostatic Pressure Test Requirements Involving RCS & Small Section of Connected ECCS Piping for Plant.Replacement & Testing of Check Valve 1-VLV-63-551 Presently Scheduled for Completion on 900530 ML20043B3051990-05-22022 May 1990 Forwards Detailed Scenario for 900711 Radiological Emergency Plan Exercise.W/O Encl ML20043B1201990-05-18018 May 1990 Forwards, Diesel Generator Voltage Response Improvement Rept. Combined Effect of Resetting Exciter Current Transformers to Achieve flat-compounding & Installing Electronic Load Sequence Timers Produced Acceptable Voltage ML20043A6101990-05-15015 May 1990 Forwards Rev 16 to Security Personnel Training & Qualification Plan.Rev Withheld (Ref 10CFR2.790) ML20043A2391990-05-15015 May 1990 Forwards Revised Tech Spec Pages to Support Tech Spec Change 89-27 Re Steam Generator Water Level Adverse Trip Setpoints for Reactor Trip Sys Instrumentation & Esfas. Encl Reflects Ref Leg Heatup Environ Allowance ML20043A0581990-05-11011 May 1990 Forwards Cycle 5 Redesign Peaking Factor Limit Rept for Facility.Unit Redesigned During Refueling Outage Due to Removal & Replacement of Several Fuel Assemblies Found to Contain Leaking Fuel Rods ML20043A0571990-05-10010 May 1990 Forwards List of Commitments to Support NRC Review of Eagle 21 Reactor Protection Sys Function Upgrade,Per 900510 Telcon ML20042G4651990-05-0909 May 1990 Provides Addl Info Re Plant Steam Generator Low Water Level Trip Time Delay & Function of P-8 Reactor Trip Interlock,Per 900430 Telcon.Trip Time Delay Does Not Utilize P-8 Interlock in Any Manner ML20042G4541990-05-0909 May 1990 Provides Notification of Steam Generator Tube Plugging During Unit 1 Cycle 4 Refueling Outage,Per Tech Specs 4.4.5.5.a.Rept of Results of Inservice Insp to Be Submitted by 910427.Summary of Tubes Plugged in Unit 1 Encl ML20042G9771990-05-0909 May 1990 Responds to NRC Re Violations Noted in Insp Repts 50-327/90-01 & 50-328/90-01 & Proposed Imposition of Civil Penalty.Corrective Actions:Rhr Pump 1B-B Handswitch in pull- to-lock Position to Ensure One Train of ECCS Operable ML20042G0441990-05-0808 May 1990 Forwards Nonproprietary WCAP-11896 & WCAP-8587,Suppl 1 & Proprietary WCAP-8687,Suppls 2-E69A & 2-E69B & WCAP-11733 Re Westinghouse Eagle 21 Process Protection Sys Components Equipment Qualification Test Rept.Proprietary Rept Withheld ML20042G1701990-05-0808 May 1990 Provides Addl Info Re Eagle 21 Upgrade to Plant Reactor Protection Sys,Per 900418-20 Audit Meeting.Partial Trip Output Board Design & Operation Proven by Noise,Fault,Surge & Radio Frequency Interference Testing Noted in WCAP-11733 ML20042G1431990-05-0808 May 1990 Forwards WCAP-12588, Sequoyah Eagle 21 Process Protection Sys Replacement Hardware Verification & Validation Final Rept. Info Submitted in Support of Tech Spec Change 89-27 ML20042G1001990-05-0808 May 1990 Forwards Proprietary WCAP 12504 & Nonproprietary WCAP 12548, Summary Rept Process Protection Sys Eagle 21 Upgrade,Rtd Bypass Elimination,New Steam Line Break Sys,Medical Signal Selector .... Proprietary Rept Withheld (Ref 10CFR2.790) ML20042G1231990-05-0707 May 1990 Forwards Detailed Discussion of Util Program & Methodology Used at Plant to Satisfy Intent of Reg Guide 1.97,Rev 2 Re Licensing Position on post-accident Monitoring ML20042F7741990-05-0404 May 1990 Informs of Completion of Eagle 21 Verification & Validation Activities Re Plant Process Protection Sys Upgrade.No Significant Disturbances Noted from NRC Completion Date of 900420 ML20042F1691990-05-0303 May 1990 Responds to NRC Bulletin 88-009, Thimble Tube Thinning in Westinghouse Electric Corporation Reactors. Wear Acceptance Criteria Established & Appropriate Corrective Actions Noted. Criteria & Corresponding Disposition Listed ML20042G1381990-04-26026 April 1990 Forwards Westinghouse to Util Providing Supplemental Info to Address Questions Raised by NRC Re Eagle-21 Process Protection Channels Required for Mode 5 Operation at Facilities ML20042E9641990-04-26026 April 1990 Forwards Rev 24 to Physical Security/Contingency Plan.Rev Withheld (Ref 10CFR73.21) ML20034B5971990-04-24024 April 1990 Requests NRC Approval to Consider Eagle 21 Sys Operable Prior to NRC Approval of Tech Spec Change 89-27 as Change Applies to Several Indication Only Instrument Channels Utilized in Mode 5 1990-09-17
[Table view] |
Text
-
-[
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place FEB 171987 10 CFR 50.62 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Office of Nuclear Reactor Regulation Washington, D.C.
20555 Attention:
Mr. B. J. Youngblood In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT - 10 CFR 50.62 - PLANT-SPECIFIC DETAILS In a letter dated October 31, 1986, from me to you, TVA committed to provide plant-specific details identified in the generic Safety Evaluation Report (SER) from the Westinghouse Owners Group (WOG) topical report, WCAP-10858, "AMSAC Generic Design Package," by February 15, 1987.
Enclosed are detailed responses to the 14 plant-specific questions and an interpretation of the Sequoyah design criteria in light of the SER.
WOG is to provide the basis for the generic C-20 setpoint.
If you have any questions concerning this matter, please call R.W. Meadors at (615) 870-6649.
Very truly yours, TENNESSEE VALLEY AUTHORITY R.
ridley, D rector Nuclear Safet and Licensing Enclosure cc: See page 2 h{
O 07022 PDR
}\\
An Equal Opportunity Employer
. U.S. Nuclear Regulatory Commission FEB 171987 cc (Enclosures):
U.S. Nuclear Regulatory Commission Region II Attn:
Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlante, Georgia 30323 Mr. J. J. Holonich Sequoyah Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Mr. G. G. Zech, Director TVA Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy. Tennessee 37319 l
l l
i l
l l
l
- ~.
ENCLOSURE PLANT SPECIFIC DETAILS SEQUOYAM NUCLEAR PLANT (SQN)
DIVERSITY - Identify degree of diversity from Reactor Protection System (RPS).
The requirements of the ATWS rulemaking are such that AMSAC equipment be i
diverse to a reasonable and practicable extent to minimize the potential for common cause failures. To achieve this diversity, the SQN AMSAC design requires that equipment be diverse from the existing RPS from sensor output s
to,1xat not including, the final actuation device i
This diversity is ensured in the SQN design in the following manner:
i o
Logic Technologies - The RPS utilizes solid-state logic while AMSAC U
utilizes relay logic.
o Manufacturers - The RPS is supplied by Westinghouse while the inputs used for AMSAC are derived from Bailey Co. relay racks.
o Sensors - The sensors for RPS and AMSAC are not the same and are separated physically.
l o
Location - The RPS cabinets and the Bailey relay racks are in separate i
locations.
l LOGIC POWER SUPPLIES - Identify independence from RPS power supplies.
The SQN AMSAC design requires power which is ultimately derived from the i
uninterruptable power supply (UPS) in order to provide high reliability for system function.
While it is acknowledged that one channel of the RPS is also t
ultimately tied back to the UPS, the use of fuse and breaker coordination effectively sectionalizes the distribution bus to prevent the loss of the board due to a single branch failure. Therefore, the necessary independence j
between the RPS and AMSAC is achieved and the SQN AMSAC design provides both j
high reliability and independence.
See FSAR figures 8.1.2-1 and 8.1.2-2 for the existing layout of the SQN UPS.
I The power supplies to the RPS logic cabinets are RPS channel I-120-V ac Vital i
i Power Board 1-I,. breaker 5; RPS channel II-120-V ac Vital Power Board 1-II, l
breaker 5; RPS channel III-120-V ac Vital Power Board 1-III, breaker 5; RPS l
channel IV-120-V'ac Vital Power Board 1-IV, breaker 5. The power supply for the AMSAC relay logic is nondivisional, Train A associated, power 120-V ac Vital Board 1-III, breaker 26.
The AMSAC test relay circuits are powered from
- Train A--120-V.ac Vital Power Board 1-I, breaker 27; Train B--120-V ac Vital Power Board 1-II, breaker 27; and Train S--120-V ac Vital Power Board 1-III, i
breaker 8 or 120-V ac Vital Power Board 1-IV, breaker 8.
Unit 2 power supplies are similar. The power supplies are battery backed and fed from 1
individual breakers.
All IE signal /AMSAC interfaces are separated by qualified relay and/or fuse isolation.
t i
i I
s
,w
+%%$k Y
_Y r
o
SAFETY-RELATED INTERFACE - Confirm that RPS continues to meet all applicable safety criteria.
The SQN AMSAC design requires (see design criteria) that implementation of the AMSAC shall be such that it will not degrade the RPS, auxiliary feedwater system, or other safety-related systems. This is understood to mean that the design basis for isolation, independence, wiring, and physical separation as set forth in the AMSAC design criteria shall be met such that the RPS (or other safety-related systems) performance will not be degraded in any way by the AMSAC implementation.
In order to comply with these design bases, the SQN AMSAC design employs the use of separate steam generator level instrument loops from the RPS.
The AMSAC control circuit and turbine impulse chamber pressure switch loops are non-1E and also have no interface with the RPS.
Other design objectives to this end are found under response to items 9 and 10.
QUI.LITY ASSURANCE - Provide information regarding compliance with Generic Letter 85-06.
Standard Practice SQA-172 has been prepared to address the quality assurance requirements for ATWS equipment that is not safety related. This standard practice was prepared to meet the requirements from Generic Letter 85-06 and NQAM Part I, Section 1.3, " Limited QA Program Requirements." Attachment 1 provides a copy of SQA-172. Compliance with SQA-172 will ensure compliance with Generic Letter 85-06.
MAINTRNANCE BYPASSES - Provide information of test bypass design including human factor evaluation of control room indication.
Maintenance bypasses for the component AMSAC controls are accomplished by placing the appropriate train of equipment into the testing mode by way of permanently-mounted hand switches clearly labeled for this purpose.
These test bypass switches are located in the auxiliary control room and auxiliary instrument control room of SQN. While in the testing (maintenance) mode, the main control room annunciation system indicates that the AMSAC is in testing. For the human factors evaluation of test / maintenance bypasses see attachment 2.
Testing can be performed in any mode of operation and is governed by paragraph 5.0 of the SQN detailed design criteria for AMSAC (SQN-DC-V-20.0, attachment 3).
OPERATING BYPASS - Provide information on arming circuit design, including human factor evaluation of control room indication.
The SQN AMSAC design utilizes a permissivo signal, designated as C-20 (see figure 1) to defeat the block of the AMSAC system (arm the AMSAC) as stated in the design criteria. This design requires that if two out of two turbine impulso chamber pressure bistables are actuated indicating that the plant is at or above 70 percent of full power then the AMSAC will be l
' gi e
44 Y
h f4 Q h Ska
I l.
automatically armed. Continuous indication that the AMSAC system is armed is provided in the control room when the C-20 permissive is actuated. The human factors evaluation of this indication is provided in attachment 2.
Additional features of this permissive signal, as required by design criteria, are that removal of the C-20 permissive signal shall be delayed by approximately 120 seconds, and the C-20 signal is isolated from the RPS by qualified Class 1E isolators.
MEANS FOR BYPASSING - Provide information on test bypass design.
The SQN AMSAC design incorporates permanently-mounted hand switches to accomplish control circuit bypass in order to test system components.
These hand switches are located in the auxiliary control room and in the auxiliary control instrument rooms. All testing and maintenance bypasses of the SQN AMSAC will be annunciated in the main control room. Human factors evaluation of these annunciations is contained in attachment 2 of this response.
(Also, see item 5).
MANUAL INITIATION - Discuss how a manual turbine trip and auxiliary feedwater (AFW) actuation are accomplished by the operator.
The turbine and AFW pumps can be manually actuated in the horseshoe of the main control room by the following hand switches:
EOUIpMENT HAND SWITCH LOCATION Main Turbino 1-HS-47-24 Panel M-2 Motor-Driven AFW Pump 1A 1-HS-3-118A Panel M-4 Motor-Driven AFW Pump 2A 1-HS-3-128A Panel M-4 Turbine-Driven AFW Pump 1-HS-46-56A Panel M-3 Note: After initiation of AFW the pumps will operate in the recirculation modo until the steam generator level is below 33 percent.
Based on discussion with operations personnel, the operator action required to manually trip the turbine and actuate AFW should take a maximum of 8-10 seconds. The manual hand switches for turbine trip and AFW actuation are approximately 10 feet apart.
ELECTRICAL INDEPENDENCE FROM RPS - Provide information on electrical independence from RPS.
Provido an analysis of isolators in accordance with Appendix A of the NRC SER.
(Similar to item 2.)
The SQN specific AMSAC design does not utilize RPS sensors nor RPS isolators.
Therefore, SER Appendix A is not applicable to SQN's design. See additional discussion of safety-related interface in item 3.
8-1r ' - e s
- s. v.muwsn
. 1 PHYSICAL SEPARATION FROM RPS - Provide information on physical separation l
from RPS.
The SQN AMSAC design requires that all field wiring associated with AMSAC l
shall be implemented in accordance with TVA detailed design criteria for
" Separation of Electrical Equipment and Wiring" (SQN-DC-V-12.2) such that separation criteria for safety-related systems are not violated. The SQN RPS cabinets are located in the auxiliary room on elevation 685'-0" in the control building, while the AMSAC control relays are located in the auxiliary control room and adjacent instrument rooms on elevation 734'-0" and outside the auxiliary feedpump turbine room on elevation 669'-0" in the auxiliary building.
In addition, AMSAC circuits and instruments are physically separate and diverse from RPS.
_ ENVIRONMENTAL QUALIFICATION - Provide necessary environmental qualification information.
As referenced in Design Critoria, SQN-DC-V-20.0, paragraph 3.6,
" Environmental Requirements," the AMSAC system equipment qualification shall be consistent with the nonsafety-related equipment qualification licensing basis.for the plant during anticipated operational occurrences only.
AMSAC system design shall, therefore, meet plant normal and abnormal condition paramotors as specified in WCAP-10858.
EQUIPMENT CONTRACT ENVIRONMENT REPORT Relays TDPU Agastat-E7012AE-002 E7012PF-002 8038407 Mlld-47E235-7 ES1000 Switches Cutler-Hammer Wyle Test 10250T-Series 838348 Mild-47E235-7 43583-1 Relays Potter-Brunfield Mild-47E235-7 Nutherm MDR134-1 838291 Harsh-47E235-65 51091R Westinghouse Wyle Test ARD440SR 838336 Mild-47E235-17 17525-1 Press Switches SOR SNN-K45-N4-FIA-TT 838290 Mild-47E235-22 Turb. Blds TESTABILITY AT POWER - Provide informatlon on the planned test program.
I Provide discussion on output signal indication in the control room, including human factors ovaluation.
Each test on the AMSAC system is annunciated in the main control room. Also, see the human factors evaluation on attachment 2.
I t
j h
Testing of AMSAC circuit is done by first putting XS-3-319. -320, and -321 in the test position. This will annunciate in the control room that the system is in test and blocks start / trip signals to the motor-driven feedwater pumps, turbine-driven feodwater pump, main turbine trip bus, and steam generator blowdown and sample line isolation valves.
The turbine impulso pressure switches, pS-1-81 and -82 can be tested using the applicable sections in Instrument Maintenance Instruction, IMI-99, (CC 10.3 and CC 10.4).
The steam generator level switches test can be performed by using the applicable sections in Surveillance Instruction, SI-75.
The above tests can be performed to test input signals to AMSAC control circuit.
To test the load permissive relay, select test position of XS-3-318.
This will be annunciated in the main control room as AMSAC armed. With XS-3-318 in test position, celect test position of XS-3-317 to test the level initiation (red test light will glow) relay.
Once the seicetor switches are returned to the normal position, the AMSAC system will return to service.
This testing of outputs through final actuation devices will be dono during plant shutdown.
For logic sequence to AMSAC sco figure 1.
COMPLETION OF MITIGATIVE ACTIONS - Discuss mitigative action and operator action to return system to normal status.
The AMSAC circuitry ties into the same circuitry used to close the breaker and start the motor-driven AFW pumps.
(See figure 2.)
Detail A of figure 2 shows the breaker closing circuit for the motor-driven AFWps. Once voltage is sensed at node 7, the 52X relay is energized and the breaker is closed.
After the breaker is closed all 52a and 52b fingers swap position. Likewise, the breaker spring limit switches con the discharged spring, and the 52 LSs swap to the position now shown. This gives a straight path for the 52Y relay to energize and seal itself in at 14-15.
The 52X relay was deenergized when the 52b finger at 7-8 swapped position. Loss of voltage at nodo 7 will deenergize the 52Y relay, and the breaker will go back to its original state once the trip signal is received.
Figure 2 also shows the circuitry and operator action to trip the breaker open. The breaker can be tripped manually using HS-3-128A in the main control room or locally at the breaker using the test trip button. The protection circuitry (instantaneous overcurrent relay, ac time overcurrent relay, or the undervoltage relay) is the only other mechanism that will trip the breaker open.
Removal of the AMSAC signal will not cause the breaker to trip open.
Once the turbine has been tripped, specific operator action is required to return to operation.
Removal of the AMSAC signal will not restart the
- turbine, 6
6 h 6 - C
%eQ.
3
TECHNICAL SPECIFICATIONS - Provide information to establish that technical specifications are not required.
WOG has taken the position that technical specification are unnecessary and do not enhance the overall safety of the plant (CF OG-171 dated February 10, 1986). SQN agrees with this position and will use plant procedures and administrative controls to ensure reliable AMSAC operation.