TXX-6184, Forwards Revs 1 to Isap:V.A, Insp for Certain Types of Skewed Welds in Nf Supports, ISAP:I.b.2, Flexible Conduit to Cable Separation, ISAP:I.B.1, ... Flexible Conduit Separation & ISAP:VII.a.7, Housekeeping & Sys..

From kanterella
(Redirected from ML20207E091)
Jump to navigation Jump to search
Forwards Revs 1 to Isap:V.A, Insp for Certain Types of Skewed Welds in Nf Supports, ISAP:I.b.2, Flexible Conduit to Cable Separation, ISAP:I.B.1, ... Flexible Conduit Separation & ISAP:VII.a.7, Housekeeping & Sys..
ML20207E091
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/19/1986
From: Beck J, Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM), Office of Nuclear Reactor Regulation
Shared Package
ML20207E095 List:
References
TXX-6184, NUDOCS 8701020061
Download: ML20207E091 (4)


Text

'""'"*'

i e"h.'Ra"'

e <  ;;

- TEXAS UTILITIES GENERATING COMPANY December 19, 1986 z.. w g geg sg m

e

Director of Nuclear Reactor Regulation ATTN: Mr..V. S. Noonan, Director Comanche Peak Project i Division of Licensing

. .'U. S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

' COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CPRT RESULTS REPORTS-

Dear Mr.:

Noonan: -

We transmit herewith the following SRT approved Results Reports:

VII.a.7 Housekeeping and System Cleanliness, Revision 1 1.b.1 Flexible Conduit to Flexible Conduit Separation, Revision 1 1.b.2 Flexiole Conduit to Cable. Separation, Revision 1 These reports should be placed in sequence behind the tabs "QA/QC" for VII.a.7 and " Electrical" for I .b.1 'and I.b.2 in the results reports binders previously transmitted. Also, enclosed is a revised Table of Contents. reflecting the issuance of these reports.

The files which. contain supporting documentation for these Results Reports have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Susan Palmer (214/979-8242).

In addition, enclosed is a replacement copy of Results Report V.a. Pages from its attachments were inadvertently omitted in the previous copy.

k DO 50$ 5 / g A 8)iVERION OF TEXAN UTELETIEN E1XCTitlC COMPAN1'

f,<

y p ,

4:: December 19, 1986 LPage.2 We shall' issue further ResultsLReports on a periodic- basis as they are

~

approved by the CPRT Senior Review Team.

Very truly yours, v .c.. w :1 .

W. G. Counsil By: C pd,,NA Jgin W. Beck fice President, Nuclear Engineering WGCitj Enclosures I

g _, >.m. .

y - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - -

gr.

y TABLE OF. CONTENTS-COLLECTIVE' SIGNIFICANCE REPORT'

=Later -

JCOLLECTIVE EVALUATION REPORTS hf - Later-.-

$l- -RESULTS REPORTS k;

j, Electrical E I.a.3 Butt-Splice' Qualification - Revision 1 I I.a.4 Agreement Between Drawings and Field Terminations

- Revision 2-I.a.5 NCR's on Vendor Installed Amp Terminal Lugs

- Revision 1 I.b.1 Flexible Conduit to Flexible Conduit Separation  %

- Revision 1

-I b.2 -Flexible Conduit to Cable Separation - Revision 1 0

-I.b.3 Conduit to. Cable Tray Separation - Revision 1 Civil / Structural II.b Concrete Compression Strength - Revision 1 Testino III.a.2 .JTG Approval of Test Data - Revision 0 III.a.3 Technical Specification for Deferred Tests

- Revision 0

'III.a.4 Traceability of Test Equipment - Revision 0 III.d Preoperational Testing - Revision 1

r ,

~ ( k[f; s e -

.. :t; TABLE'0FLCONTENTS (cont.)

r / Mechanical b[ -V.a Inspection for Certain. Types of. Skewed Welds in NF

{gl Supports - Revision 1 w

$? - V.c  : Design Consideration for Piping Systems Between

Seismic Category I and Non-Seismic Category I Buildings - Revision 1

(

V.e . Installation of Main Steam Pipes - Revision 1 OA/0C I.d.2' Guidelines for Administration of QC Inspector Test

- Revision 1 I I.d.3 Craft Personnel Training - Revision 1

-VII.a.4 . Audit Program and Auditor Qualification -

Revision 1 VII.a.5 Periodic Review of QA Program - Revision 1 VII.a.6 Exit Interviews - Revision 1 VII.a.7 Housekeeping and System Cleanliness - Revision 1

.VII.a.8 -Fuel Pool Liner Documentation - Revision 1 VII.b.2 Valve Disassembly - Revision 1 DSAPs

- Later -

2