Submits Status Rept Re Availability of Hardened Technical Support Ctr for May 1985 Emergency Exercise.Use of New Facility Would Enhance Employee Training & Exercise
ML20127A224
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/25/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
85-289, NUDOCS 8506210061
Download: ML20127A224 (2)


Text

I I*

  • CwwLMrw Nonhtor 4ymvut:nu!k1;;strwst helwkno Itac OUk elka.4fi/>

Nam &w(Yrr 38*u OurAuen #ewilud RxMnel Urwnks J f.%I FRP j CFFICIAL Con-April 25 MIN 53 l wwasanse poseen i Dr. J. Nelson Grace Serial No.85-289 l Regional Administrator U.S. Nuclear Regulatory Commission N0/

DocketCAPNos./jmj 5Q4s1.M8-350[

33 b Region II 50 7- 39 101 Marietta Street, Suite 2900 1.icense Nos. NPF-4 Atlanta, Georgia 30323 NPF-7

Dear Dr. Grace:

VIRGfNTA POWER.

NORTH ANNA POWER STATION TECIINICAI SUPPORT CENTER AVAII.Antt. TTY STATtfS The North Anna Embrgency Exorcise will be conducted during the week of May 19, 1985. As discussed in an April 16, 1985 telephone conversation between i Mr. J. W. Martin, Jr. and Mr. W. E. Cline, it is desired that the hardened Technical Support Cantor (TSC) be activated and used for thin exercise.

The following comprisen a statuo report regarding the ~ availability of the hardened TSC for the May 1985 Emergency Exerciso.

Habitability _

The standard il/AC system is operational. The high-efficiency particulate air (HEPA) (11 tors vill not be operational for the exorcipe.

Safety Parameter Dinpiny Syntem Will not be operational for the exercise.

Radiological Ponitoring Syntam The radiological monitoring system for the TSC has boon physically installed but will not be operational for the exercise.

Records Availnbility ,

The following records will be available in the hardoned TSC for the exercise Aperture cards (plant drawings)

Plant manuale Faergency procedures Fmergency Plan and Implementing Procedures Technical Specifications UFSAR Administrativo Procedures Precautions 1. imitations and Satpoints Abnormal Procedures lP"A888A8888llp gj-G ZE3fgo j

.. e Dr. J. N31 con Crcco Other records will be available in the interim TSC-(Station Records Building).

These records will be available for exercise purposes. Couriers will be used to convey these documents between Station Records and the hardened TSC.

Personal performing courier duties will be exempt from exercise radiation requirements.

Communications All required communiEations are operational except the NRC Health Physics Network (HPN) and' the NRC Emergency Notification System (ENS). A tentative completion date for HPN and ENS has been set for May 1, 1985.

Even with the aforementioned ,non-availabilities, it is felt that the use of .

this new facility wouldTgreatly enhance employee training and the exercice as l a whole.

's Sincerely, l

', 4t

' . ^( '

s - U.Cw

- W. L. Stewart l

l Enclosure l cc: Mr. W. E. Cline, Chief l Emergency Preparedness Section Mr. James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing h Mr. M. W. Branch NRC Resident Inspector North Anna Power F*ation s