Application for Amend to License NPF-24,changing Tech Specs to Revise Surveillance Requirement & Acceptance Criteria for Auxiliary Feedwater Pumps
ML20094A752
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/31/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20094A754 List:
References
NUDOCS 8408060097
Download: ML20094A752 (3)


Text

.

P Dunn Powen GOMIRNY I*.O. Ilox W3lflO CIIAHI.OTTE. N.C. 215242 IIAL II. TUCKEH TE LF. PHONE v.,.p......, (704) 373-4531

, m m . - -- July 31, 1984 Mr. H1rold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Con: mission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Cataaba Nuclear Station, Unit i Docket No. 50-413 Technical Specifications

Dear Mr. Denton:

t

'"his letter contains a proposed amendment to the Technical Specifications for Facility Operating License No. NPF-24 far Catawba Unit 1. The attach-ment contains the proposed change and a discussion of the justification and safety analysis. The analysis are included pursuant to 10 CFR 50.91 and it has been concluded that the proposed amendment does not involve significant hazards considerations.

This amendment is considered to involve exigent circumstances in that the proposed amendment will be needed to allow the unit to proceed into Mode 3, which is currently scheduled to occur August 28, 1984. The current Technical Specification Surveillance Requirements for the Auxiliary Feedwater Pumps can not be met. The current requirements were taken from the manufacturer's design requirements, however, the proposed requirements are the requirements assumed in the accident analysis and therefore should be those addressed in the Technical Specifications.

By letters dated June 20, and June 28, 1984 Apnlicants requested a partial exemption from GDC 17 in order to permit the diesel generators for Unit 1 to be inoperabic until initial criticality. It is considered that the information regarding exigent circumstances supporting that request also encompass the situation presented in this application.

Pursuant to 10 CFR 50.91 (b)(1) the appropriate South Carolina State Of ficial is being provided a copy of this amendment request.

Very truly yours, e-

/

dk/a Hal B. Tucker RWO: sib D

Atcachments O PDR ADOCK 95000413 P PUR

Harold R. Denton July 31,.1984:-

Page 2 cc: . Mr . James P. O'Reilly, Regional Administrator U. S.' Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident inspector Catawba Nuclear Station Mr.-Robert Guild, Esq.

Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 MLr. Jesse L. Riley Carolina Envircamental Study Group 853 Henley Place

-Charlotte, North Carolina 28207 Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 Heyward G. Shealy, Chief Bureau of Radiological Health Soutin. Carolina-Departient ef. Health & Snvirereental, Centrol 2600 Bull Street Columbus, South Carolina 29201

- -' -'T-- m,-

~

5-Mr. Harold R. Denton, Director July 31, 1984

Page:3-

- HAL B.. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said

- Company to sign and file.with the Nuclear Regulatory Commission this revision to the Catawba Nuclear Station Technical Specifications,

, Appendix A to License No. NPF-24; and that all statements and

. matters set forth therin are true and correct to the best of

- his knowledge.

/

M x

Hal B. Tucker, Vice President

' Subscribed and sworn to before me this 31' day of July, 1984.

4jjy (:.. .-

y f. - l Notary Public.

1My Commission Expires: ~

'"? September 20, 1984

.r-

{I m A J.5 : =