CVlWS
,,,o 3.6.17 L
3.6 CONTAINMENT SYSTEMS 3.6.17 Containment Valve injection Water System (CVlWS) l LCO 3.6.17 Two CVlWS trains shall be OPERABLE.
APPLICABILITY:
MODES 1,2,3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME l
A.
One CVlWS train A.1 Restore CVlWS train to 7 days inoperable.
OPERABLE status.
B.
Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND B.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> -
l SURVEILLANCE REQUIREMENTS 4
SURVEILLANCE FREQUENCY SR 3.6.17.1 Verify system surge tanks pressure is 2 36.4 psig.
31 days
/
SR 3.6.17.2 Verify valve injection flow rate is < 1.29 gpm (Unit 1) 18 months
< 1.21 gpm (Unit 2) for Train A and < 1.16 gpm for Train B with a surge tank pressure z 36.4 psig.
SR 3.6.17.3 Verify each automatic valve actuates to its correct 18 months position on an actual or simulated actuation signal.
9811270079 981120 PDR ADOCK 05000413 P
PDR Catawba Units 1 and 2 3.6.17-1 Amendment Nos.173/165
., -