Correction to Amends 173 & 165 to Licenses NPF-35 & NPF-52, Respectively,Revising Numbering
ML20196A198
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/20/1998
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20195K195 List:
References
NUDOCS 9811270079
Download: ML20196A198 (1)


Text

. - . _

. . _ . ~ . - - - . _ . _ . . . . - _ . - - . ~ _ _.

,,,o CVlWS 3.6.17 L 3.6 CONTAINMENT SYSTEMS 3.6.17 Containment Valve injection Water System (CVlWS) l LCO 3.6.17 Two CVlWS trains shall be OPERABLE.

APPLICABILITY: MODES 1,2,3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME l

A. One CVlWS train A.1 Restore CVlWS train to 7 days '

inoperable. OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> .

associated Completion

  • Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> -

l SURVEILLANCE REQUIREMENTS 4

SURVEILLANCE FREQUENCY <

SR 3.6.17.1 Verify system surge tanks pressure is 2 36.4 psig. 31 days

/

SR 3.6.17.2 Verify valve injection flow rate is < 1.29 gpm (Unit 1) 18 months

< 1.21 gpm (Unit 2) for Train A and < 1.16 gpm for

, Train B with a surge tank pressure z 36.4 psig.

. SR 3.6.17.3 Verify each automatic valve actuates to its correct 18 months position on an actual or simulated actuation signal.

9811270079 981120 PDR ADOCK 05000413

, P PDR

, Catawba Units 1 and 2 3.6.17-1 Amendment Nos.173/165

- . , -