Monthly Operating Repts for Sept 1995 for McGuire Nuclear Station
ML20093G387
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/30/1995
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20093G379 List:
References
NUDOCS 9510190049
Download: ML20093G387 (10)


Text

-

i 1

1 OPERATING DATA REPORT DOCKET NO 50-369 I

DATE 0ctober !3.1995 OPERATING STATUS COMPLETED BY R.A. Williass TELEPHONE 704-382-5346

1. Unit Name: McGuire 1
2. Reporting Period: Septesber 1, 1995-September 30,1995
3. Licensed Thersal Pouer (MWt): 3411
4. Naseplate Rating (Bross MWe): 13055 Notes eNaseplate Rating 5.DesignElectricalRating(NotMWe):  !!80 (6ross MWe) calculated as
6. Marious Dependable Capacity (Eross MWe):  !!71 1450.000 MVA : .90 power
7. Maxinus Dependable Capacity (Net MWel: 1129 fattcr per Page iii,
8. If Changes Occur in Capacity Ratings (! tees Nusber 3 Through 7) Since Last NUREG-0020. ,

Report. Give Reasons:

9. Pouer Level To Which Restricted, if Any (Net MWe):
10. Reason for Restrictions, If any:

This Month Yr.-to-Date Cusulative

11. Hours in Reporting Period 720.0 6551.0 121247.0
12. Number Of Hours Reactor Was Critical 680.0 6381.9 86741.2
13. Reactor Reserve Shutdown Hours --0-- --0-- --0--
14. H ers Generator On-Line 651.1 6280.4 85793.1 15 Init Reserve Shutdoun Hours - --0-- --0--
16. Gross Thersal Energy Generated (MWH) 2124775 21156059 268978485
17. Cross Electrical Energy Generated (MWH) 725039 7234620 92386343 l
18. Net Electrical Energy Generated (MWH) 693814 6951372 88258740
19. Unit Serv:ct Factor 90.4 95.9 70.8
20. Unit Availability Factor 90.4 95.9 70.0
21. Unit Capacity Factor (Using MDC Net) 85.3 94.0 63.5
22. Unit Capacity Factor (using DER Net) 81.7 29.9 61.7
23. Unit forced Outage Rate 9.6 4.1 13.8
24. Shutdoun Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Rtfueline - December 08. 1995 - 43 davs

23. If Shut Down At End Of Report Period. Estinated Date of Startup:
26. Units In Test Status (Prior to Cosaercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAi!0N 9510190049 951013 PDR ADOCK 05000369 R PDR

t

.- j UNIT-SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369  !

UNIT NAME m w u Ais s A ,

DATE lu/13 / n -

i REPORT MONTH September 1995 COMPLETED BY x. a. williams TELEPHONE t/ueJ-562-3Jed (1) (2) (3). (4) (5)  ;

R MET-E HOD -

T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 3 95- 9-27 F 68.90 A 2 HB VALVEX STEAM GENERATOR "A" MAIN STEAM ISOLATION VALVE FAILED CLOSED (REACTOR MANUALLY TRIPPED) 4-P 95- 9-30 F --

A --

HA CKTBKR CONTINUED INVESTIGATION OF GENERATOR BREAKER TRIPS  ;

5-P 95- 9-30 F --

A --

HH PUMPXX '1A' FEEDWATER PUMP TURBINE LOW PRESSURE STOP VALVE SERVO  ;

I l

i 3

l (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions i S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data  :

B-Maintenance or test C-Refueling 2-Manual Scram Ent W Sheets For Licensee 4

3-Automatic Scram Event Report (LER)

  • D-Regulato n Restriction 4-Other (Explain) File ( M EG-0161)-

E-Operator Trainino & License Examination F-Administrative (5) i G-Operator Error Exhibit I - Same Source i 1

H-Other (Explain) (Explain) t i

i

. . . ~ , .

[ ,

l l

. l

. 1 OPERATIN6 DATA REPORT DOCKET NO 50-369 UNIT McGuire 1 BATE October 13. 1995 COMPLETED BY R.A Williams TELEPHONE 704-382-5346

-MONTH Sentenber 1995 M1 AYERAGEDAILYPOWERLEVEL- 18, AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Nell

.I 1096 17 1998 2 1090 18 1095 3 1091 19 1993 4 1092 20 1097 l 5 1094 21 1100 6 1093 22 jl02 7 1087 23 1101 2

8 1018 24 - 1105 9 1000 25 1108 10 1091 26  !!!2

!! 1091 27 411 12 1094 28 0  ;

l 13 1997 29 0 l

14 1098 M 172  ;

1 15 1093

-16 1093 ,

I e

l DOCKET: 50-369 l UNIT: McGuire 1 1

l Date: 10/13/95 NARRATIVE

SUMMARY

MONTH: September 1995 McGuire Unit I began the month of September operating at 100% full power. The unit operated at or near 100% full power until 09/27/95 at 0923 when the reactor was manually tripped prior to reaching any automatic setpoints due to steam generator 'A' main steam isolation valve failing closed. The unit returned to service on 09/30/95 at 0618. During power escalation, the unit held from 0930 to 1738 at 29% power to further investigate generator breaker trips. The unit held at 2307 for the remainder of the month at 48%

power due to 'l A' feedwater pump turbine low pressure stop valve servo.

i l

Prepared by: R. A. Williams Telephone:(704)- 382-5346 i

l l

l l

j

MONT11LY REFUELING INFORMATION REOUESI

1. Facility name: McGuire. Unit 1
2. Scheduled next refueling shutdown: December 1995
3. Scheduled restart following refueling: J.aguary 1996 Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CIIANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TitROUGli 6 WILL NO LONGER DE MAINTAINED IN Tills REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or l other license amendment?

If yes, what will these be?  !

l l

If no, has reload design t.nd core configuration been reviewed by Safety Review Committee j regarding unreviewed safety questions? l S. Scheduled date(s) for submitting proposed licensing action and supporting information.

6. Important licensing considerations (new or different design or supplier, unreviewed design or l performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: lu (b) in the spent fuelpool: 611
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increaso: ..:
9. Projected date oflast refueling which can be accommodated l'y present license capacity: March
g. . .

DUKE POWER COMPANY DATE: October 13.19M Name of

Contact:

R. A. Williams Phone: (704)-382-5346

- -p

    • 1

\

l l

I OFERATING0ATAREPORT DOCKET NO 50-370 l DATE October 13. 1995 OPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346

1. (; nit Nase: McGuire 2 2.Reportingferiod:Septeober1,1995-September 30,1995
3. Licensed Thersal Poser (MWt): 3411  !
4. Nameplate Rating (Gross MWe): 1305e Notes eNameplate Rating
5. Design Electrical Rating (Net NWe): 1180 (6ross MWe) calculated as 6.Maxinus3ependableCapacity(6rossMWe): 1171 1450.000 MVA : .90 power ,
7. Maxinus Dependable Capacity (Net MWe):  !!29 factor per Page lii, l

' 8. If Changes Occur in Capacity Ratings (Iteas Nusber 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:

1

9. Power Level To Which Restricted, If Any (Net MWe): )
10. Reason For Restrictions, If any: i l

This Month Yr.-to-Date Cumulative 1

l 1

!!. Hours in Reporting Period 720.0 6551.0 101543.0

12. Numbcr 3f Hours Reactor Was Critical 720.0 6175.9 79728.7
13. Reactor Reserve Shutdown Hours --0-- --0-- --0--
10. Hours Benerato' On-Line 720.0 6125.2 78709.8
15. tir.it Reserve Shutdown Hours --0-- -+- --0--
16. Gross Thersal Energy Generated (MWH) 2451456 20638544 258483978 17.GrossElectricalEnergyGenerated(MWH) 832224 7112il7 90160515
18. Net Electrical Energy Generated (MWH) 80 % 89 6839793 86462139
19. Unit Service Factor 100.0 93.5 77.5
20. Unit Availability Factor 100.0 93.5 77.5
21. Unit Capacity Factor (Using MDC Net) 98.5 92.5 74.6
22. Unit Capacity Factor (Using DER Net) 94.2 88.5 72.2
23. Unit Forced Outage Rate 0.0 c.5 6.3
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - March 29, 1996 - 45 days

23. If Shut town At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Consercial Operationi
Forecast Achieved INITIALCRITICALITY

, INITIAL ELECTRICITY COMMERCIAL DPERATION i ,

1

_ _ . _ _ . = _ . . _ , _ . . . . _ - _ _ _ . _ .. _ . _ _ . . . . . _ . . . _ . , . _ . _ . .

l

.. l n .

OPERATIN6 DATA REPORT

]

DOCKET WO 50-370 UNIT McGuire 2' DATE October 13.-1995 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH Santosheri1995 08], AVERASE DAILY POWER LEVEL 98[ AVERAGEDAILYPOWERLEVEL (MWe-Net) IMWe-Net) i l' 1109 17 1112 l 2 1105 18 1110 1

1 3 1106 19 1109 l 4 1107 20 1112

3.  !!06 21 1114 6 1108 22 1116

.7 1107 23 1114 8 1108 24 1118 9 1108 25 1122 I

10 1106 26 1126 l

!! 1106 27 1121 l 12 1108 28  !!20 13 1111 29 1120 14 til2 , 30 1122 i

15 1109 16 1102 l

l

{

UNIT SHUTDOWNS AND POWER REDUCTIONS ' DOCKET NO. 50-370 UNIT NAME muuy1xts 2 DATE lu/13/3d -

REPORT MONTH September 1995 COMPI ETED BY - K. A _. n111iams TLLEPHONE t iusi -as2-dasb (1) (2) (3) (4) (5) l R MET-E HOD '

T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulato g Restriction 4-Other (Explain) File (N'G- 0161)

E-Operator Training & Licent) Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

R

i t

DOCKET: 50-370 UNIT: McGuire 2 Date: 10/13/95 NARRATIVE

SUMMARY

MONTil: September 1995 McGuire Unit 2 began the month of September operating at 100% full power. The unit operated at or near 100% full power for the entire month.

I l

l l

l l

Prepared by: R. A. Williams Telephone: (704)- 382-5346

. - . _ . . ~ - _ _ - - . . -.. . . - - -. .. . ~. . - .

i l

  • l MONTHLY REFUELING INFORMATION REOUEST ,

i

1. Facility name: McGuire. Unit 2 l
2. Scheduled next refueling shutdown: March 1996
3. Scheduled restart fo!!owing refueling: May 1996 i

Tile PROJECT MANAGER IIAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TIIEREFORE, QUESTIONS 4 TilROUGil 6 WILL NO LONGER BE MAINTAINED IN TIIIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? ,

if yes, what will these be?

, if no, has reload design and core con 0guration been reviewed by Safety Review Conimittee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or

. performance analysis methods, signi0 cant changes in design or new operating procedures).

7. Number of Fuel assemblies- (a) in the core: 191 '

(b) in the spent fuel pool: 891

8. Present licensed fuel pool capacity: 1461 Size of requested or planned increase: - .-
9. Projected date cflast refueling which can be accommodated by present license capacity:

December 2001 DUKE POWER COMPANY DATE: October 13.1995 I

R. A. Williams l Name of

Contact:

Phone: (7041- 382-5346