Monthly Operating Repts for May 1997 for McGuire Nuclear Station,Units 1 & 2
ML20140H117
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/31/1997
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20140H113 List:
References
NUDOCS 9706180053
Download: ML20140H117 (10)


Text

.-- - -- - _ - - - - . . . . -

l  !

L  :

! l

.. .. r l

i

!' OPERATING DATA REPORT ,

DOCKET 110 50-369 BATE June 13. 1997 OPERATIN9 STATUS - COMPLETED Bf R.A. Williams TELEPHONE 7M-382-5346

l. Unit Naee: McGuire 1 ,

2.ReportingPeriodsliay1,1997-May31,1997

l. 3. Licensed Thernal Poser (MWtle 3411  ;

4.NaseplateRating(6rossNWeb 1305e Notes eNaseplate Rating

5. Design Electrical Rating (Net MWe):  !!90 (6 toss MWel calculated as ,
6. Maxieue Dependable capacity (6 toss MWe):  !!?! 1450.000 INA : .90 power i
7. Maxieue Dependable Capacity (Net MWe): 1129 factor per Page 111, i
6. If Changes Occur in Capacity Ratings (itees Wueber 3 Through 7) Since Last NURE6-0020. .

Report. 61re Reasons: '

9. Power Level To Which Restricted, if Any (Net MWelt
10. Reason For Restrictions, If any:

This Month Yr.-to-Date Cueulative

!!. Hours in Reporting Period 744.0 3623.0 !35643.0

12. Nueber Of Hours Reactor Was Critical 333.0 1399.5 97791.4
13. Reactor Reserve Shutdown Hours - - 14. Hours Generator On-Line 248.7 1308.4 96699.9 15.UnitReserveShutdownHours - --0--
16. Gross Thereal Energy Generated (MWH) 543543 4031255 3M851317-

.17. Stoss Electrical Energy Generated (MWH1 172769 1383501 104673620

10. Net Electrical Energy 6enerated (MWH) 148377 1303597 100029453 19.UnitServiceFactor 33.4 36.1 71.2
20. Unit Availability Factor _

33.4 36.1 71.2

21. Unit Capacity Factor (Using MDC Net) 17.7 31.9 64.3
22. Unit Capacity Factor (Using DER Net) 16.9 30.5 62.4 23.UnitForcedOutageRate 13.3 2.6 12.7
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Doun At End Of Report Period. Estiested Date of Startup:
26. Units in Test Status (Prior to Consercial Operationh Forecast Achieved INITIALCRITICALITY IN!ilALELECTRICITY CC'IMERCIAL DPERAi!DN

~

9706190053 970613 i' PDR ADOCK 05000369 R PDR

OPERATING DATA REPORT DOCKET NO 50-369 UN!i McGuire 1 DATE June 13. 1997 E0MPLETED BY R.A. Willians TELEPHONE 704-392-5346 MONTH May,1997 L4J, AVERACE DAILY POWER LEVEL QE AVERAGE DA!LY POWER LEVEL (Ne-Neu (We-Neu

! 0 17 0 2 0 18 0 3 0 19 0

  • 4 0 20 100 5 0 21 215 6 0 22 214 7 0 23 285 6 0 24 7 9 0 25 651 10 0 26 1003

!! 0 27 1122 12 0 28 1121 13 0 29  !!42 14 0 30 224 l

15 0 31 601 16 0 1

l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 l UNIT NAME m w u l xts 1 - t DATE ve/13/s/ -

REPORT MONTH May 1997 ' COMPLETED BY x. a. williams [

TELEPHONE ( i ue ) -J o z -:>3 4 6  !

(1) (2) (3) (4) (5)  !

R MET- '

E HOD i T A OF LICENSE  :

N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE i' O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE l

1 97 1 S 444.58 C --

RC FUELXX END-OF-CYCLE 11 REFUELING OUTAGE 2 97- 5-19 S 12.43 B --

HA TURBIN TURBINE OVERSPEED TRIP TEST 2-P 97- 5-20 S --

A --

HG XXXXXX HOLDING AT 30% POWER SECONDARY CHEMISTRY ,

i 3-P 97- 5-23 S --

B --

HA ZZZZZZ UNIT LOAD TRANSIENT TEST l

4-P 97- 5-23 S --

B --

HA TRANSF UNIT LOAD TRANSIENT TEST l 3 97- 5-24 F 17.00 A --

HA TURBIN HIGH PRESSURE TURBINE LEAK 5-P 97- 5-25 S --

B --

HA TRANSF HOLDING AT 78% POWER TO PERFORM i UNIT LOAD TRANSIENT TEST f 4 97- 5-30 F 21.27 A --

HA VALVEX "1C2" TURBINE INTERCEPT VALVE OIL LEAK }

(1) (2) (3) (4) I F Forced Reason- Method: Exhibit G - Instructions  !

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee i C-Refueling 3-Automatic Scram (LER  !

D-Regulatory Restriction 4-Other (Explain) Event File Report (NUREG-0161)) l E-Operator Training & License Examination  !

F-Administrative (5)  !

erator Error Exhibit I - Same Source G-@her H-Ot (Explain) (Explain)  !

i I

i i

_ _ _ _ _ _ _ _ _ _ ____ _ _ _ _ __ __.. . . _._. _ _. . . . ~ _ _ _ . _ . . _ . _

-. . .. - . - -_ -. - - . - - . . - - - - . - ... - -.- _. - - - . - - . ~ . .

MONTHLY REFUELING INFORMATION REOUEST i

1. Facility name
McGuire Unit 1  :

i

2. Scheduled next refueling shutdown: June 1998 l

l

[

3. Scheduled restart following refueling: July 1998  ;

Tile PROJECT MANAGER IIAS BEEN ADVISED BY SEPARATE COMMUNICATION OF  !

ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 .

TilROUGli 6 WILL NO LONGER BE MAINTAINED IN tills REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or  ;

i other license amendment?

Ifyes, what will these be?

l If no, has reload design and core configuration been reviewed by Safety Review Committee i regarding unreviewed safety questions?

5. Scheduled date(s) for submittirig proposed licensing action and supporting information. j l
6. Important licensing considerations (new or different design or supplier, unreviewed design or

.l performance analysis methods, significat changes in design or new operating procedures).

l

7. Number of Fuel assemblies (a) in the core: .[93 l (b) in the spent fuel pool: 2.91 9
8. Present licensed fuel pool capacity: 1463 Size of requested or plann~t ~ cease: -
9. Projected date oflast ref uelmg which can be accommodated by present license capacity:

November 2005 DUKE POWER COMPANY DATE: June 13.1997 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 r

i b

i i

I l

l'

1 DOCKET: 50 - 369 UNIT: McGuire 1 Date: 06/13/97 NARRATIVE

SUMMARY

MONTil: May,1997 McGuire Unit 1 began the month of May in end-of-cycle 1 I refueling and steam generator replacement outage. The refueling and steam generator replacement outage has spanned a total of 94.33 days and was scheduled for 100 days. On 05/19/97 at 1235 the unit was placed on-line. The turbine overspeed trip test was performed on 05/19/97 at 1735. The unit returned to service on 05/20/97 at 0602. During power escalation, the unit held at 30% power from 05/20/97 at 1701 to 05/23/97 at 0353 for secondary chemistry and testing. The unit held at 38% power and 26% power from 05/23/97 at 0822 to 2130 and from 2150 to 2211 due to unit load transient testing. The unit was removed from service on 05/24/97 at 0134 due to high pressure turbine leak. The unit was placed on-line on 05/24/97 at 1834. The unit increased to 78%

power and held from 05/25/97 at 1818 to 05/26/97 at 0145 due to unit load transient testing. On 05/30/97 at 0521 rapid down-power initiated and the unit was taken off-lire at 0526 due to "lC2" turbine intercept valve oil leak. The unit returned to service on 05/31/97 at 0242. The unit returned to 100% full power on 05/31/97 at 2306 and operated at or near 100% full power the remainder of the month.

Prepared by: R. A. Williams l Telephone:(704)- 382-5346 l

l

_ _. _ _ _ _ . _ . . _ _ . - . _ . _ - _. _ _ _ _ - .~. ._ _. _ _ . _ _ . _ . . _

l

~

c DPERATIN6 DATA REPORT i

DOCKET NO 50-370 DATE June 13. 1997 QPERATING STATUS COMPLETED BY R.A. Willians I TELEPHONE 704-382-5346 i l 1. Unit Naee M:6uire 2 1

2. Reporting Period: May 1,' 1997-May 31, 1997
3. Licensed Thereal Power (Mt): 3411
4. Naseplate Rating (Gross NWe)
1305e Notes eNameplate Rating
5. Design Electrical Rating (Net Me): 1100 (Gross Me) calculated as .[

6 'Maxieue Dependable Capacity (Gross Me): 1171 1450.000 MVA x .90 power l l

7. Natious Dependable Capacity (Net Me): 1129 factor per Page ill,  ;
9. If Changes Occur in Capacity Ratings (Itees Nueber 3 Through 7) Since Last NURE6-0020.  ;

Report. Elve Reasons:

l i

, 9.. Power Level To Which Restricted, If Any (Net Me): j l 10. Reason For Restrictions, If any:

L l 1

i This Month Yr.-to-Date Cumulative i I ,

l

!!. Heurs in Repitting Period 744.0 3623.0 116159.0

12. Nusber Of Hours Reactor Was Critical 744.0 3623.0 91965.6
13. Reacter Reserve Shutdown Hours - --0-- --0--
14. Hours Serierator On-Line 744.0 3623.0 90B99.0 l 15. Unit Reserve Shutdown Hours --0-- - - i 16. Gross Thersal Energy Generated (MH) 2532005  !!760046 298870956
17. Gross Electrical Energy Benerated (MWH) 881558 4096959 104169994
19. Het Electrical Energy Benerated (MHi 849458 3941994 99910129
19. Unit Service Factor 100.0 100.0 78.3
20. Unit Availability Factor 100.0 100.0 78.3
21. Unit Capacity Factor (Using MDC Net) 101.1 96.4 75.5 1 22.UnitCapacityFactor(UsingDERNet) 96.8 92.2 72.9
23. Unit Forced Outage Rate 0.0 0.0 7.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling and Steam Generator Replacement - Sentmedier 27, 1997 - 90 days i 25. If Shut Down At End Of Report Period. Estimated Date of Startup:  ;

( 26. Units In Test Status (Prior to Coseercial Operation): Forecast Achieved i

INITIAL CRITICALITY INITIAL ELECTRICITY I CONMERCIAL CPERATION 1

L 1

O t

OPERATING DATA REPORT DOCKET NO 50-370 l UNIT McGuire 2 l DATElune 13. 1997 E0MPLETED BY R.A. Williang -

TELEPHONE 704-382-5346 MONTH Har. 1997 l lAl AVERAGE DAILi POWER LEVEL 981' AVERA6E DAILY POWER LEVEL (MWe-Net) (MWe-Nst) l-i 1 1140 17 1144 2 1145- 18 1143 3' 1144 19 1145 4 1142 _ 20 1144 l

l 5 1142 21 1141 l-6 1143 22 1129  ;

7  !!41 23 1137 l 8  !!44 24 (143

9. 1146 25 1146 10 1144 26 1142

!! 1145 27  !!33 12 1147 28 1130 1

I 13 1146 29 1136 j

14  !!44 30 1136 15 - 1143 31 1137

' 16 1145 )

l.

l 1

i l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 U N I T N A M E m w u i x t; z .

t DATE u b /1.5 / 3 i REPORT MONTH May 1997 -COMPLETED BY x. a. williams TELEPHONE ( Iv e) .su z - d.se d (1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S ,

t t

b V t

l l

i i

(1) (2) (3) (4)

F Forced Reason- Method: Exhibit-G - Instructions- t S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation Entry Sneets For of Data Licensee [

B-Maintenance or test 2-Manual Scram C-Refueling 3-Automatic Scram Event Report (LER)  :

D-Regulatory Restriction- , ,

4-Other (Explain) File (NUREG-0161)

E-Operator Training & License Examination -

F-Administrative (5) l G-Operator Error Exhibit I - Same Source (Explain) (Explain)

H-Other  :

[

i I

i i

i

- _ . . _ _ _ _ _ = _ _ _ _ . . _ _ _ _ _ _ _ . _ . _ _ _ _ . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ - - . _ _ _ _ __ _ . . _ . . . . - , , __ _ . . . - -~. . _ . . , , . . . , , , , , .

i . .

l S

MONTliLY REFUELING INFORM ATION REOUEST

1. Facility name: McGuire. Unit 2

! 2. Scheduled next refueling shutdown: September 1997

3. Scheduled restart following refueling: December 1997 Tile PROJECT MANAGER IIAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TliROUGil 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification chang.e or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 962
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --

i 9. Projected date oflast refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: June 13.1997 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

l l

l

1 l

i j

l l

I DOCKET: 50-370 1 UNIT: McGuire 2 Date: 06/13/97 NARRATIVE

SUMMARY

MONTil: May,1997 McGuire Unit 2 began the month of May operating at 100% full power. The unit operated at or near 100%

full power for the entire month.

l.

l l

Prepared by: R. A. Williams l Telephone: (704)- 382-5346 i