Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2401998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8201998-06-30030 June 1998 Monthly Operating Repts for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236F0381998-05-31031 May 1998 Monthly Operating Repts for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8251998-05-31031 May 1998 Revised MOR for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247K3851998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for McGuire Nuclear Station ML20247L5981998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0681998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247L6181998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E3991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0811998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1997 for McGuire Nuclear Station,Units 1 & 2 ML20202G7531998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E4111998-01-31031 January 1998 Rev 1 to Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20202G7741997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station,Units 1 & 2 ML20198P2521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station ML20203H6491997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for McGuire Nuclear Station,Units 1 & 2 ML20199D3221997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station ML20203H6601997-10-31031 October 1997 Revised Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station,Units 1 & 2 ML20211P9841997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for McGuire Nuclear Station ML20216K1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for McGuire Nuclear Station,Units 1 & 2 ML20216K1561997-07-31031 July 1997 Revised Monthly Operating Status Rept for Jul 1997 for McGuire Nuclear Station,Units 1 & 2 ML20210L0691997-07-31031 July 1997 Monthly Operating Repts for July 1997 for MNS ML20149F2421997-06-30030 June 1997 Monthly Operating Repts for June 1997 for McGuire Nuclear Station,Units 1 & 2 ML20140H1171997-05-31031 May 1997 Monthly Operating Repts for May 1997 for McGuire Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage ML20151W3521998-09-0808 September 1998 Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236P0451998-07-0808 July 1998 Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days 1999-09-30
[Table view] |
Text
. 0 PIRATING DATA REPORT DOCIET NO 50-169 IATI Acril 15, 1998 !
0FIRATING STATUS COMPLITID BY R.A. Villiars !
TILIPENI 704-382-5346 l
- 1. Unit Name: McGuire 1 2.ReportingPeriod: March 1,1998 March 31,1999 3.LicensedThernalPcuer(MWt): 3(11 l
- 4. Naseplate Rating (Gross MWe): 1305' Notes ' Nameplate lating 5.DesignIlectricalRating(NetMWe): 1180 (GrossMWe)calculatedas 6.MaxinusDependableCapacity(GrossMWe): 1171 1450.000 MVA I .90 power 7.MaxistaDependableCapacity(NetMie): 1100 .factorperPage111, O.IfChangesOccurinCapacityRatings(ItetsNuther3Through1)SinceLast NURIG-0020. j lepert. Give lessons: !
l l
- 9. Pcuer Level 70 Which Restricted, If Any (Net MWe): )
- 10. Reason for Restrictions, If any: _
1 I
ThisMcath Tr. to Date Cusulative
- 11. Hours In Reporting Period 74( 0 2160.0 1(3160.0 12.NutterOfEcursteactorVasCritical 744,0 2120.9 104994.0 13.ReacterReserveShutdownH0ers --0-- 0-
- 14. Ecurs Generator On Line 729.4 2102.7 103857.7 19.UnitleserveShutdownH0urs - - --0--
16.GrossThernalInergyGenerated(MWH) 2428310 7018099 329017140 17.GrcssIlectricalEnergyGenerated(MVB) 852612 2469989 113068223 18.NetIlectricalEnergyGenerated(MH) 822527 2382270 108112572 ;
19.UnitServicefacter 98.0 97.3 72.6 l 20.UnitAvailabilityfactor 98.0 97.3 72.6 l 21.Unitcapacityfactor(UsingMDCNet) 100.5 100.3 66.0 ;
22.UnitCapacityfacter(UsingDIRNet) 93.7 93.5 64.0
- 23. Unit forced Outage late 2,0 2.7 12.1 21.Shutd:vnScheduledOverNext6Menths(Type,Date,andDurationcfIach):
Refueling - May 29, 1998 - 35 days
- 25. If Shut Dern At Ind Of Repcrt Period. Istiaated Date of Starttp:
26.UnitsInTestStatus(PricttoCcIIercialOperation): Forecast Achieved ;
INITIAL CRITICALITY INITIAL IIICTRICITY COMMERCIAL OPERATION 9804220411 DR 980415 ADOCK 05000369 PDR o
0 PIRATING DATA RIP 0t? ;
i DOCKIf R0 50 169 j
UNIT McGuire 1 1 DATE Acril 15. 1998 COMPLITID BY 1.A. Villians
.TILIPHONI 704 382 5346 MOITH March.1998 j Lal .AVIRAGI DAILY POVIR LIVIL Dil AVIRAGE EAILY POWIR LIVIL l (NVeNet) (NVeNet) 1 1162 17 1160 2 422 18 1161
-3 914 19 1162 ;
4 1161 20 1163 !
5 1162 21 1163 l
6 1160 652 1 22 1
7 '1158 23 935 j 0 1160 24 1159 9 1162 25 1156 10 1161 26 1161 11 1161 27 1161 12 1162 28 1162 13 1162 29 1162 14 1163 30 1161 15 1162 31 1161 16 1160
e _
s e nas e
- s. d otn c ma iae r aa R tDc u i d E E ci o l - N T R ufL) S l z
- 1 I A O ro R) ui s B E T t rE1 e y R A t w a. - H snoL6 m 9 s / - E U E R noF(1 a 6 u 3 .) V E T R A Ii 0 S 3 u 1 A s I C P tst-
- y/ u T N E R E atrG -
0 u e . s C E R O S S S reoE 5 Mu x (
E R U T R R G a e pR I ROR S A E O O pneU x
RTU S R T T teSRN ( t
.EEYE O C E A u C C ir i OMTBN CNE R P T E E bPytne b NAA O OR P E S T T i i
_ WDDH DI S I E E h r t el h T EP NTT WE O D D xonvi x ET TE ACN OV E M )EfEEF )E KI EL AE LL R K E E 4 5
. CN LE E V A U "A R R ( (
OU PT S E T 1E O O D M U R A" V S BL C C O A P 1T I 1 X X C C "P O "R E E m)
RC E M E an
_ RT T T ri IR " IA S S mca
_ AE 1K AE U U aSl r p PT BA PH J J
- EN 1E EE D D ccx RI "L RR A A SiE S t(
N lla O T N X H
- aamr I H U U duuoe T ) E E C C R R onnth C 8 5 NE V X X T T haaut
- U 9 (
OD L E E S S tMMAO D PO A T T N N e-9 E 1 MC V H H I I )M1234 R O 3 h C (
R c n E r - E o W a ) SMD A B B E E ,i
- O M 4 YEO H H H I I t P STC a
(
n D- ,i N E m A S T a S
NTR x
_ ENO. E N- CEPO W H IVEN ) e O T LER n s u N i n T O a e)
U H
M -
)TD UWX TN l p
c n
- - - - - ni i S T 3EOFHO/ - - - - - x oL a R (MHOSDR E i l T
O (t t& p I P ) s c x
_ N E 2 A A A B B ee ig E
_ U R (REASON rt rn (
u ti )
lr snern N 7 io eivoi O 5. a R ai r a IS .
Fe rtrl TR 4 - - - - c yt aE p AU 1 - - - - tngr r x _
RO nanortrE UH enitoso(
D m el a tit
_ pt el a n a r ni n u u ri r e
_ ) o u if ge m eh 1 TYPE F F F F F s qa e e pd pt _
(
aEMRROAOO _
e- _
)RABCDEFGH 2 2 2 3 3 2 _
2 2 2 2 (
E 3 3 3 3 3 d _
T e .
A - - - - - l D 8 du 8 8 8 8 _
9 9 9 9 9 ed _
ce
_ rh P P P P oc
- - - - FS NO. 2 2 3 4 5
)FS 1
(
I i MONTHLY REFUELING INFORMATION REOUEST l
i
- 1. Facility name: McGuire Unit 1
- 2. Scheduled next refueling shutdown: May 1998
- 3. Scheduled restart following refueling: July 1998 l
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l- THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l
- 4. Will refueling or resumption of operation thereafter require a technical specification change or i other license amendment?
l If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
l
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or perfonnance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: J91 (b) in the spent fuel pool: 19].
9 l
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
l 9. Projected date oflast refueling which can be accommodated by present license capacity:-
! November 2005 DUKE POWER COMPANY DATE: April 15.1998 l
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l
l 1
l
I
\ .
DOCKET: 50 - 369 UNIT: McGuire 1 Date: 04/15/98 NARRATIVE
SUMMARY
MONTH: March,1998 McGuire Unit i began the month of March operating at 100% full power. The unit began decreasing power on 03/02/98 at 0741 and was taken off-line 03/02/98 at 1013 to repair "l A' low pressure turbine intercept valve. The unit was placed on-line 03/03/98 at 0047. The unit returned to 100% full power on 03/03/98 at 1550. On 03/22/98 at 0805 the unit began decreasing power and held at 46% power from 1047 to 1455 and at 26% power from 1701 to 03/23/98 at 0021 due to "IBl" moisture separator reheater leak repair. During power escalation, the unit held at approximately 48% power from 03/23/98 at 0328 to 0401 and the unit held at approximately 66% power from 0603 to 0615 to adjust excore detectors. The unit returned to 100%
full power on 03/23/98 at 1500 and operated at or near 100% full power the remainder of the month.
i Prepared by: R. A. Williams Telephone:(704)- 382-5346
i l ~
l l
CPIRATING DATA RIPORT l
l l
DOCIIT NO 50 370 DATIlpril 15. 1998 l OPIRATING STATUS COMPLITID BT P.A. Willians
! TILIPHCNI 704 382 5346
- 1. Unit Nate: McGuire 2 2.ReportingPeriod: March 1,1998 March 31,1998 3.LicensedThernalPcuer(MWt): 3411
- 4. Naseplate Rating (Grcss MWe): 1305' Nctes 'Naseplate Rating 5.DesignIlectricalRating(NetMWe): 1190 (GrcssMWe)calculatedas 6,MaxinusDependablecapacity(GrcssMWe): !!71 1450.000 MVA I .90 pcVer 7.MaxitusDependableCapacity(NetMWe): 1100 fatterperPage111, 8.IfChangesoccurinCapacityRatings(ItetsNuther3Through7)SinceLast NURIG0020.
Report. Give Reascas:
l 9. Power Level 70 Which Restricted, If Any (Net MWe):
- 10. Reason for Restricticas, If any:
thisMonth Tr.-to Date Cusulative
- 11. Hours In Reperting Period 744.0 2160.0 123456.0 12.NutherOfHoursReacterVasCritical 744.0 2126.7 96773.1
- 13. Reactor Reserve Shutdcwn Hours - 0-- 0--
l 14. Hours Generator on Line 7(4.0 2115.7 95606.3 l 15.UnitReserveShutdownHours - - 0-16.GrossThertalInergyGenerated(MWH) 2486312 7141421 314385407
- 17. Gross Ilectrical Energy Generated (XVH) 876046 2518256 109533664 18.HetIlectricalEnergyGenerated(MVH) 845668 2429604 105043474
- 19. Unit Service facter 100.0 98.0 77.4 20.UnitAvailabilityfacter 100.0 98.0 77.4 21.UnitCapacityFactcr(UsingMDCNet) 103.3 102.3 74.8
- 22. Unit Capacity facter (Using DIR Net) 96.3 95.3 72.1 j
- 23. Unit forced Outage Rate 0.0 2.1 7.3 i 24.ShntdcrnScheduledOverNext6Menths(Type,Date,andturaticaofIach): l None ;
- 25. If Shut Down At Ind Of Report Period. Estitated Date of Startup:
l 26.UnitsInTestStatus(PriortoOctaercialC;eratien): Forecast A:hieved i IIITIAL CRITICALITY INITIAL IIICTRICITY CCMMIRCIAL OPIRATION l-
t l
0 PIRATING DATA IIP 017 i D00 KIT B0 50-370 i CIIT McGuira 2 )
DATE April 15. 1998 l COMPLITID BY R.A. Villians !
?!LIPHONE 704 382-5346 I I l
I N0HTH March. 1998 LQ AVERAGI DAILT POWII LIVIL IAI AVIRAGE DAILY POEIR LIVIL ;
(NWeNet) (MWe-Net) I i
1 1162 17 1158 -
2 1159 18 1159
)
~
3 1139 19 1160 4 1160 20 1161 j I
- 5. 1161 21 1161 1 i
6 1160 22 1160 7 535 23 1159 8 1077 24 1158 I
9 1160 25 1161 <
l 1
10 1159 26 1160 l I
11 1160 27 1162 12 1159 28 1162 l 13 1160 29 1161 l 14 1160 30 1162 15 1161 31 1162 l 16 1159 1
e s e sa
. nas e N otn c ms O iae r -
as I tDc u i o T ci o
_ l - C ufL) S
_ z l z E ro R) ui u
_ N t rE1 e N
t sw 3, - snoL6 m E O
_ 0 t /
u noF(1 a V E C
_ 7 d .) Ii 0 S 3 u 1 A e I C tst-
__ v T N N
- w/ atrG -
. 0 t s . I C E O reoE 5 m u x
(
E R I G a e pR I ROR T pneU RTU A teSRN ( t
.EEYE O C L ir i OMTBN CNE U b NAA O NDDH DI OR S N
bPwt i ne h r t el i
h T EP NTT I xonvi x ET TE ACN )EfEEF )E
- KI EL AE E 4 5
- CN LE E V N ( (
OU PT S E I D M U R L O A P C C S m)
U an B ri mca
" aSl B r p 2 ccx
" SiE S t(
N lla
_ O T :aamr I N N duuoe T ) E O onnth C 8 5 NE C haaut
_ U 9 (
OD E tMMAO
_ D 9 PO L e-
- E 1 MC E )M1234 R O 3 h C (
- R c n E r o
- E W a ) SMD D ,i O M 4 YEO E t P (
STC a n
D ,i N E m A S T a NTR x S ENO. E N CEPO _
W H IVEN ) e .
O T LER n s _
u N n i
r O a e) ..
u M - rN l c n a )TD uWX - p ni i S T 3EOFhO/ - x oL a R (MHOSDR E i l T O (t t& p I P ) s c x
_ N E 2 A ee ig E _
U R (REASON rt rn ( _
u ti )
- lr snern
_ N i o eivoi O a Raira .
_ IS Fe rtrl _
TR
_ - c yT aE p .
AU - tngr r x .
RO nanortrE UH
- enitoso(
D melatit pt el a n a r ni n u u ri r e
) o u if ge m eh 1 TYPE F s qa e e pd pt
(
aEMRROAOO e-
)RABCDEFGH 7 2
(
E 3 d T e A - l D 8 du 9 ed ce rh P oc
- FS NO . 1
)FS 1
(
MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: McGuire Unit 2
- 2. Scheduled next refueling shutdown: February 1999
- 3. Scheduled restart following refueling: March 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT.- THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: j_91 9
(b) in the spent fuel pool: 1037
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: April 15.1998 Name of
Contact:
R, A. Williams Phone: (704)- 382-5346
s ,
DOCKET: 50-370 UNIT: McGuire 2 l
Date: 04/15/98 f
t NARRATIVE
SUMMARY
MONTil: March,1998 McGuire Unit 2 began the month of March operating at 100% full power. The unit began decreasing power j ou 03/06/98 at 2310 and held at 45% power from 03/07/98 at 0444 to 2300 to allow inspection of"2B" j bus line insulation connection. The unit returned to 100% full power on 03/08/98 at 1203 and operated at j or near 100% full power the remainder of the month.
l l
Prepared by: R. A. Williams '
Telephone: (704)-382 5346 l