Monthly Operating Repts for Mar 1998 for McGuire Nuclear Station,Units 1 & 2
ML20217B068
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/31/1998
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20217B061 List:
References
NUDOCS 9804220411
Download: ML20217B068 (10)


Text

. 0 PIRATING DATA REPORT DOCIET NO 50-169 IATI Acril 15, 1998  !

0FIRATING STATUS COMPLITID BY R.A. Villiars  !

TILIPENI 704-382-5346 l

1. Unit Name: McGuire 1 2.ReportingPeriod: March 1,1998 March 31,1999 3.LicensedThernalPcuer(MWt): 3(11 l
4. Naseplate Rating (Gross MWe): 1305' Notes ' Nameplate lating 5.DesignIlectricalRating(NetMWe): 1180 (GrossMWe)calculatedas 6.MaxinusDependableCapacity(GrossMWe): 1171 1450.000 MVA I .90 power 7.MaxistaDependableCapacity(NetMie): 1100 .factorperPage111, O.IfChangesOccurinCapacityRatings(ItetsNuther3Through1)SinceLast NURIG-0020. j lepert. Give lessons:  !

l l

9. Pcuer Level 70 Which Restricted, If Any (Net MWe): )
10. Reason for Restrictions, If any: _

1 I

ThisMcath Tr. to Date Cusulative

11. Hours In Reporting Period 74( 0 2160.0 1(3160.0 12.NutterOfEcursteactorVasCritical 744,0 2120.9 104994.0 13.ReacterReserveShutdownH0ers --0-- 0-
14. Ecurs Generator On Line 729.4 2102.7 103857.7 19.UnitleserveShutdownH0urs - - --0--

16.GrossThernalInergyGenerated(MWH) 2428310 7018099 329017140 17.GrcssIlectricalEnergyGenerated(MVB) 852612 2469989 113068223 18.NetIlectricalEnergyGenerated(MH) 822527 2382270 108112572  ;

19.UnitServicefacter 98.0 97.3 72.6 l 20.UnitAvailabilityfactor 98.0 97.3 72.6 l 21.Unitcapacityfactor(UsingMDCNet) 100.5 100.3 66.0  ;

22.UnitCapacityfacter(UsingDIRNet) 93.7 93.5 64.0

23. Unit forced Outage late 2,0 2.7 12.1 21.Shutd:vnScheduledOverNext6Menths(Type,Date,andDurationcfIach):

Refueling - May 29, 1998 - 35 days

25. If Shut Dern At Ind Of Repcrt Period. Istiaated Date of Starttp:

26.UnitsInTestStatus(PricttoCcIIercialOperation): Forecast Achieved  ;

INITIAL CRITICALITY INITIAL IIICTRICITY COMMERCIAL OPERATION 9804220411 DR 980415 ADOCK 05000369 PDR o

0 PIRATING DATA RIP 0t?  ;

i DOCKIf R0 50 169 j

UNIT McGuire 1 1 DATE Acril 15. 1998 COMPLITID BY 1.A. Villians

.TILIPHONI 704 382 5346 MOITH March.1998 j Lal .AVIRAGI DAILY POVIR LIVIL Dil AVIRAGE EAILY POWIR LIVIL l (NVeNet) (NVeNet) 1 1162 17 1160 2 422 18 1161

-3 914 19 1162  ;

4 1161 20 1163  !

5 1162 21 1163 l

6 1160 652 1 22 1

7 '1158 23 935 j 0 1160 24 1159 9 1162 25 1156 10 1161 26 1161 11 1161 27 1161 12 1162 28 1162 13 1162 29 1162 14 1163 30 1161 15 1162 31 1161 16 1160

e _

s e nas e

s. d otn c ma iae r aa R tDc u i d E E ci o l - N T R ufL) S l z

- 1 I A O ro R) ui s B E T t rE1 e y R A t w a. - H snoL6 m 9 s / - E U E R noF(1 a 6 u 3 .) V E T R A Ii 0 S 3 u 1 A s I C P tst-

- y/ u T N E R E atrG -

0 u e . s C E R O S S S reoE 5 Mu x (

E R U T R R G a e pR I ROR S A E O O pneU x

RTU S R T T teSRN ( t

.EEYE O C E A u C C ir i OMTBN CNE R P T E E bPytne b NAA O OR P E S T T i i

_ WDDH DI S I E E h r t el h T EP NTT WE O D D xonvi x ET TE ACN OV E M )EfEEF )E KI EL AE LL R K E E 4 5

. CN LE E V A U "A R R ( (

OU PT S E T 1E O O D M U R A" V S BL C C O A P 1T I 1 X X C C "P O "R E E m)

RC E M E an

_ RT T T ri IR " IA S S mca

_ AE 1K AE U U aSl r p PT BA PH J J

- EN 1E EE D D ccx RI "L RR A A SiE S t(

N lla O T N X H

aamr I H U U duuoe T ) E E C C R R onnth C 8 5 NE V X X T T haaut

- U 9 (

OD L E E S S tMMAO D PO A T T N N e-9 E 1 MC V H H I I )M1234 R O 3 h C (

R c n E r - E o W a ) SMD A B B E E ,i

- O M 4 YEO H H H I I t P STC a

(

n D- ,i N E m A S T a S

NTR x

_ ENO. E N- CEPO W H IVEN ) e O T LER n s u N i n T O a e)

U H

M -

)TD UWX TN l p

c n

- - - - - ni i S T 3EOFHO/ - - - - - x oL a R (MHOSDR E i l T

O (t t& p I P ) s c x

_ N E 2 A A A B B ee ig E

_ U R (REASON rt rn (

u ti )

lr snern N 7 io eivoi O 5. a R ai r a IS .

Fe rtrl TR 4 - - - - c yt aE p AU 1 - - - - tngr r x _

RO nanortrE UH enitoso(

D m el a tit

_ pt el a n a r ni n u u ri r e

_ ) o u if ge m eh 1 TYPE F F F F F s qa e e pd pt _

(

aEMRROAOO _

e- _

)RABCDEFGH 2 2 2 3 3 2 _

2 2 2 2 (

E 3 3 3 3 3 d _

T e .

A - - - - - l D 8 du 8 8 8 8 _

9 9 9 9 9 ed _

ce

_ rh P P P P oc

- - - - FS NO. 2 2 3 4 5

)FS 1

(

I i MONTHLY REFUELING INFORMATION REOUEST l

i

1. Facility name: McGuire Unit 1
2. Scheduled next refueling shutdown: May 1998
3. Scheduled restart following refueling: July 1998 l

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l- THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l

4. Will refueling or resumption of operation thereafter require a technical specification change or i other license amendment?

l If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

l

6. Important licensing considerations (new or different design or supplier, unreviewed design or perfonnance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: J91 (b) in the spent fuel pool: 19].

9 l

8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =

l 9. Projected date oflast refueling which can be accommodated by present license capacity:-

! November 2005 DUKE POWER COMPANY DATE: April 15.1998 l

Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

l 1

l

I

\ .

DOCKET: 50 - 369 UNIT: McGuire 1 Date: 04/15/98 NARRATIVE

SUMMARY

MONTH: March,1998 McGuire Unit i began the month of March operating at 100% full power. The unit began decreasing power on 03/02/98 at 0741 and was taken off-line 03/02/98 at 1013 to repair "l A' low pressure turbine intercept valve. The unit was placed on-line 03/03/98 at 0047. The unit returned to 100% full power on 03/03/98 at 1550. On 03/22/98 at 0805 the unit began decreasing power and held at 46% power from 1047 to 1455 and at 26% power from 1701 to 03/23/98 at 0021 due to "IBl" moisture separator reheater leak repair. During power escalation, the unit held at approximately 48% power from 03/23/98 at 0328 to 0401 and the unit held at approximately 66% power from 0603 to 0615 to adjust excore detectors. The unit returned to 100%

full power on 03/23/98 at 1500 and operated at or near 100% full power the remainder of the month.

i Prepared by: R. A. Williams Telephone:(704)- 382-5346

i l ~

l l

CPIRATING DATA RIPORT l

l l

DOCIIT NO 50 370 DATIlpril 15. 1998 l OPIRATING STATUS COMPLITID BT P.A. Willians

! TILIPHCNI 704 382 5346

1. Unit Nate: McGuire 2 2.ReportingPeriod: March 1,1998 March 31,1998 3.LicensedThernalPcuer(MWt): 3411
4. Naseplate Rating (Grcss MWe): 1305' Nctes 'Naseplate Rating 5.DesignIlectricalRating(NetMWe): 1190 (GrcssMWe)calculatedas 6,MaxinusDependablecapacity(GrcssMWe):  !!71 1450.000 MVA I .90 pcVer 7.MaxitusDependableCapacity(NetMWe): 1100 fatterperPage111, 8.IfChangesoccurinCapacityRatings(ItetsNuther3Through7)SinceLast NURIG0020.

Report. Give Reascas:

l 9. Power Level 70 Which Restricted, If Any (Net MWe):

10. Reason for Restricticas, If any:

thisMonth Tr.-to Date Cusulative

11. Hours In Reperting Period 744.0 2160.0 123456.0 12.NutherOfHoursReacterVasCritical 744.0 2126.7 96773.1
13. Reactor Reserve Shutdcwn Hours - 0-- 0--

l 14. Hours Generator on Line 7(4.0 2115.7 95606.3 l 15.UnitReserveShutdownHours - - 0-16.GrossThertalInergyGenerated(MWH) 2486312 7141421 314385407

17. Gross Ilectrical Energy Generated (XVH) 876046 2518256 109533664 18.HetIlectricalEnergyGenerated(MVH) 845668 2429604 105043474
19. Unit Service facter 100.0 98.0 77.4 20.UnitAvailabilityfacter 100.0 98.0 77.4 21.UnitCapacityFactcr(UsingMDCNet) 103.3 102.3 74.8
22. Unit Capacity facter (Using DIR Net) 96.3 95.3 72.1 j
23. Unit forced Outage Rate 0.0 2.1 7.3 i 24.ShntdcrnScheduledOverNext6Menths(Type,Date,andturaticaofIach): l None  ;
25. If Shut Down At Ind Of Report Period. Estitated Date of Startup:

l 26.UnitsInTestStatus(PriortoOctaercialC;eratien): Forecast A:hieved i IIITIAL CRITICALITY INITIAL IIICTRICITY CCMMIRCIAL OPIRATION l-

t l

0 PIRATING DATA IIP 017 i D00 KIT B0 50-370 i CIIT McGuira 2 )

DATE April 15. 1998 l COMPLITID BY R.A. Villians  !

?!LIPHONE 704 382-5346 I I l

I N0HTH March. 1998 LQ AVERAGI DAILT POWII LIVIL IAI AVIRAGE DAILY POEIR LIVIL  ;

(NWeNet) (MWe-Net) I i

1 1162 17 1158 -

2 1159 18 1159

)

~

3 1139 19 1160 4 1160 20 1161 j I

5. 1161 21 1161 1 i

6 1160 22 1160 7 535 23 1159 8 1077 24 1158 I

9 1160 25 1161 <

l 1

10 1159 26 1160 l I

11 1160 27 1162 12 1159 28 1162 l 13 1160 29 1161 l 14 1160 30 1162 15 1161 31 1162 l 16 1159 1

e s e sa

. nas e N otn c ms O iae r -

as I tDc u i o T ci o

_ l - C ufL) S

_ z l z E ro R) ui u

_ N t rE1 e N

t sw 3, - snoL6 m E O

_ 0 t /

u noF(1 a V E C

_ 7 d .) Ii 0 S 3 u 1 A e I C tst-

__ v T N N

- w/ atrG -

. 0 t s . I C E O reoE 5 m u x

(

E R I G a e pR I ROR T pneU RTU A teSRN ( t

.EEYE O C L ir i OMTBN CNE U b NAA O NDDH DI OR S N

bPwt i ne h r t el i

h T EP NTT I xonvi x ET TE ACN )EfEEF )E

- KI EL AE E 4 5

- CN LE E V N ( (

OU PT S E I D M U R L O A P C C S m)

U an B ri mca

" aSl B r p 2 ccx

" SiE S t(

N lla

_ O T :aamr I N N duuoe T ) E O onnth C 8 5 NE C haaut

_ U 9 (

OD E tMMAO

_ D 9 PO L e-

- E 1 MC E )M1234 R O 3 h C (

- R c n E r o

- E W a ) SMD D ,i O M 4 YEO E t P (

STC a n

D ,i N E m A S T a NTR x S ENO. E N CEPO _

W H IVEN ) e .

O T LER n s _

u N n i

r O a e) ..

u M - rN l c n a )TD uWX - p ni i S T 3EOFhO/ - x oL a R (MHOSDR E i l T O (t t& p I P ) s c x

_ N E 2 A ee ig E _

U R (REASON rt rn ( _

u ti )

- lr snern

_ N i o eivoi O a Raira .

_ IS Fe rtrl _

TR

_ - c yT aE p .

AU - tngr r x .

RO nanortrE UH

- enitoso(

D melatit pt el a n a r ni n u u ri r e

) o u if ge m eh 1 TYPE F s qa e e pd pt

(

aEMRROAOO e-

)RABCDEFGH 7 2

(

E 3 d T e A - l D 8 du 9 ed ce rh P oc

- FS NO . 1

)FS 1

(

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire Unit 2
2. Scheduled next refueling shutdown: February 1999
3. Scheduled restart following refueling: March 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT.- THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: j_91 9

(b) in the spent fuel pool: 1037

8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date oflast refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: April 15.1998 Name of

Contact:

R, A. Williams Phone: (704)- 382-5346

s ,

DOCKET: 50-370 UNIT: McGuire 2 l

Date: 04/15/98 f

t NARRATIVE

SUMMARY

MONTil: March,1998 McGuire Unit 2 began the month of March operating at 100% full power. The unit began decreasing power j ou 03/06/98 at 2310 and held at 45% power from 03/07/98 at 0444 to 2300 to allow inspection of"2B" j bus line insulation connection. The unit returned to 100% full power on 03/08/98 at 1203 and operated at j or near 100% full power the remainder of the month.

l l

Prepared by: R. A. Williams '

Telephone: (704)-382 5346 l