MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2401998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8201998-06-30030 June 1998 Monthly Operating Repts for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236F0381998-05-31031 May 1998 Monthly Operating Repts for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8251998-05-31031 May 1998 Revised MOR for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247K3851998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for McGuire Nuclear Station ML20247L5981998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0681998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247L6181998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E3991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0811998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1997 for McGuire Nuclear Station,Units 1 & 2 ML20202G7531998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E4111998-01-31031 January 1998 Rev 1 to Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20202G7741997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station,Units 1 & 2 ML20198P2521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station ML20203H6491997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for McGuire Nuclear Station,Units 1 & 2 ML20199D3221997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station ML20203H6601997-10-31031 October 1997 Revised Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station,Units 1 & 2 ML20211P9841997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for McGuire Nuclear Station ML20216K1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for McGuire Nuclear Station,Units 1 & 2 ML20216K1561997-07-31031 July 1997 Revised Monthly Operating Status Rept for Jul 1997 for McGuire Nuclear Station,Units 1 & 2 ML20210L0691997-07-31031 July 1997 Monthly Operating Repts for July 1997 for MNS ML20149F2421997-06-30030 June 1997 Monthly Operating Repts for June 1997 for McGuire Nuclear Station,Units 1 & 2 ML20140H1171997-05-31031 May 1997 Monthly Operating Repts for May 1997 for McGuire Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage ML20151W3521998-09-0808 September 1998 Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236P0451998-07-0808 July 1998 Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days 1999-09-30
[Table view] |
Text
. --. _ - .___ .. .. . .
CPIRATING DATA RIPalf DCCIIT N3 50 369 DATE February 11,1999 CPIRATIN3 STATC! - COMPT! Tit ET R. A. F11Hus TitIPH0XI 704 182-5316 ,
1.Unitlate:M:Gaire1
- 2. Ceperting Pericd: Janary 1,1998 Jutary 31,1998 ,
3.LicensedThe.nlPcver(MVt): 3411
-( Nutplate Rating (Gr:ss MVe): 1305' NctesEateplateRating ! '
- 5. Design Ilectrical Rating (Net MWe): 1180 (Grcss MVe) calculated as .
- 6. Muitu tependable Capacity (Grcss MWe): 1171 145( 000 MVA I .90 power I
- 7. Maxisu Dependable capa:ity (Net MVe): 1100 factorperPage111,-
8.IfChangesOcentincapa:itylatings(ItessXuber3 Thro 1:;h7)Sincetast NUl!30020. f' lepert.GiveReucts:
9.Pcvertevel70Whichtestricted,IfAnyINetMVe):
10, Deann for testrictins. If any:
this Mcath- Tr. to-Date Caulative
- 11. Hars In leporting Period 744.0 744.0 141744,0
- 12. Huber Of Ecurs Reactor Was Critical 7(4.0 744.0 - 103617.1
- 13. Rea:ter Reserve Shutdown Hark 0- --0-- -
14.HursGeneratorCntine 744.0 744.0 102499.0 15,UnitReserveShi.downEcurs ' -
16.G?ossThtraalInergyGenerated(MVH) 1530756 '2330756 324529797 17.GrcssIle:tricalInergyGenerated(NVH) 893719 893719 111491953 10.EttIlectrical1:ergiGenerated(MVH) 863213 863278 106593!80 19.UnitterficeFa:ter 100.0 100.0 72.3 20.UnitAvailabilityit:ter 100.0 100.0 72.3 21.DhitCapacitylatt:r(UsingX;CNet)
. 105.5 105.5 65.7 22.CnitCapacityTa:ter(UsingDIRNet) 58.3 98.3 63.7
- 23. talt yerced Outage late 0.0 0.0 12.2
- 24. Shutd vn Scheduled Cver Next 6 N:nths (Type, tate, and Duratica cf Ia:h):
Refueling - May 29. 1998 - 35 days
- 25. If Shut town At Ind Cf tepart Period. Ist12ated Date of Startu;:
- 26. Units In Test Status (Prior to Cc22er:lal Operaticn): fere:ast A:hjefed-IIITIAt rRITICA!!TY _
'!.!CTRICITT L t OPIIATION 9802200214 980213 PDR ADOCK 05000369 R PDR l
CPIRATIEG IATA IIFCIT DOCKEY 30 50 3!9 UIIT L G'Jite 1 IATI!!bruary 13, 1999 COU L!!!D EY 1,A. E111111s TILIPHONI 704-322 5345 M3 NTH J etary 1999 RI AVIRAGI lAILY PCWIR LIVIL M1 AVIRAGI CAILY POWII LIVIL (NVeXet) (MVe!!t) 1 1160 17 1163 2 1161 18 1164 3 11H 13 1162 4 1162- 20 1162 3 1162 21 1163 6 1161 22 1163 7 11'3 23 1163 1 1164 24 1163 9 1163 25 1164 13 1161 26 1163 11 1162 27 1163 12 1161 23 1154 13 1162 29 1158 14 1161 30 1159 15 1161 31 1162 15 1161 o
UMIT. SHUTDOWNS AND POWER REDUCTIONS DOCKET WO. 50-369 UNIT NAME Mwv1x4 1 DATE vz/13/yu REPORT MONTH January 1998- COMPLETED BY x. a _. williams TELEPHONE tIv41 sez-dsee (1) (2) (3) (4) (5) '
R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (d)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulato n Restriction , ,
4-Other (Explain) File ( M EG-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
L_ _ _ _ _ __
MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: McGuire Unit 1
- 2. Scheduled next refueling shutdown: May 1998
- 3. Scheduled restart following refueling: July 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICA' LION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed smrty questions?
- 5. Scheduled date(s) for submitting proposed licensing action a id supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design c-performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: in (b) in the spent fuel pool: 221
- 8. Present licensed fuel pool capacity: 14Q Size of requested or planned increase: =
- 9. Projected date of last ref : ling which can be accommoda:ed by present license capacity:
November 2005 DUKE POWER COMPANY DATE: February 13.1998 Name r"'ontact: R. A. Williams Phone: (7(m - 382-5346 1
s
DOCKET: 50- 369 UNIT: McGuire 1 Date: 02/13/98 NARRATIVE
SUMMARY
MONTil: January,1998 McGuire Unit i began the month of January operating at 100% full power. The unit operated at or near 100% full power for the entire month.
i I
"1.
Prepared by: R. A. Williams Telephone:(704)- 382-5346
OPitATING DATA !!P0tt ;,
D00K!t NO 50 370 LATI February 13,1998 OPIRATIN STATUS CCIPLETED BT LL Villital-TILIPE;NI 7M 392 5346
- 1. Unit Base: M:311re 2
- 2. Itpcrting Period: January 1,1998 J42tary 31, lill
- 3. l>icessed thersal Pcuer (MVt): 3411
~4.RaseplateRating(GrcssMVe): 1305' Ictes 'Inteplate Ratit; 5.tesignlle:tricallating(EetMVe): 1180 Mrc u MVe) calculated as
- 6. Maila n Depe:dable capacity (Gress MVe): 1171 ' 1450.000 MVA x .90 power
- 7. Muttu tepe:dahlt Capa:lty (Net MVt): 11C0 ft:torperPage111,
- 8. If Ch ngts occur in capa:ity latings (Itess Huhtr 3 Through 7) $!nte Last 3U1130020.
Repert.Givelessosi:
9.Peterle7eltoWhi:hRestricted,IfAny(NetMWe):
10.teasonFertestrie:1 cts,Ifany:
l t
thisMonth Tr. tc-Data Cttulative
- 11. Hours In Reporting Terlod 714.0 744.0 122040.0
-12. Nuber Of Hcurs teacter Was Critical 7H.0 744.0 95390,3
- 13. teactor leserve Shutd:ws Ecurs 0-- --
- 14. H::rs Generater On Line 7H.0 7H.0 94234.6 1
- 15. C:it Reserve Shutden Ecurs - --0 16.GrcssThersalEnergyGenerated(MVH) 2531723 2531723 309175709
- 17. Grcss lle:tri:al ILrgy Generated (MWH) 895142 895112 107910550 18.NetElectri:alInergiGenerated(MVH} 86HH 160H 10308234 19.UnitSerft: eta:ter '100.0 100.0 77.2
- 20. Cait Availability Fa ter 100.0 100.0 77.2
-21.UnitCapacityTa:tcr(UsityMCNet) IC5.6 105.6 74.5 22.UnitCapa:ityfa: tor (UsingttiIet) 99.5 99.5 11.9 23.UnitfcreedOutagelate 0.0 0.0 7.4 24.ShaticusS:heduledOverHextiN:ths(Type,Date,andCuriticscfItch):
None
- 25. If Shut D( n At Ind Of Repcrt Pericd. Istinated Date of Startup:
- 26. U:its In test Status (Prict to Coner:lal CPerati:3): Torecast A:hieved IIITIAL CRITICALITY INITIAL ItICTRICITT COMMIICIAI CPIIATION
~
CPIIA?ING D17A IEFCIT DOCIIT N0 50-370 UIIT McGuire 2 DATE february 13. 1999 COMPLITIDIf P.A. V1111ats TaLIPH N 704 382-5346
'C XORH han try,1998
-81 AVIIAGI CAILY POVII LIVIL M AVIR101 CAILY POVII LIVIL (MVtXtt) (MVeNet) 1 1142 17 1164 2 1153 18 1164 3 1162 ,,,_,,, 19 1154 6 1164 20 '164 1164 21 1164 ;
6 1163 22 1163 7 1164 23 1163 8 1164 _ ' 24 1163 1 1164 25 1164 10 1161 26 ' 1162 11 1163 _ 27 1161 12 1162 .2! 1162 13 1163 29 1161 16 1162 30 1191 15 11!! 31 _ 1161 16 _,, 1163
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NATE Mwy1x4 z DAiE uz/13/su REPORT MONTH January 1998 COMPLETED BY- x. A. williams
( rus)-Juz-das d TELEPHONE (1) (2) (3) (4) (5) -
R MET-E FOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE-O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECUPJtENCE NO SHUTDOWNS OR REDUCTION S i 1
i 1
(1) (2) (3) (4)
F Forced Reason-A-Equi 6 ment Failure (Explain)
Method:
1-Manual Exhibit G - Instructions lj for Preparation of, Data S Scheduled B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event (LER D-Regulato w Restriction 4-Other (Explain) File Report ( M EG-0161))
E-Operator Training & License Examination F-Administrative (5)
G-ODerator Error (Explain) Exhibit I - Same Source H-Other (Explain)
I r
I MONTHLY REFUELING INFORMATION REOUEST 1, Facility name: McGuire Unit 2
- 2. Scheduled next refueling shutdown: February 1999
- 3. Scheduled restart following refueling: March 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reinad design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety ouestions?
- 5. Scheduled date(s) for sub:nisting proposed licensing action and supporting information.
i
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, sign ficant changes in design or new operating procedures).
l l 7, Number of Fuel assemblies (a) '
in the core: 191 l
(b) in the spent fuel pool: 1911
- 8. Present licensed fuel pool capacity: 14.61 Size of requested or planned increase: =
- 9. Projected date of last refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: February 13.1998 Name of
Contact:
R. A. Williams Phone: (7041- 382-5346
_-__ U
4 DOCKET: 50 - 370 UNIT: McGuire 2 Date: 02/13/98 NARRATIVE
SUMMARY
MONTH: January,1998 McGuire Unit 2 began the month of January holding at approximately 98% full power due to nuclear instrumentation calibration. On 01/02/98 at 1105 the unit resume power escalation. The unit returned to 100% full power on 01/02/98 at 1205 and operated at or near 100% full power the remamdct of the month.
3 l
j Prepared by: R. A. Williams Telephone: (704)- 382-5346
-. *