ML20203H649
| ML20203H649 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 11/30/1997 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20203H641 | List: |
| References | |
| NUDOCS 9712190014 | |
| Download: ML20203H649 (10) | |
Text
-
l _
CPIRATII3 EATA !!?0tf DCCIIT 50 50 361 tAttrecetter 15, 1997 (JI DTIVO ffA?r!.
C;KPLif!DBf R.A.Tillists-fil!PHCII 704 312 5346
+
1.UnitItat:N:3 tire 1
- 2. Reperting Period: Novether 1, Ill7 X venbar 30,1917 3.Licensedthirtaltever(MVt):
3411 4.- 3426 plate latist (Grcs: XVt):
1305' I:tts 'Iar Slate latirg
- 5. Design Iltetrical lating (Ett XVi}:
1180 (GressXVt)calculatedas 6.MaxistaCaptadahltcapa:ity(GrossMVt):
1171 1450.C00 MVA I.90 pcuer
- 7. Narinue tapanhhlt Gra:iti (Het XVI):
1129 factorparPage111, I. !! Chan;ts Occur in Capa:ity tatings (Ittas Ruther 3 through 7) Sinto tast IUl!30020.
14p:1. Givt Itascas:
- 9. icuer LeTal Tc Vhich testricted, If Any litt XVc):
10.teasenforlettricticas,Ifani:
ThisX: nth Tr.-to-Date Ctlulative 4
- 11. Hours la taperting Period 720.0 1016.0 140256.0 12.NumberOfH:ursteactorVascritical 720.0 5737.1 102129.1
- 13. tea:ter testrit Shutdown Hants 0--
- 14. Hours Generater On Line 720.0 5619.5 101011.0
- 15. Unit testrit Shuth un Hours 0--
- -0--
16.GrcssthertalIntr;TGenerated(NVH) 2168102 18633714 319453776
- 17. Grcss Ilt:trical Intrgy Generated (KVH) 162589
!(15696 109105815
- 18. Itt Iltetrical Intrqi Generated (MVH) 130586 6143195 104869051
- 11. Unit Servict Facter 100.0 70.1 12.0
- 20. Unit Availability Fa:ter 100.0 70.1 72.0 21.UnitCapa:ity!!: tor (U4'gMDCNet) 102.2 67.1 65.3 22.UnitCapa:ityfactor(UsingtilNet) 97.8 E5.0 63.4 23.Unitfor:tdOutagelate 0.0 2.1 12.3
- 24. $huthvu 5:hthled Over Rett 6 X:nths (Type, Date, and Ouratica cf In:h):
Refueline - May 29. 1998
- 25. If Shut Deva At In$ of lepert Pericd. Istint6d Datt of Startcp:
- 26. Units In test Status (Prict to CO32trelal Operatica):
Fert:ast Achieved III!1AL CliflCAL171 INITIALII'!CTRICI11 CCMX7tCIAL OPIRATION 9712190014 971215 POR ADOCK 05000369 l
R POR i
OPIRATINGIATAIIP0lf DOCIlf 10 50 lil UIIT McGuire 1 Ilf! tecetter 15.1997 COXPLitIDBY f.A. Villit3s i
11LIPH;II 704 3C2 5346 MONTH M:vetter,1997
[11 AVIkAGI LAILT PCEtt LIVIL G1 AVIRAGI IAILY PCVil LIVIL (NVt-Itt)-
(XVeItt) 1 11(9 11 1153 2.
1151 Il 1155 3
1141 li 1155
(
1149 20 1157 5
1141 21 11!6 f
(
1149 22 1156 7
1150 23 illa
.I 1151 21 115) 9 1152 25 1157 10 1151 26 1159 11 1151 27 1157 12 1151 _,
li 1158 13 1151 29 1151 l{
1151 30 1157 15 1154 16 1154
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME Musuint, 1 DATE 12/13/ y i REPORT MONTH November 1997 COMPLETED BY M.
a.
niillams TELEPHONE
(/vs)-362-d34b (1)
(2)
(3)
(4)
(5)
R MET-
~
E HOD T
A OF LICENSE CAUSE AhT CORRECTIVE N
Y S
SHUT EVENT SYS-O P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S I
I l1 (3)
(4)
(1)
(2)
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data F Forced Reason-2-Manual Scram Ent W Sneets For Licensee B-Maintenance or test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Other (Explain)
File (NUREG-0161)
D-Regulatory Restriction E-Operator Training & License Examination (5)
F-Administrative Exhibit I - Same Cource G-Operator Error (Explain) (Explain)
H-Other 1
w-4
- DOCKET: 504 369' L
UNIT: McGuire 1 Date:
12/1$/97 -
t
.g.
NARRATIVE
SUMMARY
MONTH: November,1997
.c
~
McGuire Unit I began the month oi November operating at 100% full power. The unit operated at or near :
. 100% full power for the entire month.
A L
{
?
4 n
1 J
Prepared by: R. A. Williams
. Telephone:(704)- 382 5346 3
?
{}
d-x
.g L
4,
'.4 ' ;
. -... ~,-.
__m MONT11LY REFUELING INFORMATION RFOUEST 1.
Facility name:
McGuire Unit 1 2.
Schedukd next refueling shutdown: May 1998 3.
Scheduled restart following refueling: July 1998 THE PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TliROUGil 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amer.iment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supponing information.
6.
Important licensing considerations (new or difTerent design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core:.LS).
(b) in the spent fu-l pool: 20],
8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
9, Projected date oflast refueling wl..ch can be accommodated by present license capacity:
November 2001 DUKE POWER COMPANY DATE: Dgcember 15.1997 Name of
Contact:
R. A. Williams Phone: (704,._182-5346
CPitA!IEGDATAIIP0tf DOCI!T 30 50 370 CATIrecather 15. 1997 t!!!)TII: iT m'l COMPLIf1D !!
f.A. Villie18
!!LIPHOIE 7H 382 5346 1.CnitItse:McClire2
- 2. Reporting feriod: Rotether 1, Illi tiether 30,1991 3.Licensedthernal?cret(KVt):
3(11 1.Nastplatelating(Grcs:MVe):
1305' Ictes *Itseplate lating
- 5. Design tiectrical lating litet XVe):
1180 (Grcs NYe) calculated as
- 6. Marings Cependable capacity (Grcis Hie):
1111
!(50.000 N/A I.50 pcuer
- 7. Na11833 Cependable Capacity (Eet KVe):
1129 facterperPageill,
- l. !! Chaagts Occar in Capacit; Ratings (Itets Ester 3 Through 1) Sinci.st I 1!G4020.
lepert. s!ve leasene:-
- l. 7ever teiel To Vhien testricted, If Any (Net MVe):
- 10. teason for testricticas, If any:
ThisMenth fr. to Cate Cuaulative
- 11. Durs In leperting Period U.0 8016.0 120552.0
- 12. Esthar Of Ecurs teacher Vas Critical 0.0 5145.2 f(287.8 13.ReactorleserveShutdevnHe"Is 4-4*
4*
- 14. Ecurs Generater Ondire 3.s 5500,6 93176.6
- 15. Unit testrie Shutdcun Hears 4-*
4"
- 16. Grcis Thermal 1tergy Generated (RV3) 0 19325(71 306428311
- 17. Gress Ilectrical Inerg7 Generated (NV5)
D 66(3545 106736580
!!.54tIlectricalInergyGenerated(MWE) 2812 6186125 102355170 19.CaitServicefacter 0.0 73.6 77.3 20.UnitAvailabilityfactor 0.0 73.6 77.1
- 21. Cnit capacity Factor (Usin; X!C N6tl 0.0 10.6 74.6 22.UnitCapacityfacter(Usin;tilNet) 0.0 67.5 72.0 23.CnitforredOktagelate 0.0 10.6 7.5
- 24. Shation Scheduled Over Rett 6 Enths (Type, Date, and Duratics cf Itch):
Current 1v Refueline and Steam Generator Reolacement Outace
- 25. If that Dcus L Ind of taport Period. Estiaated Date of startup: December JJ. 1997
- 26. Units In fest Status (Prior to Ccssercial Operatical:
Torecast Achieved IIITIALCRITICALITY INITIALItICflICIff COMMI1CIAL OPIRATION
[
CFI1ATING IATA RIFCtf DOCIIT Ib 50 370 tIIT M:G21re 1_
Dat!T1: ether 15.ISS_
C0Kil! TID BY 1.A. Villitti TILIPHOII 704 3!2 5316 N0 m F:Vtiler 1997
?!1 AVIRAGI DAlli POV12 LIVIL M
AYIRAGI IAILT POVII LIVII, (MVtNet)
(DtEtt) 1 0
17 0
2 0
18 0
3 0
19 C
4 0
20 0
5 0
21 0
0 0
22 0
7 0
23 0
1 0
It 0
1 0
25 0
to 0
26 0
11 0
27 0
12 0
23 0
43 0
29 0
14 0
30 0
15 0
16 0
(
l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 UNIT NAME-mu2vitst. 4 DATE 12 / Ad/ y /
REPORT MONTH November 1997 COMPLETED BY x.
A.
nilliams TELEPHONE t/ue)-362.wse6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD LICENSE T'
A OF t
N Y.
S SE!5 ~ EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVE'JT RECURRENCE t
4 97 1 S
720.00 C
RC FUELXX END-OF-CYCLE 11 REFUELING OUTAGE AND STEAM GENERATCR REPLACEVENT OUTAGE f
(
(3)
(4)
(1)
(2)
Method:
Exhibit G - Instructions I
F Forced Reason-S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Re rt (LER)
D-Regulatory Restriction 4-Other (Explain)
File (
G-0161)
E-Operator Training & License Examination 1
i F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other l
A---
~,
~
DOCKET: 50 370 UNIT: McGuire 2 Date:
12/15/97 NARRATIVE
SUMMARY
MONTil: November,1997 McGuire Unit 2 began the month of November in end-of-cycle Ii refueling and steam generator replacement outage. The unit was in the refueling and steam generator replacement outage the remainder of the month.
i Prepared by: R. A. Williams Telephone: (704)- 382-5346
l.
MO 'Till,Y REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 2 2.
Scheduled next refueling shusdown: Currently Refueling 3.
Scheduled restest following refueling: Qgeember 1997 Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENLB AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUG!! 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supponing information.
6.
Important licensing considerations (new or different design or supplier, unreview ed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblics (a) in the core: 391 (b) in the spent fuel pool: 1037 8.
l' resent licensed fuel pool capacity: 1463 Size of requested or planned increase: :::
9.
Projected date of last refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: December 15.1997 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
- - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.