Monthly Operating Repts for Aug 1997 for McGuire Nuclear Station,Units 1 & 2
ML20216K130
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/31/1997
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20216K129 List:
References
NUDOCS 9709190026
Download: ML20216K130 (10)


Text

_ - - _ _ _ _ _ - _ - _ _ _

DPERATING DATA REPORT DOCKET NO 50-369 DATE Sentesber 15. i997 OPERAT!ks STATUS COMPLETED BY R.A. Willines TELEPHONE 704-382-5346

1. Unit Nase: McGuire 1
2. Reporting Period August 1, 1997-August 31,1977
8. Licensed Theraal Poser (MWt): 3411
4. Raseplate Rating (6 toss MWe): 1305t Notes tNaseplate Rating
5. Design Electrical Rating (Net MWe):  !!80 (Gross MWe) calculated as
6. Marious Dependable Capacity (6tess MWeli 1171 1450.000 MVA .90 power
7. Maxieue Dependable Capacity (Net NWe):  !!29 factor per Page ill,
8. If Changes Occur in Capacity Ratings (Itees Nueber 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, if Any (Net NWe):

10.ReasonforRestrictions,ifany:

This Month fr.-to-Date Cuealative

!!. Hours In Reporting Period 744.0 5831.0 138071.0

12. Number Of Hours Reactor Was Critical 744,0 3607.5 99999.4
13. F.eactor Reserve Shutdown Hours - --0-- -
16. Hours Ger. orator On-Line 744.0 3491.8 96883.3
15. Unit Reserve Shutdown Hours - --0-- --0--
16. Gross Thersal Energy Generated (NWHI 2529024 11394705 3122!4767
17. Gross Electrical Energy Generated (MWH) 86C277 3904524 107194643
18. Net Electrical Energy Senerated (MWH) 828008 3729209 102455065
19. Unit Service Factor 100.0 59.9 71.6
20. Unit Availability Factor 100.0 59.9 71.6
21. Unit Capacity Factor (Using MDC Net) 98.6 56.7 64.8
22. Unit Capacity factor (Using DER Net) 94.3 54.2 62.9
23. Unit Forced Outage Rate 0.0 1.8 12.5
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each!:

None

25. If Shut Denn At End Of Report Period. Estisated Date of Startup:
25. Units in Test Status (Prior to Cosearcial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9709190026 970915 PDR ADOCK 05000369 R PDR

I B CPERAi!NG DATA REPORT DOCKET NO 50-349

!#ill McGuire !

DATE Sntenber 15. 1997 COMPLETED Bf R.A. Williaes IELEPHONE 706-382-5346 MONTH Awat.1997 L41 AVERABE DAILY PCEER LEVEL E D AVERASE DAILY POWER LEVEL (MWe-Net) (MWe-ht)

I i 17 1120 a 1117 19  !!!2 3 1118 19 1106 4 1116 20 111P 5  !!!3 21 1115 e 1114 22  !!04 7 1117 23 1029 8 1116 24  !!00 9 1120 25 1118 10 1119 24 1117 11 1119 27 1118 12  !!20 29 til9 13 _

!!!! 29 1117 14  !!!5 30 1115 15 1118 31 1117 16 1110

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME ruwyim i DATE vy/13/yi .

REPORT MONTH August 1997 COMPLETED BY K. A. Williams TELEPHONE tius)-Jaz-dage (1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT AC' TION TO

. DATE E HOURS N R/X NO. CODE CODE PREVE177 RECURRENCE NO SHUTDOWNS OR REDUCTION S I

(1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Re rt (LER)

D-Regulatory Restriction 4-Other (Explain) File ( G-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) l 1

. - . ~ ._ _. . , . . _ _ _ _ _ . _ . . _ - . _ _ . - . _ _ . . . . _ _ _ _ _ _ _ . . _ . _ _ _ . _ . .

I t

5 i

i .

i MONTHLY REFUELING INFORMATION REOUEST I

- 1. Facility name: McGuire Unit 1 l

2. Scheduled next refueling shutdown: June 1998 i 3. Scheduled restart following refueling: July 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF
  • l ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. -

l l 4. - Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

L

! If yes,what wiil these be?

F

!. If no, has reload design and core configuration been reviewed by Safety Review Committee j regarding unreviewed safety questions?

) 5. Scheduled date(s) for submitting proposed licensing action and supporting information.

6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

{

1

7. Number of Fuel assemblies (a) in the core: j,92 (b) in the spent fuel pool: 29.l 4 8. Present licensed fuel pool capacity: J4fd, Size of requested or planned increase: ::- *

!- 9. Projected date oflast refueling which can be accommodated by present license capacity:

1 November 2005 i DUKE POWER COMPANY DATE: Scotember 15.1997 i

Name of

Contact:

R. A. Williams Phone: (704)- 382 5346 j

I 4

1 T

DOCKET: 50 369 UNIT: McGuire i Date: 09/15/97 NARRATIVE

SUMMARY

MONTH: August,1997 McGuire Unit I began the month of August operating at 100% full power. The unit operated at or near 100% full power for the entire month.

Prepared by: R. A. Williams Telephone:(704)- 382-5346

OPERATINS DATA REPORT DOCKET NO 50-370 tAir Sectembt 15. 1997 DPERAi!NG STATUS COMPLETED Bt R.A. Willines TELEPHONE 704-382 '346

1. Unit Nase McGuire 2 2.ReportingPeraed: August 1,1997-August 31,1997
3. Licensed flier:41 Power (MWt): 3411
4. Naseplate Rating (Bross M'Jel: 1305s Notes *Waseplate Rating
5. Besign Electrical Rating (Net MWe): 1180 (Gross MWe) calculated at
6. Marious Dependable Capacity (Bross MWel  !!71 1450.000 MVa : .90 poner
7. Maxieus Dependable Capacity (Net Mde): 1129 factor per Page lit,
1. If Changes Occur in Capacity Ratings (itees Nuaber 3 Through 7) Since last NURE6-0020.

Report. Give Reasons:

9. Fever Level Te Whitti Restricted, if Any (Net MWe):
10. Reason For Restrictions, if any This Month fr.-to-Date Cusulative

!!. hours in Reporting Peried 744.0 5831.0 118367.0

12. haber Of Hours Reactor lias Critical 744.0 5242.0 93584.6
13. Reactor Reserve Shutican Hours --0-- --0-- --0--
10. Hours Generator On-line 744.0 5203.3 92479.3
15. Unit Reserve Shutdown Hours --0-- --0-- --0--

16, 6 toss Thermal Energy Generated (MWH) 2526832 16998349 304101259

17. Gross Electrical Energy Genraated (MWH) 851170 5974209 105947244
18. Net Electrical Energy Generated (MWH) 819121 5638649 101606894
19. Unit Service Factor 100.0 89.2 78.1
20. Unit Availability Factor 100.0 89.2 78.1
21. Unit Capacity Factor (Using MDC Net) 97.5 85.7 75.4
02. Unit Capacity Factor (using DER Neti 93.3 82.0 72.8
23. 1; nit Forced Outage Rate 0.0 10.8 7.4
20. Shatdenn Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueline and Steam Generator Replacement - October 02. 1997 - 90 days

25. If Shut Down At End Of Report Period. Estinated Date of Startup:
26. Units In Test Status (Prior to Consercial Operation): Forecast Achieved IN!TIAL CRIT [CAllTY INITIAL ELECTRICITY CCMERCIAL GFERATION

. OPERATIN3 DATA REFORT DOCKET NO 50-370 L*!T McGuge2 DATE Sentenber 15. 1997 COMPLETED B) R.A. Willisei TELEPHONE 704-362-5346 i

GONTH Avaust. 1997 LQ AVERf6E DA!LY POWER LEVEL LAl AVERASE DAILY F0WER LEVEL IMWe-Net) (MWe-Net) 1 1097 17 1103 2 1099 18 1103 3 1101 19 1100 4 1099 20 1105 5 1069 21 1102 6  !!00 22 1099 s

7 1103 23 1100 8 1104 24 1101 9 1105 25 1102 10 1105 26 1101 11  !!06 27 1102 12 1104 23  !!03 13  !!06 29 1101 14 1104 30 1091 15 1103 31 1101 16 1103

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 .

UNIT NAME mwvixe, 2 DATE vy/1d/yi .

REPORT MONTH August 1997 COMPLETED BY x. A. stilliams TELEPHONE tiusJ-Jaz-dsee (1) (2) (3) (4) (5)

R MET- ,

E HOD  ;

T A OF LICENSE '

N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE i O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE t i

NO SHUTDOWNS OR REDUCTION S  ;

i l

r i

f I

t (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions-!

S Scheduled A-Equipment Failure (Explain) 1-Manual- for Preparation of, Data l B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee!

C-Refueling 3-Automatic Scram (LER i D-Regulatory Rgstriction , ,

4-Other (Explain) Event File Report (NUREG-0161)) '

E-@eraQor Training & License Examination  :

F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) ,

k V

i

. ~ .- _ _ _ _ _ . . _ _ _ _ _ . . _ . _ . - .

1 MONTilLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire. Unit 2
2. Scheduled next refueling shutdown: October 1997
3. Schcdu6d restart following refueling: December 1997 Tile PROJECT MANAGER llAS DEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CIIANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN TlilS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

.I If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for subNt:ing proposed licensing action and suppotting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

4

7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 262
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

June 2003 DUKE POWER COMPANY DATE: September 15.1997 Name of

Contact:

R. A. Williams Phone: (704)- 382-53d6

f 4 pipi Ep 11II . ' 4 l DOCKET: 50-370 UNIT: McGuire 2 Date: 09/15/97 NARRATIVE

SUMMARY

MONTH: August,1997 McGuire Unit 2 began the month of August operating at 100% full power. De unit operated at or near 100% fullpower for the entire month.

4 Prepared by: R. A. Williams Telephone: (704)-382 5346