F-l 7

-OPERATING DATA REPORT l-l DOCKET NO 50-369 DATE July 15. 1997 OPEMilN6 STATUS COMPLETED BYL R.A. Willians TELEPHONE 704-382-5346 1.tinitXaee:McGuire!'

2. Reporting Period
June 1, 19??-June 30, 1997 -

J3.' Licensed Thersal Power--(MWti:

3411-

'4. Naseplate Rating (Gross MWe):

1305e Notes eNaseplate Rating

5.' Design Electrical Rating (Net MWe):

1180 (Gross MWe) calculated as

' 6c Manisas Dependable Capacity.(Bross MJe):

!!71 1450.000 MVA x.,0 power

_ 7. Maxisue Dependable Capac_ity (Net NWe).

' !!29 -

' factor per Page lii,

. 8. If Changes Occur'in Capacity Ratings titres Nueber 3 Through 7) Since Last NUREG-0020..

Report. Give Reasons:

L

9. Power Level To Which Restricted,- If Any.(het MWe)
10. Reason for Restrictions,' If.'any This Month Yr.-to-Date-. :Cusulative-cil,HoursinRe,ortingPeriod 720.0-4343.0 -

~136503.01

-12. Number Of Hours Reactor lias Critic'al

.720.0-2119.5

.99511.4:

-13. Reactor Reserve'!butdown Hours ~

'--0--- - -

' - ~

14. Hours Generator On-Line-695.4 2003.8

_97395.3 j

.15.UnitReserveShutdownHours

=- -

--0--

.--0--:

1

16. Bross Therr.at Energy Generated IMWHl.

'2338395-6369650 307189712, j

17. Gross Electrical Energy Generated (MWHI 810539.

2194040 105484159 1

10.HetElectricalEnergyGenerated(MWH) ~

779534-2003131 100808987-

19. Unts Service factor

-96.6 46.1-71.3 80.UnitAvailability7 actor:

.96.6 46.1 71.3

-)

221. Unit Capacity Factor (Using MBC Net)-_

95.9.

42.5 64.5

22. Unit Capacity factor- (Using DER Net) 91.8 -

40.7-62.6

.23. Unit Forced Dutage Rate 3.4 3.0 12.7 1

24. Shutdown Scheduled Dyer Next 6 Months (Type, Date, and Duration of Each):

None PL If Shut Down At End Of Report Period. Estiaated Date of Stetup l

_26. Units In Test States (Prior to Coseercial Operation):

Forecast Achieved-

~!NITIAL CRITICALITY INITIAL ELECTRICITY

-iMERCIALOPERAT!0N i'

9707220107 970715' PDR ADOCK 05000369 R

PDR g

l l'

CPERATING DATA REPORT DOCKET NO 50-369 ilU.T McGuire i DATE July 15. 1997 C0flPLETED Bf R.A. Willises TELEPHONE '704-382-5346 MONTH hoe. 1997 l

L41 AVERAGE DA!LY POWER LEVEL D_A.1 AVERASE DAILY POWER !EVEL

. (Mile-Net!

(MWe-Net)

.I 1144 17

!!45 2

959 18 1147 3

0 19 1142 6

749 20 1139 5

1145 21 1139 l

6 1142 22

!!30 7

1146 23

!!33 8

1147 24 1132

-9 1147 25 1139

. 10 I148 26 1137 1148 27 1131

'12 1152 26 1!27 13 '

1150 29 1133 14 1144 30 1134 15 1139 16

!!42

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369'

UNIT NAME 71wulxs 1 DATE u//1d/3i REPORT MONTH

' June 1997 COMPLETED BY

x. a.

williams TELEPHONE tius1.$s2-d346 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O:

DOWN

-REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE-6-P 97 '6-2 F

A IA XXXXXX HOLDING AT APPROXIMATELY 10% DUE TO INTERMEDIATE RANGE SETPOINT CONCERNS 5

97 3 F

24.60 A

HA TURBIN REPAIR STEAM LEAK ON HIGH PRESSURE TURBINE STATIONARY BLADE GUIDE PINS (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entnr Sheets For Licensee-C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))

D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training.& License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-Operator Error H-Other

_ _ _ =

I L

c.

4

.g MONTHLY REFUELING INFORMATION REOUEST l -

1.

Facility name:

McGuire Unit 1 I

2.

- Scheduled next refueling rhutdown: June 1998

. 3.

Scheduled restart following tefueling: ' July 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF

)

I l

" ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4

'i l-THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

r i:

j' 4.

Will refueling or resumption of operation thereafter require a technical specification change or other licer.se amendment?

l4 If yes, what willthese be?

l It, If no, has reload design and core configuration been reviewed by Safety Review Committee

'g regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

~Important licensing considerations (new or difTerent design or supplier, unreviewed design or '

l

. performance analysis methods, significant changes in design or new operating procedures).

7.

. Number of Fuel assemblies (a).

- in the core: 191 1

9

_(b)

. in the spent fuel pool: 29.1, 8'.

. Present licensed fuel pool capacity: 1461

[

Size of requested or planned increase: : :

l

- 9.

Projected date of last refueling which can be accommodated by present license capacity:

November 2005 '

i L

l

. DUKE POWER COMPANY -

DATE: July 15.1997 l

- Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 i

3 I-

)

jh

+

]:

4; l

I

!?

l

4 a

i DOCKET: 50-369 UNIT: McGuire 1

- Date:

07/15/97-NARRATIVE

SUMMARY

MONTH: June,1997 McGuire Unit I began the month of June operating at 100% full power. On 06/02/97 at 1629 the unit began decreasing power due to steam leak on high pressure turbine stationary blade guide pins. The unit held at approximately 10% power from 06/02/97 at 2225 to 06/03/97 at 0023 due to intermediate range set-point concerns. The unit was taken off line at 06/03/97 at 0124 to repair steam leak on high pressure turbine stationary blade guide pins. The unit returned to service on 06/04/97 at 0200. The unit retumed to t

100% full power on 06/04/97 at 2118 and operated at or near 100% full power the remainder of the month.

1; a

f 4

i

)

i

'h Prepared by: R. A. Williams -

-]

Telephone:(704)-382 5346 I

i 4

.-s4.

. _ -..~

.4

~

na b

y 1

LOPERATINGBATAREPORT L:

+

p r-t..

.t'u 3

DOCKET NO 50-370-

- DATE July -15.1997 -

L l OPERATING STATUS COMPLETED BY ~

P.A. Willians -

i;

._ 7

. TELEPHONE 704-382-5346 L ', ?!. L' nit Haect McGuire 2L b'

!2.ReportingPeriod: June 1,11997-June 30,1997

13. Licensed Thereal Power 1Mt):-

~ 3411

4. Naseplate Rating (6ress We):

- 1305* -

!!stes eNameplace Rating

~

i 3 5. Design Electrical Rating (Net Wel:

ltB0 -

(Bress We) calculated as-

"6. Maximus Dependabli Capacity (Eross We):=.!!71-1450.GJ MVA xl.90 power 7

factor per Page 111,.

5 c Harious Dependable Capacity (Net M e):E '1129 NUREG-0020.1 9.'If. Changes Occur.in Capacity Retings (! tees Number 3 Through 71 Since Last Repart Give Reasons::

9. Power Level To Which Restricted, if Any (Net Me):

-.10.ReasonForRestrictions,ifany*'

' j l'

x ThisMonth Yr.-to-Bate-Cuaulative u i 1

4 g.je.

- g3 3 g.In Peparting Peried'.

720.0-

.4343.0 116879.0 j

m q

Sr 512. Nueter Of Hours Reactor. Was Critical 370,0 3993.0-92335.6

'13. _Reacter Reserve Shtetdown Hours

--0--

- --0--

'l 14.' Hours Seterator On-Line 369.1 3987.1

-91263.2 15ilinit Heservt Shutdown lieurs

--0--

--0

--0---

U R

E144 Gross Thereal Energy 6enerated (MHil 1141152 112909198

'300012108

'l

/17. U.oss Electilcal EnarSy Generated (Nil 394804

_4491763:-

'1045647?8 h

fl9.HetElectricalEnergytenerated(Ni):

371743

_4313627

'100281872

'j L19.2 Un'ltSeriieefactar

'50.6 91.8

.78.1 i

/;n. M20.l 0 nit' Availability Fu. tor.

50.6 91.8 78.1

_l

?2f. thit Capacity Factor:(Using HDC Net) 45.7 88.0-75.3-N

.f$ J 72. Unit Cap?. city factor Wsing DER Net) -

43.8 84.2 72.7

( l2 0 0 alt. Forced Outsge Rate:

49.4 8.2 7.3 l

@~

'24k Shutdenn Scheduled Over Nixt 6 Months (Type, Date, and Duration'of Each):

"Refukling andEsteam'aenerator replacement - September 26, 1997 - 90 days I

25ftfShutloanAtEndOfReportPeriod.EstisatedDateofStartupi 1

!26'. b its In Test Status (Prict to Coseercial Operation):

. Forecast Achieved R'

IETIALCRITICALITY

~

INITIAL ELECTRICITY s

- C0!tMERCIAL OPERATION gm i

1 t

I

9 OPERATING DATA REPORT DOCKET NO 50-370 UNIT' McGuire 2 CATE Julv 15. 1997 COMPLETED BY R,A, Williams TELEPHONE 704-322-5346 NONTH June,1997 i

QE AVERAGE DAILY F0WER LEVEL RR AVERAGEDAILYPOWERLEVEL (MWe-Net)

(HWe-Net) i I

!!41 17 0

E 1139

' 18 0

3 1137 19 0

4 1134 20 0

5

!!35 21 0

6 1133 22 0'

7 1134 23

-O 8

1136 24 0

9 1136 25 0'

10.

1136 26 0

11 -

1137 27 0

12

!!39 28 0

13 1099 29 228 to 25 30 774 0

-16 0

~

+-

7

~1-

. UNIT-. SHUTDOWNS'ANDDPOWER-REDUCTIONS' cDOCKET'NO. ~50-3701 n

l

~. UNIT NAMEi muyuutt; 2

~

. DATE? u titut :s t l'

, COMPLETED-BY:.x.

a.

williams REPORT. MONTH--

June 1997 nTELEPHONEL (tus)-asz-useb

-_ l (1)

(2)

'(3 ).

(4).

'(5)

R MET-E HOD

~

T A'

OF LICENSE.

CAUSE AND CORRECTIVE S

SHUT EVENT--

SYS-N'

-Y

. DURATION

-O-l -E -

HOURS O'

DOWN REPORT TEM COMPONENT

~

ACTION TO P

DATE N

R/X:

NO.

CODE CODE PREVENT. RECURRENCE-1 6-14

'F-

.355.87 A

1 CH HTEXCH STEAM GENERATOR "A"' TUBE LEAK A >-

HH VALVEX-EVALUATE-PACKING 1 LEAK'ON FEEDWATER 6-P

=97 6-29 F

VALVE 2CF-28 1

7-P 97-6-29 F.

~--

A HH VALVEX PACKING ADJUSTMENT'ON FEEDWATER VALVE 2CF-28 s

S 4

l r'

(1)

'(2)

(3)

(4)

F Forced' Reason:

Method:-

Exhibit G - Instructions:

S Scheduled A-Equipment. Failure -(Explain)'

1-Manuali for-. Preparation of Data-

.B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling-3-Automatic Scram Event' Report ~(LER) i D-Regulatory Restriction 4-Other (Explain).

File (NURF-G- 0161)

E-Operator Training & License Examination _

F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain) i i

4 t

t

.c wm w <

I MONTHLY REFUELING INFORMATION REOUEST 1,

- Facility name:. McGuire. Unid

. i 2.

Scheduled next refueling shutdown: Septembe'r 1997

' 3.

Scheduled restart following refueling: December 1997 -

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF

i ANY T.S. CHANGE OR LICENSE AMENDMENT. THE!EFORE, QUESTIONS 4 H

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

'I 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

=

If yes, what will these be?.

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

' 3.

Scheduled date(s) for submitting proposed licensing action and supporting information.

q l'

~. 6.

Important licensing considerations (new or different desigr. or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

- Number of Fuel assemblies (a)-

'in the core: 19),

j 9

(b).

in the spent fuel pool: 969 8.'

Present licensed fuel pool capacityi 1463 Size of requested or planned increase:,-

9.

Projected date oflast refueling which can be accommodated by present license capacity:.

June 2003 a

DUKE POWER COMPANY DATE: July 15.1997 Name of

Contact:

R. A. William?

Phone: 1704) 382-5346 l

4 t-

,e-,

e

}; >

._..._.._4.___.y.,._.

m..

i n

y.

m 4

t

- DOCKET:' 50 - 370.

T-UNIT: McGuire 2

. f Date:

07/15/97:

i NARRATIVE

SUMMARY

a:

MONTH: June,1997 ~

McGuire Unit 2 began the month of June operating at 100% full power, On 06/13/97 at 2020 the unit began decreasing power and was taken off-line 06/14/97 at 0502 to repairateam generator "A" tube leak.

The unit was placed on line 06/29/97 at 0054.- During power escalation, the uiiit held at 47% power from 06/29/97 at 1215 to 1338 to evaluate packing leak on feedwater valve 2CF.28. The unit began decreasing power on 06/29/97 at 1338 and held at 28% power from 06/29/97 at 1602 to 06/30/97 at 0319 due to t

. packing adjustment on feedwater valve 2CF 28. 'ihe unit increased power and held at approximately 98% i power on 06/30/97 at 2045 due to #4 turbine governor valve reaching administrative limit of 60% open.

L

.'The unit operated at or near 98% full power the remainder of the month.

4 2

1 i;

f

)

W Prepared by: R. A; Williams Telephone: (704)- 382-5346 i -

na

,m4I

)

e-.N smo e

a