F-l 7
-OPERATING DATA REPORT l-l DOCKET NO 50-369 DATE July 15. 1997 OPEMilN6 STATUS COMPLETED BYL R.A. Willians TELEPHONE 704-382-5346 1.tinitXaee:McGuire!'
- 2. Reporting Period
- June 1, 19??-June 30, 1997 -
J3.' Licensed Thersal Power--(MWti:
3411-
'4. Naseplate Rating (Gross MWe):
1305e Notes eNaseplate Rating
- 5.' Design Electrical Rating (Net MWe):
1180 (Gross MWe) calculated as
' 6c Manisas Dependable Capacity.(Bross MJe):
!!71 1450.000 MVA x.,0 power
_ 7. Maxisue Dependable Capac_ity (Net NWe).
' !!29 -
' factor per Page lii,
. 8. If Changes Occur'in Capacity Ratings titres Nueber 3 Through 7) Since Last NUREG-0020..
Report. Give Reasons:
L
- 9. Power Level To Which Restricted,- If Any.(het MWe)
- 10. Reason for Restrictions,' If.'any This Month Yr.-to-Date-. :Cusulative-cil,HoursinRe,ortingPeriod 720.0-4343.0 -
~136503.01
-12. Number Of Hours Reactor lias Critic'al
.720.0-2119.5
.99511.4:
-13. Reactor Reserve'!butdown Hours ~
'--0--- - -
' - ~
- 14. Hours Generator On-Line-695.4 2003.8
_97395.3 j
.15.UnitReserveShutdownHours
=- -
--0--
.--0--:
1
- 16. Bross Therr.at Energy Generated IMWHl.
'2338395-6369650 307189712, j
- 17. Gross Electrical Energy Generated (MWHI 810539.
2194040 105484159 1
- 10.HetElectricalEnergyGenerated(MWH) ~
779534-2003131 100808987-
- 19. Unts Service factor
-96.6 46.1-71.3 80.UnitAvailability7 actor:
.96.6 46.1 71.3
-)
221. Unit Capacity Factor (Using MBC Net)-_
95.9.
42.5 64.5
- 22. Unit Capacity factor- (Using DER Net) 91.8 -
40.7-62.6
.23. Unit Forced Dutage Rate 3.4 3.0 12.7 1
- 24. Shutdown Scheduled Dyer Next 6 Months (Type, Date, and Duration of Each):
None PL If Shut Down At End Of Report Period. Estiaated Date of Stetup l
_26. Units In Test States (Prior to Coseercial Operation):
Forecast Achieved-
~!NITIAL CRITICALITY INITIAL ELECTRICITY
-iMERCIALOPERAT!0N i'
9707220107 970715' PDR ADOCK 05000369 R
PDR g
l l'
CPERATING DATA REPORT DOCKET NO 50-369 ilU.T McGuire i DATE July 15. 1997 C0flPLETED Bf R.A. Willises TELEPHONE '704-382-5346 MONTH hoe. 1997 l
L41 AVERAGE DA!LY POWER LEVEL D_A.1 AVERASE DAILY POWER !EVEL
. (Mile-Net!
(MWe-Net)
.I 1144 17
!!45 2
959 18 1147 3
0 19 1142 6
749 20 1139 5
1145 21 1139 l
6 1142 22
!!30 7
1146 23
!!33 8
1147 24 1132
-9 1147 25 1139
. 10 I148 26 1137 1148 27 1131
'12 1152 26 1!27 13 '
1150 29 1133 14 1144 30 1134 15 1139 16
!!42
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369'
- UNIT NAME 71wulxs 1 DATE u//1d/3i REPORT MONTH
' June 1997 COMPLETED BY
- x. a.
williams TELEPHONE tius1.$s2-d346 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O:
DOWN
-REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE-6-P 97 '6-2 F
A IA XXXXXX HOLDING AT APPROXIMATELY 10% DUE TO INTERMEDIATE RANGE SETPOINT CONCERNS 5
97 3 F
24.60 A
HA TURBIN REPAIR STEAM LEAK ON HIGH PRESSURE TURBINE STATIONARY BLADE GUIDE PINS (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entnr Sheets For Licensee-C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training.& License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
_ _ _ =
I L
c.
4
.g MONTHLY REFUELING INFORMATION REOUEST l -
1.
Facility name:
McGuire Unit 1 I
2.
- Scheduled next refueling rhutdown: June 1998
. 3.
Scheduled restart following tefueling: ' July 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF
)
I l
" ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
'i l-THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
r i:
j' 4.
Will refueling or resumption of operation thereafter require a technical specification change or other licer.se amendment?
l4 If yes, what willthese be?
l It, If no, has reload design and core configuration been reviewed by Safety Review Committee
'g regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
~Important licensing considerations (new or difTerent design or supplier, unreviewed design or '
l
. performance analysis methods, significant changes in design or new operating procedures).
7.
. Number of Fuel assemblies (a).
- in the core: 191 1
9
_(b)
. in the spent fuel pool: 29.1, 8'.
. Present licensed fuel pool capacity: 1461
[
Size of requested or planned increase: : :
l
- 9.
Projected date of last refueling which can be accommodated by present license capacity:
November 2005 '
i L
l
. DUKE POWER COMPANY -
DATE: July 15.1997 l
- Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 i
3 I-
)
jh
+
]:
4; l
I
!?
l
4 a
i DOCKET: 50-369 UNIT: McGuire 1
- Date:
07/15/97-NARRATIVE
SUMMARY
MONTH: June,1997 McGuire Unit I began the month of June operating at 100% full power. On 06/02/97 at 1629 the unit began decreasing power due to steam leak on high pressure turbine stationary blade guide pins. The unit held at approximately 10% power from 06/02/97 at 2225 to 06/03/97 at 0023 due to intermediate range set-point concerns. The unit was taken off line at 06/03/97 at 0124 to repair steam leak on high pressure turbine stationary blade guide pins. The unit returned to service on 06/04/97 at 0200. The unit retumed to t
- 100% full power on 06/04/97 at 2118 and operated at or near 100% full power the remainder of the month.
1; a
f 4
i
)
i
'h Prepared by: R. A. Williams -
-]
Telephone:(704)-382 5346 I
i 4
.-s4.
. _ -..~
.4
~
na b
y 1
LOPERATINGBATAREPORT L:
+
p r-t..
.t'u 3
DOCKET NO 50-370-
- DATE July -15.1997 -
L l OPERATING STATUS COMPLETED BY ~
P.A. Willians -
i;
._ 7
. TELEPHONE 704-382-5346 L ', ?!. L' nit Haect McGuire 2L b'
!2.ReportingPeriod: June 1,11997-June 30,1997
- 13. Licensed Thereal Power 1Mt):-
~ 3411
- 4. Naseplate Rating (6ress We):
- 1305* -
!!stes eNameplace Rating
~
i 3 5. Design Electrical Rating (Net Wel:
ltB0 -
(Bress We) calculated as-
"6. Maximus Dependabli Capacity (Eross We):=.!!71-1450.GJ MVA xl.90 power 7
factor per Page 111,.
5 c Harious Dependable Capacity (Net M e):E '1129 NUREG-0020.1 9.'If. Changes Occur.in Capacity Retings (! tees Number 3 Through 71 Since Last Repart Give Reasons::
- 9. Power Level To Which Restricted, if Any (Net Me):
-.10.ReasonForRestrictions,ifany*'
' j l'
x ThisMonth Yr.-to-Bate-Cuaulative u i 1
4 g.je.
- g3 3 g.In Peparting Peried'.
720.0-
.4343.0 116879.0 j
m q
Sr 512. Nueter Of Hours Reactor. Was Critical 370,0 3993.0-92335.6
'13. _Reacter Reserve Shtetdown Hours
--0--
- --0--
'l 14.' Hours Seterator On-Line 369.1 3987.1
-91263.2 15ilinit Heservt Shutdown lieurs
--0--
--0
--0---
U R
E144 Gross Thereal Energy 6enerated (MHil 1141152 112909198
'300012108
'l
/17. U.oss Electilcal EnarSy Generated (Nil 394804
_4491763:-
'1045647?8 h
fl9.HetElectricalEnergytenerated(Ni):
371743
_4313627
'100281872
'j L19.2 Un'ltSeriieefactar
'50.6 91.8
.78.1 i
/;n. M20.l 0 nit' Availability Fu. tor.
50.6 91.8 78.1
_l
?2f. thit Capacity Factor:(Using HDC Net) 45.7 88.0-75.3-N
.f$ J 72. Unit Cap?. city factor Wsing DER Net) -
43.8 84.2 72.7
( l2 0 0 alt. Forced Outsge Rate:
49.4 8.2 7.3 l
@~
'24k Shutdenn Scheduled Over Nixt 6 Months (Type, Date, and Duration'of Each):
"Refukling andEsteam'aenerator replacement - September 26, 1997 - 90 days I
25ftfShutloanAtEndOfReportPeriod.EstisatedDateofStartupi 1
!26'. b its In Test Status (Prict to Coseercial Operation):
. Forecast Achieved R'
IETIALCRITICALITY
~
INITIAL ELECTRICITY s
- C0!tMERCIAL OPERATION gm i
1 t
I
9 OPERATING DATA REPORT DOCKET NO 50-370 UNIT' McGuire 2 CATE Julv 15. 1997 COMPLETED BY R,A, Williams TELEPHONE 704-322-5346 NONTH June,1997 i
QE AVERAGE DAILY F0WER LEVEL RR AVERAGEDAILYPOWERLEVEL (MWe-Net)
(HWe-Net) i I
!!41 17 0
E 1139
' 18 0
3 1137 19 0
4 1134 20 0
5
!!35 21 0
6 1133 22 0'
7 1134 23
-O 8
1136 24 0
9 1136 25 0'
10.
1136 26 0
11 -
1137 27 0
12
!!39 28 0
13 1099 29 228 to 25 30 774 0
-16 0
~
+-
7
~1-
. UNIT-. SHUTDOWNS'ANDDPOWER-REDUCTIONS' cDOCKET'NO. ~50-3701 n
l
~. UNIT NAMEi muyuutt; 2
~
. DATE? u titut :s t l'
, COMPLETED-BY:.x.
a.
williams REPORT. MONTH--
June 1997 nTELEPHONEL (tus)-asz-useb
-_ l (1)
(2)
'(3 ).
(4).
'(5)
R MET-E HOD
~
- T A'
OF LICENSE.
CAUSE AND CORRECTIVE S
SHUT EVENT--
SYS-N'
-Y
. DURATION
-O-l -E -
HOURS O'
DOWN REPORT TEM COMPONENT
~
ACTION TO P
DATE N
R/X:
NO.
CODE CODE PREVENT. RECURRENCE-1 6-14
'F-
.355.87 A
1 CH HTEXCH STEAM GENERATOR "A"' TUBE LEAK A >-
HH VALVEX-EVALUATE-PACKING 1 LEAK'ON FEEDWATER 6-P
=97 6-29 F
VALVE 2CF-28 1
7-P 97-6-29 F.
~--
A HH VALVEX PACKING ADJUSTMENT'ON FEEDWATER VALVE 2CF-28 s
S 4
l r'
(1)
'(2)
(3)
(4)
F Forced' Reason:
Method:-
Exhibit G - Instructions:
S Scheduled A-Equipment. Failure -(Explain)'
1-Manuali for-. Preparation of Data-
.B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling-3-Automatic Scram Event' Report ~(LER) i D-Regulatory Restriction 4-Other (Explain).
File (NURF-G- 0161)
E-Operator Training & License Examination _
F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain) i i
4 t
t
.c wm w <
I MONTHLY REFUELING INFORMATION REOUEST 1,
- Facility name:. McGuire. Unid
. i 2.
Scheduled next refueling shutdown: Septembe'r 1997
' 3.
Scheduled restart following refueling: December 1997 -
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF
- i ANY T.S. CHANGE OR LICENSE AMENDMENT. THE!EFORE, QUESTIONS 4 H
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
'I 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
=
If yes, what will these be?.
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
' 3.
Scheduled date(s) for submitting proposed licensing action and supporting information.
q l'
~. 6.
Important licensing considerations (new or different desigr. or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
- Number of Fuel assemblies (a)-
'in the core: 19),
j 9
(b).
in the spent fuel pool: 969 8.'
Present licensed fuel pool capacityi 1463 Size of requested or planned increase:,-
9.
Projected date oflast refueling which can be accommodated by present license capacity:.
June 2003 a
DUKE POWER COMPANY DATE: July 15.1997 Name of
Contact:
R. A. William?
Phone: 1704) 382-5346 l
4 t-
,e-,
e
}; >
._..._.._4.___.y.,._.
m..
i n
y.
m 4
t
- DOCKET:' 50 - 370.
T-UNIT: McGuire 2
. f Date:
07/15/97:
i NARRATIVE
SUMMARY
a:
MONTH: June,1997 ~
McGuire Unit 2 began the month of June operating at 100% full power, On 06/13/97 at 2020 the unit began decreasing power and was taken off-line 06/14/97 at 0502 to repairateam generator "A" tube leak.
The unit was placed on line 06/29/97 at 0054.- During power escalation, the uiiit held at 47% power from 06/29/97 at 1215 to 1338 to evaluate packing leak on feedwater valve 2CF.28. The unit began decreasing power on 06/29/97 at 1338 and held at 28% power from 06/29/97 at 1602 to 06/30/97 at 0319 due to t
. packing adjustment on feedwater valve 2CF 28. 'ihe unit increased power and held at approximately 98% i power on 06/30/97 at 2045 due to #4 turbine governor valve reaching administrative limit of 60% open.
L
.'The unit operated at or near 98% full power the remainder of the month.
4 2
1 i;
f
)
W Prepared by: R. A; Williams Telephone: (704)- 382-5346 i -