ML20199D322
| ML20199D322 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 10/31/1997 |
| From: | Dimmery T, Robert Williams DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9711200310 | |
| Download: ML20199D322 (13) | |
Text
Duks Power Company A tw favverny EnerrJCenter
=
A la l~w C+4*v PO.lio 1006 Ourlotte, NC 28201 1006 November 14, 1997 U.S Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Subject:
McGuire Nuclear Station Docket No.
50-369 and -370
Dear Sir:
Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of October, 1997.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sin erely,
% ( o?
erry mmery ger Nucle r Business Support Attachment L. A. Reyes, Regional Administrator USNRC, Region II V. Nerses, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin i
{'h-4 f
Nuclear Assuranca Corporation ll s
Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector 9711200310 971031 POR ADOCK 05000369 5U/MSI/Nytgy R
3
.as L-.
---*d---
a--
m 4
4---
4
.u-e A.s 4.
_..+4-A
+d,.+ae4
-at-,-
4J-. Mis.
s
~
i a
5 i
Document Control Desk U.S. NRC McGuire i
a bxc J. M. Davis (ON0lVP)
K. S. Canady (EC08H)
T. E. Mooney. (EC090) '
B. J._Horsley (EC12T)
T. E. Hunter (ON0102)
C.:N. Green (MG010P)
B. W. Walsh (EC11C)
Jeanette Meares (CN020P)
G. A. Copp (EC050)
D. R. Groux (ON01VP)
B. T. Paulkenberry (EC07C)
M. J. Johnson (PB02L)
D. A. Harton (ECOSP)
D. E..Dortz (EC08G)
' Lyn Davis (MG01CP)
M. T. Cash (MG01RC)
J. J. Fisicaro (EC070)
. i W
7' Y
yt--+
1
-7 w.
e,*
,.=*h w
ee-4
4 OP!!ATING IATA !!P017
)
DOCItt 30
!O 361 DAttX0teater 14.1997 0P17171N; !?Att'l CORPitt!D !?
I k. Villitas
!!LIPHOI!
TH 382 5316 S
- l. Crit lase: McGuire 1
- 2. Reprting ieried: Octcher 1, llil 0ctcher 3.,1991 r
- 3. LicenseC ther;al Peve; *Evt):
2(11 Deplattlatlag(CressMVt):
130P pote 'Inseplatelating
..ign Ilt u.; i ' etag (Ett MVt):
1180 (GrcssMWe)calcalPttias 2
f.. Melens Captadeh Cacacity (0,tess Nis,,:
1171 1450.000 NYA I.50 ?cytt 9
- 7. Natista Depandahlt em:U.y (Iet MVt):
1121 fa:ter per Pa;t 111, 3
S If Changes 00:tr in Capacity latings (Ittas Rusber 3 through 7) since last l
EU1!G0020.
Itport. Gire lessent:
- l. Pcuer level to Vhich itstricted, If any (Xat NVe):
- 10. Ration Fct itstricihns, If any:
^
i inis Menth fr. to tite Cuaulative
- 11. H:urs In tercrting Period 745.0 721(.0 139536.0
- 12. Xuther of liours tenter Vas critical H5.0 5017.1 101401.1
- 13. Its:tcr leserve ShrJown H uts 0-0-
0-
- 14. Ecurs Generator Cn Line 145.0 (195.5 100211.0
- 15. Unit tenerve shtdown Hars 0-0- -
16.GrossthernalEnergyGenerated(MV11) 2545651 16165012 316185074
- 17. Grcss Ilectrical Energi Gent!ated (NYH) 181504 5553107 108843.26
- 18. Net Electrical Intrgy Generatti (MVH)
H1793
!112605 10403Hi5
- 19. Unit $trilc4Fa:ter 100.0 67.2 71.9
- 10. M it Availability facter 100.0 67.2 71.9 C
- 21. Unit Capacity f actor (U;, leg MDC Net) 100.8 64.5 65.1 E
22.UnitCaracityfacter(UsingTItXet) 95.4 61.7 61.2
- 23. Unit Fcreed Outag6 tate 0.0 2.4 12.4 24.Shutd:vnScheduledOverNext6Konths(Type,Cate,andturationcfItch):
None 25 If shut Dcun At Ett O!lepert Period. Istinated late of Startup:
- 26. :!ts In Test Status (Prict to Cmercial Operation):
Fere:tst Achieved IIITIALctITICALITY IN!?IAL IthttICITT CONKIRCIALCPIllTICH l
i 0F!!A7153 LAu ?"F3tf DOCIIf l0 50 369 CIIT Menire 1 DATII:verter 14. 1997 b
CON?llt!DIf
- f. A. Villins til!PRI!
704 312 5346 MONTH Otteber,1997 R
M
-AVIRAGI DAIL1 POVII LIVIL M
AVIIAGI DAILY FCVit LIVIL R
(NVeItt)
(NVt4tt) 1 1138 17 1136 2
1139 li till 3
1135 19 1131 kk.5
(
1136 20 11 0 5
1131 11 0 6
1132 22 1142 7
1132 23 1141 8
1131 2(
1143 a
5 1132 25 1145 10 1134 26 1145 11 1,UL,,_
li 11 0 12 1131 28 1145 13 1131 21 11 0 14 1134 30 1143 15 1132 31 11 0 li 1134
.m
' UNIT SHUTDOWNS AND PCWER REDUCTIONS.
DOCKET NO..
50-369
+
U N I T N A M E rr w v i g 1 RD ORT " MONTH October 1937....
DATE-Alfis/yi COMPLETED ~BY
.x.
A.
nil 1iams TELEPHONE.
( i ve ) -s es z - de e d (1) l (2)
(3')
(4)
'(5)
I I
R MET-E HOD T
A OF LICENSE N
-Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE' O
P
' DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE.
NO
' SHUTDOWNS
.OR REDUCTION S g
..: i i
i i
(1)
(2)
(3)
' (4 ).
F Forced Reason-
. Method:
Exhibit G
-Instructions S Scheduled A-Equi.nent Failure. (Explain) 1-Manual EntW Sgaration of Dataeets For Licens for Pre
~
i B-Main enance or test 2-Manual Scram C-Refueling 3-Automa ic Scram rt-(LER Event g G-0161))
D-Regulatory Rgstriction 4-Other Explain).
File.- (
?
E-Operator Training & Lice.nse Examinat1Gn F-Administrative
'(5) i G-Operator Error (Explain)
Exhibit.'I - Same Source.
H-Other (Explain) 3 L.
l i-l L
i d
.- - =
- E
s 4
DOCKET: 50-369 UNIT: McGuire 1 Date:
11/14/97 NARRATIVE
SUMMARY
MONTil: October,1997 McGuire Unit I began the month of Octobes operatlag at 100% full power. The unit operated at or near 100% full power for the entire month.
O Prepared by: R. A Williams Telephcee:(704)-382 5346
f h40NTIILY [tEFUELING INFORM ATlON REOUEST 1.
Facility name:
McGuire Unit 1 2.
Scheduled next refueling shutdown: May 1998 3.
Scheduled restart following tefueling: July 1998 Tile PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGil 6 WILL NO LONGER DE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and cc;e configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performsace analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblics (a) in the core:.L)
(b) in the spent fuel pool: 291 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity:
November 2005 DUKE POWER COMPANY DATE: November 14.1997 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 i
9 6
DillAf!NG OATA LIF017 DOCIIT NO 50 370 DAtt Ecrethr IL 1997 07173f113 ffHt'l C0KPl!T!D BY 1.L Villius TILIPH0KI 704 192 5346
- 1. Unit late: MChire 2
- 2. Peperting I'eriod: Octcher 1, Ill1 Octcher 31, 1997
- 3. Licensed thermal Pcuar (MVt):
3411
- 4. Ruti, late Rating (Grcss XVt):
1305' Inte: 'Intplate lating 5.DesignElectricallating(EttMVt):
11ft (GrcssMVt)calculatedas
- 6. Multus Dependable Cyacity (Grcu MVel:
1171 11 4.000 KVA I.90 pcuer
- 7. Muitu Dependelt Capacity (Ett MVt):
1129 factorperPageill,
- 8. If Changes occar in capacity Ratings (Ittas Ruler 3 !hrough 7) Since last Ut!G0020.
Repcit.Giveteuens:
- 1. ?cret level to Vhich Lestricted, If Any (Vet XVt):
- 10. Itasca !ct testricticas, If any:
=_-
r thisMenth fr. tc Date Cutlative
- 11. Rours In Reporting Period 745.0 7296.0 119832.0
- 12. Ruber Of Har Itacter Vas critical 52.3 5145.2 91'97.8 13.Itactc!teservaShutternEcurs
--0~
~0"
-0~
- 14. Ecurs Generator on Line 52.0 5100.6 93176.6 15.. Unit Reserve Shut b n Ecurs
~0"
~0~
-0~
16.GrcssthersalIntrgyGenerated(NVE) 161797 1?325471 306(28181 17.Grcss11tetricalintrgyOtnerated(MVH) 55044 6663545 106736580
- 18. Ett !!actrical Intr'gy Generated (MVH)
(1578 6389737 102357982
- 19. Unit Service Facter 7.0 10.9 17.8 20.).sitAvultbilityfactor 7.0 50.'
17.8
- 21. Unit Capacity ra: tor (Using MDC set) 5.7 77.6 75.0 22.Unitcapacityfacter(UsingtitXtt) 5.4 7(.2 72.4
- 23. Unit iciced htigt tata 0.0 10.6 7.5 2(. Shutdawn Schthled 0Ter Rett 6 Menths (Type, Date, ud.vatica cf In:h):
-Currentiv Refueling and Steam Generator neolacement Outane
- 25. If $ hut 50Vn At Int Of Report Ptried. Istilated tate of Startup December 18. 1997
- 26. Units In Test Status (Prict to Ccutrelal Operatics):
Ferecast Achieved IIIt!AL CIITICALIff III!IALIIICitICIff CCXXIECIAL OPIRATICH
9 I
OPillflN3 LATA !!P017 DOCIt!10 50 370 UIIT McCaire 2 -
cat!Nevenber 14. 1997 COEPl!?ID If t.1. Villi ns TILIPH0VI 704 312 5346 RONTE Ceteter.1997 M1 AVItAGI CAI!! PCVII !!VIL til-AftlA31 Li1LT PCVit LtitL (XWiIttj (NVtHet) 1 till 17 0
2 1047 18 0
3 0
19 0
4 0
20 0
W 5
0 21 0
6 0
22 0
7 0
23 0
8 0
24 0
5 0
25 v
10 0
26 0
11 0
27 0
12-0 26 13 0
ll 0
14 0
30 0
15 0
ll 0
16 0
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 UNIT NAME Muyulgi, 2 DATE 11/14/>illiams REPORT MONTH October 1997 COMPLETED BY K.
a.
w TELEPHONE t ius i -J u e -d 39 t>
(1)
(2)
(3)
(4) 1 (5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 4
97 3 S
693.03 C
1 RC FUELXX END-OF-CYCLE 11 REFUELING OUTAGE AND STEAM GENERATOR REPLACEMENT OUTAGE l
l l
(1)
(2)
(3)
(4)
Method:
Exhibit G - Instructions F Forced Reason-S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee f
C-Refueling 3-Automatic Scram Event Report (LER) 4-Other (Explain)
File (NUREG-0161)
D-Regu]atory Restriction E-OperaQor Training & License Examination f
F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Sourc2 H-Other (E* plain)
L
DOCKET: 50 370
- UNIT: McGuire 2 Date:
11/14/97 NARRATIVE
SUMMARY
MONTil: October,1997 McGuire thiit 2 began the month of October operating at 100% full power The unit operated at or near 100% full power until 10/02/97 at 1920, when the unit began decreasing power to begin end-ef-cycle 11 refueling and steam generator replacement outage. The unit was taken off-line on 10/03/97 at 0358 for end of-cycle 1I refueling and steam generator replacement outage. The unit was in the outage the remainder of the month.
Prepared by: R. A. Williams Telephone: (704)-382 5346 l
l iii r i
s 1
MON'ULY REFUEL ING INFORM ATION REOUEST 1.
Facility name:
McGuire. Unit 2 2.
Scheduled next refueling shutdown: Cunently Refueline 3.
Scheduled restart following refueling: December 1997 TIIE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT, THEREFORE, QUESTIONS 4 TilROUGil 6 WILL NO LON'iER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereaner require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design end core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing consideratiens (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 1037 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -.-
9.
Prvjected date oflast refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: November 14.1997 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
Mc2'1REINUCLEAR STATION.-
MONTHLY OPERATING STATUS REPORT September 1997 1
-1.
.ersonnel Exposure -
The total station liquid releast for September has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for September has been compared with the Technical Spe.ificatio;3 maximum ainnual dose commitment and was less than 10 percent of this limit.
i
-)