OPERATING DATA REPORT DOCKET NO. 50-369 DATE 06-15-84 CO.\lPLETED BY .T 3 - nnavis TELEPHONE 704-173-7567 OPERATING STATUS l McGuire 1 Notes
- Nameplate Rating
- 1. Unit Name: ~
- 2. Reporting Period: May 1 - May 31_ 1984 (Gross MWe) calculated as 341' 1450.000 MVA x .90 power
- 3. Licensed Thermal Power (SIWt): factor per Page lii,
- 4. Nameplate Rating (Gross SIWE): 1305*
1180 NUREG-0020.
- 5. Design Electrical Rating (Net SlWe):
- 6. Sf aximum Dependable Capacity (Gross SIWE):
- 7. Sfaximum Dependable Capacity (Net SIWE): 11RO 8.- If Changes Occur in Capa:ity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
+
- 9. Power Level To Which Restricted,If Any (Net 51We): None :
- 10. Reasons For Restrictions.If Any:
This alonth Yr..to.Date Cumulative
- 11. Hours In Reporting Period 744.0 3 647.0 21 911.0
- 12. Number Of Hours Reactor Was Critical 680.0 1 975.4 14 048.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 631.0 1 920.4 13 869.5
- 15. Unit Resene Shutdown Hours - -
- 16. Gross Thermal Energy Generated (SlWH) 1 994 665 6 107 355 33 544 424
- 17. Gross Electrical Energy Generated (SlWH) 707 163 2 149 738 11 666 903
- 18. Net Electrical Energy Generated (51WH) 676 878 2 047 652 11 003 907 ,
- 19. Unit Senice Factor 84_8 '52.7 63.3
- 20. Unit Availability Factor 84.8 52.7 63.3
'. 21. Unit Capacity Factor (Using SIDC Net) 77 1 47 6 42.6 ;
l
- 22. Unit Capacity Factor (Using DER Net) 77.1 47.6 42.6
- 23. Unit Forced Outage Rate 1.3 4.7 18.7
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date,and Duration of Each1:
None
- 25. .If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICA LITY INITIAL ELECTRICITY CO\l.\lERCIAL OPERATION (9/77) 8406190178 840531 I PDR ADOCK 05000369 ~
R PDR
r;
-q :
AVERAGE DAILY UNIT POWER LEVEL ,
DOCKET NO. 50-369 UNIT McGuire 1 DATE 6-15-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 i
' MONTH May, 1984
' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t) . (MWe-Net) 1 -
17 1 174 -
2 -
18 1 174 3 -
19 1 176
'4 -
20 1 177 I 5 12 21 1 175
..6 166 22 1 171 ;
'7 531 23 1 065
- 8 896 24 1 165 9 1-111 25 1 166 10 I 164 -26 1 165.
11 'l 174 27 1 163
'12 - 1 175 28 1 161-13- 1 176 29 1 163 14 1 176 30 1 160 15 1 172 31 1 159
-16 1 174 INSTRUCTIONS On this. format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
y .-- -
UNITSilHTDOWNS AND POWI:lt liEI)UCllONS I OCKET NO. En-36K UNIlNAMir McGnira 1 DAIE 6/1E/8A May 1984- COMPLETED pY J . A. Reau.is--- '
It!'POltT AIONTil TELEPliuNE 204-373-7567 n.
E E
, !E 3 $ 5' #d I.icensee ,'j
- r, [*0, C.mse & Conective L. D.H e y, 5g "i .j s 5 firen 3, y 9. ? Atuonso
$5 $ Te i?, g itepini n mL E' o
Peevent Reentrente g
-Q 3A 84-05-01 F 10.25 A -
SF ACCUMU Upper Head Injection Disk Ruptured 3B 84-05-01 S 94.60 C -
RC FUELXX End of Cycle 1 Refueling Outage 4 84-05-05 F 2.68 A 1 HJ VALVEX Reset Moisture Separator Reheater Shell Relief Valve 5 84-05-06 F 5.47 A 1 HJ VALVEX Repair MSR Relief Valve 6-p 84-05-07 F --
B -
RC FUELXX Flux Map 7-p 84-05-08 F --
B -
RC FUELXX Incore & Excore Instrument Calibrations 8-p 84-05-09 F --
B -
RC- FUELXX Flux Map 9-p 84-05-12 F --
A -
PA XXXXXX Loss of Feedwater Pressure to S/G Due to Low Instrument Air Pressure 10-p 84-05-23 F --
A -
CC INSTRU Work on S/G Range Level Channel 1 1 1 2 17: I' meed Itcaum: hiettniil: 1:.sinhii G Insimcenins -
S. Silicif uleil A linjnipment Failure (lixplain) 1 - Alannal l'or Picpasation ol' l).na li.hlaintenance or Test 2 Alannal Scram. 1.niry Slicens l'or 1.icensee C ltel'ncling .l. Automatic Soam. lie .: IteporI (l.l It) l'ile (NLIRIG D Itegul.isory itestsieriini ..l Oilier (lixplain) 01 til i 1:. Ope.atm Training & l.icense lixamination 1 Administi: live 5 G Opciational livror (lispl.nni f.slutut i .Same Somee P8/77) ll.Other (lixplain)
='
DOCKET NO: 50-369 UNIT: McGuire 1 DATE: June 15, 1984 NARRATIVE
SUMMARY
Month:- May 1984 The unit returned to service on May 5th, from its end of Cycle 1 Refueling Outage. Problems with the moisture separator reheater relief valve caused a two-day delay in power escalation testing. The unit was operating at 100". at the end of the month.
er 4
t 1
e f
MONTHLY REFUELLNG LNFORMATION REQUEST
- 1. Facility name: McGuire Unit 1 ,
- 2. Scheduled next-refueling shutdown: March 1985 . :
- 3. Scheduled restart following refueling: May 1985 .
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .
L If yes, what will these be? Technical Specification Revision t
P If no,-has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .
- 5. Scheduled date(s) for submitting proposed licensing action and supporting ,
information: N/A .
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A P
- 7. Number of fuel assemblies (a) in the core: 193 .
(b) in the spent fuel pool: 91 .
- 8. Present licensed fuel pool capacity: 500 .
Size of requested or planned increase: 1463 .
~
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: November 1990 .
Date: June 15, 1984 - .
DUKE POWER COMPANY Name of
Contact:
J. A. Reavis Phone: 704-373-7567 ,
,- - - ., , . - . - - - - - - - - . m,., -- , , - - - - - - - - --- - - - - -
OPERATING DATA REPORT DOCKET NO. 50-370 DATE 06-15-84 COMPLETED BY J.A. Reavis TELEPHONE - 7ma-173-7567 OPERATING STATUS McGuire 2 Notes
- Nameplate Rating
- 1. Unit Name: !
May 1 - May 31, 1984 (cross Mwe) calculated as 2.. Reporting Period: 1450.000 MVA x .90 power-3411 l
- 3. Licensed Thermal Power (MWt): factor per Page lii, t
.,4. Nameplate Rating (Gross MWe). 1305* NUREG-0020,
- 5. Design Electrical Rating (Net MWe): 1180
- 6. Maximum Dependable Capacity (Gross MWe): !
- 7. Maximum Dependable Capacity (Net MWe):
1180 '
- 8. ~ If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
t None i
None
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For' Restrictions,if Any:
7 This Month Yr..to Date - Cumulative
~
- 11. ' Hours In Reporting Period 744.0 2 207.0 ___ 2 207.0 t
- 12. Number Of Hours Reactor Was Critical 641.9- 2 043.3 2 043.3
- 13. Reactor Reserve Shutdown Hours l
- 14. Hours Generator On.Line 637.0 2 029.7 2 029.7 l
- 15. Unit Resene Shutdown Hours - -
l
= 16. Gross Thermal Energy Generated (MWH) 2 131 577 6 740 253 6 740 253 .l
- 17. Gross Electrical Energy Generated (MWH) - 757.383 2 409 181 2 409 181 ,
- 18. Net Electrical Energy Generated (MWH) : 728 697 2 321-390 2 321 390- 'j
- 19. Unit Service Factor 85.6 92.0 92.0 i
- 20. Unit ' Availability Factor - R5.6 92.0 92.0
- 21. Unit Capacity Factor (Using MDC Net) R3 0 R4 1 89 1 7
- 22. Unit Capacit'y Factor (Using DER Net) 83_0 89.1 89.1 ;
- 23. Unit Forced Outage Rate 3.1' 4.3 4.3 t
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1: ,
None i
i
~
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
~ 26'. Units In Test StatuslPrior to Commercial Operation): Forecast Achieved i i
INITIA L CRITICALITY f INITI AL ELECTRICITY :
COMMERCIA L OPERATION !
t N/77) I t
~
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-370 UNIT McGuire 2
'DATE 6-15-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 HONTH -May. 1984-DAY. : AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY. POWER LEVEL (MWe-Net) (MWe-Ne t) ,
'1- 1 166 1 172 17
' s 2 1-166 18 1 171
'3 1 169 19 -1 170 4- -1 174' 20 1 171
- 5.- 1 1'74 -21 ,1,171
- 6'- -1 174-- 22- 1 169 e
'7-1 173 23 1 163 +
8 1 170 24 : 1 171 9- 1 172 25 673 10 616 26 _
, = ,
11 491 -t
~27 -
12 -1 171' 28 -
13 1 172 29 605 h
~
14 1 172' 30 1-160 15 1 173- 31 1 148 11 6 ' -1 164 t
, INSTRUCTIONS .!
On this format,' list the average daily unit power level in MWe-Net for each day-in the;. reporting month. Compute'to the nearest whole megawatt.
v -
~
LINil SiluillOWNS ANI)1 OWlIt Ill:llurilONS DOCKET NO. 50- afo UNIT NAnlE _NcGuira 2 IIA IE T[15/84 CO.\ll'LE1 Ell llY J. A. Reavis -
May 1984 lit:ruiti Alotfill 1 Ell.l*l10NE 704-373-7567
- c. s .?hl.unutSciaan. I:nn3 Slicess l'.n I scenice C f(elucling . .l. Aninnutie Ss e.nn. liccol l(spin s il l'Ill l'ile INiiltl&
I llegul.inin) l(csin. seon .l.Oilie. II. pl.no t 0181I i iIs.ciai.o 18 unnia; .5 i s. s us.- I .s.inini u..n
, l' A.Innnnhauve .i G Opesasion I I n.is ll%pt.nn) II.sliiliii 1 Saine S.unce ll l ll 11 I tilice Ili.splinil
._, ._ . .._ _ , . _ _ ~ ._ - ._ _ _ , . ._ _ _. ,, _ ,
DOCKET No: 50 370 ;
UNIT: McGuire 2 DATE: June 15, 1984 !
l NARRATIVE SUFDIARY r
Month:_ May 1984 ,
i 4
The unit.ran much of the month at 100%. An oscillating feedwater regulating ;
valve caused a unit trip on May 10th. The unit successfully performed their :
Unit Loss of Electrical Load Test on May 25th to satisfy insurance requirements.
Minor maintenance activities then continued through the Memorial Day Weekend.
The unit completed the month at 100%. j f
6 4
l' 9
,_ _ . , , _ _ . _ _ . . . - . _ -r__.
. , ,.__.,.._..-,__..._---..._.._y.. . . _ _ ,%.. .--.,__,,_.-.m.- ,- . - . _ ., . _ , , .
. . MONTHLY REFUELING INFORMATION REQUEST >
t
- 1. Facility name: McGuire Unit 2 ,
2.. Scheduled next- refueling shutdown: February 1985 .
- 3. Scheduled restart following refueling: April 1985 .
i
- 4. Will refueling or resumption of operation thereaf ter require a technical [
specification. change or other license amendment? Yes . !
If yes, what will these be? Technical Specification Revision l
l 1
I i
If no, has reload design and core configuration been reviewed by Safety ;
Review Committee regarding unreviewed safety questions? N/A .
- 5. Scheduled date(s) for submitting proposed licensing action and supporting i information: N/A .
- 6. Important licensing considerations (new or.different design or supplier, unreviewed design or performance analysis methods, significant changes in design ~ or new operating procedures). N/A l e
l i
- 7. Number of fuel assemblies (a) in the core: 193 . l (b) in the spent fuel pool: 0 . f
- 8. .Present licensed fuel pool capacity: 500 .
l Size of requested or planned increase: 1463 . j i
- 9. Projected date of last refueling which can be accommodated by present
~ licensed capacity: May 1993 .
I DUKE POWER COMPANY Date: June 15, 1984 .
Name of
Contact:
J. A. Reavis Phone: 704-373-7567 :
i' l
.- . . - . ~ , , - , . . . , , . . _ . , - - . - - . - , - . . . - - . - . . . .- ,.- - ,, , . - - . . - . - . . . . .
~
McGUIRE NUCLEAR STATION Monthly Operating Status. Report
- 1. Personnel Exposure
- For the month-of April, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
- 2. 'The total station liquid release contribution to whole body dose for
~
' April has been compared with the Technical Specifications annual value of'3 mrem; the total' release for April was less than.10 percent of this limit.'
-The total station gaseous release contribution to any organ dose for-April has been compared with the Technical Specifications annual value
.of 15 mrem; the total release for April was less than 10 percent of.this limit.
- V ,
DUKE POWER GOMPANY P.O. box 3310D CHARLOTTE. N.O. 28242 HALH. TUCKER TELEPHONE vum esmeroeng June 15, 1984 (704) 373-4531
,,,m.,,,_._
/ Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk RE: McGuire Nuclear Station Docket No. 50-369, -370
' s
Dear Sir:
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of May 1984.
Very truly yours, e >
/g l ,
c - --
Hal B. Tucker JAR:scs s/
Attr.hments cc: Regional Administrator Mr. Ralph Birkel U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region 11 U. S. Nuclear Regulatory Commission 101 Mariecta Street, Suite 2900 , Washington, D. C. 20555 Atlanta, Georgia 30323 Mr. Phil Ross American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library MNEB-5715 The Exchange, Suite 245 Washington, D, C. 20555 270 Farmington Avenue
.Farmington, Connecticut 06032
, INPO Becords Center
' Suitd 1500 Senior Resident' Inspector 1100 Circle 75 Parkway McGuire Nuclear Station Atlanta', Georgia' 30339 kh
,i v
r ')
. . . .%