ML20090D529

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for June 1984
ML20090D529
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 06/30/1984
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8407190071
Download: ML20090D529 (13)


Text

r-OPERATING DATA REPORT DOCKET NO. _50-369 DATE 07-13-84 COSIPLETED BY . cr 2 . nnavis TELEPliONE 704-373-7567 OPERATING STATUS McGuire 1 N tes

  • Nameplate Rating
1. Unit Name:

3 Reporting Pen.o. d.

June 1, 1984 - June 30, 1984 (Gross MWe) calculated as 3411 1450.000 MVA x .90 power

3. Licensed Thermal Power (S!Wt):
4. Nameplate Rating (Gross SIWE): 1305 1180 NUREG-0020.
5. Desdn Electrical Rating (Net SIWE):
6. Staxiraum Dependable Capacity (Gross 31We):
7. Slaximem Dependable Capacity (Net 51We): 1180
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:

None

9. Power Level To Which Restricted.lf Any (Net 31We): None
10. Reasons For Restrictions,If Any:

This Stonth Yr. to.Date Cumulativ-

11. Ilours in Reporting Period 720.0 4 367.0 22 631.0
12. Number Of Houn Reactor Was Critical 700.9 2 676.2 14 749.3
13. Reactor Reserve Shutdown liours
14. liours Generator On-Line 699.6 2 620.0 14 569.I
15. Unit Resene Shutdown Hours - -
16. Gross Thermal Energy Generated (ilWil) 2 266 395 8 373 750 35 810 819
17. Gross Electrical Energy Generated ($1Wil) 793 547 2 943 285 12 460 450
18. Net Electrical Energy Generated (31WH) 763 512 2 811 164 11 767 419
19. Unit Service Factor 97.2 60.0 64.4
20. Unit Availability Factor _

97.2 60.0 64.4

21. Unit Capacity Factor (Using 31DC Net) _ _ _ . 89.9 54.6 44.1
22. Unit Capacity Factor (Using DER Net) __ 89.9 54.6 4!. 1
23. Unit Forced Outage Rate 2.8 4.2 18.5
24. Shutdowns Scheduled Over Next 6 Stonths (Type.Date.and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY CO\lNIERCIAL OPERATION 8407190071 840630 yDRADOCK 05000369 (4/77) .

PDR \

IE1N

l AVERAGE DAILY UNIT POWER LEVEL '

DOCKET NO. 50-369 UNIT McGuire 1 DATE 07-13-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH _ Tune 1984 DAY AVERAGE' DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne t) 1 1 160 17 -1 091 2 1 153 18 1 086 3 871- 19 i 097 4 1 160 20 1 100 5 1 163 21 i 102 6 855 22 1 145 7 284 23 1 148 8 1 041 24 '1 148 9- 1 020 25 1 147-

'10 878 26 1 146' 11 1 041 27 1 147 12 1 040 28 1 148 13 1 048 29 1 146

-14 1 103 30 1 146

~15 1 102 31 -

16 1 099 lNSTRUCTIONS.

On this format, list the average daily unit power level ~In MWe-Net for each day in the reporting' month.- Compute 'to the nearest whole megawatt.

I

)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. .S0-369 ^

UNIT NAME McGuire 1 DATE 7/13/84 REPORT MONTH June, 1984 COMPLETED BY J. A. Reavis PAGE 1 of 2 _ TELEPHONE 704-373-7567 "s.

O c gd License y Cause & Corrective S2 "co v5$ = e No. Date ~. %h

$ o-5E 2 pgc

%S$

Event h RB h

8" Action to H e :E m o Report # mu v0 Prevent Recurrence 11-p 84-06-02 S --

A -

IB I.N51RU Trouble Shoot Incore Nuclear Instrunents 12-p 84-06-04 F --

A -

SG BIDWER Both Trains of Control Room Ventilation Inoperable 13-p 84-06-06 F --

H -

RC FUELXX Peaking Factor Problem 14-p 84-06-06 F --

H -

RC FUELXX Axial Flux Difference Limits 6 84-06-06 F .20.42 A 3 EB RELAYX A Feeder Breaker Opened Due to a Faulty' Undervoltage Relay 15-p 84-06-07 F --

H -

RC FUELXX Axial Flux Difference Limits 16 p 84-06-08 F --

A -

RI PLMPXX Heater Drain Pump Tripped on Low Booster Pump Suction Press 17-p 84-06-08 F --

H -

RC FUELXX Axial Flux Difference Limits 18-p 84-06-09 S --

A -

SD PENETR Personnel Airlock Operability Problems 19-p 84-06-10 F --

B -

IB INSTRU Excore Instrunentation Calibrations 20-p 84-06-10 F --

H -

RC FUELXX Axial Flux Difference Limits 21-p 84-06-13 F --

H -

RC FUELXX Axial Flux Difference Limits l' 2 3 4 Reason: Method: Exhibit G - Instructions

'[ ed A-Equipment Failure (Explain)

B-Maintenance or Test 1-Manual 2-Manual Scram for Preparation of Data Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

E-Operator Training G License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

(9/771

UNIT SHUTDOWNS AND POWER REDUCTIONS. DOCKET NO. '50-369- ,

UNIT NAME McGuire 1 DATE 7/13/84 REPORT MONTH June 1984 COMPLETED BY J. A. Reavis PAGE 2 of 2 TELEPHONE 704-373-7567 "s_

o

c. o enj License y Cause & Corrective-

.No.

32 "co m3E

  • 5e 8

.Date ~. %h . 2g Event y, g Action to H

$ m-5E E' zmo a:

%5k EE 83 Report # mu aa Prevent Recurrence 22-p. 84-06-17 F --

A -

111 PLMPXX Repair Heater Drain Pmp 23-p 84-06-17 F --

H -

RC FUELXX Axial Flux Difference Limits 24-p 84-06-18 F ---

A -

III INSTRU Repair Heater Drain Pump Seal Cooling Water Rotometer 25-p 84-06-19 F --

H -

RC FUELXX Axial Flux Difference Limits

,I ,! ,!

-1 2 3 4 Reason: Method: Exhibit G - Instructions

[N led A-Equipnent Failure (Explain)

B-Maintenance or Test 1-Manual 2-Manual Scram for Preparation of Data Entry Sheets for Licensee C-Refueling 3-Autmatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

E-Operator Training 4 License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other-(Explain)

(9/771

.- . . ~ . . . . .. -. - -

)

MONTHLY REFUELING INFORMATION REQb1ST

. 1. Facility name: McGuire Unit 1 ,

l i 2. Scheduled next-refueling shutdown: March 1985 ,

. 3. Scheduled restart following refueling: May 1985 ,

4. Will refueling or resumption of operation thereafter require a technical specification change'or other license amendment? Yes _,

i If yes, what will these be? Technical SDecification Revision ,

\

4 t

1^

o I If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ,

4 Scheduled date(s) for submitting proposed licensing action and supporting 5.

information: N/A ,

6. Important licensing considerations (new or different design or supplier,
unreviewed design or. performance analysis methods, significant changes in design or new operating procedures). N/A 4

r I

1-s

7. Number of fuel assemblies (a) in the core: 193 .

(b) 'in the spent fuel pool: 91 .

l .

8.. Present licensed fuel pool' capacity: 500 .

, Size of requested'or planned increase: 1463 .

9. Projected date of last refueling which can be accommodated by present licensed capacity: November 1990 .

b i DUKE POWER COMPANY Date: July 13, 1984~ .

l Name.of

Contact:

J. A. Reavis Phone: 704-373-7567 l

y -a+, m -e v..<' g s y gg y7 a,p-.%- .-

--g.9 4e-h --7.j .g.y. v. g.g goy.,. .-p. ,- + ,w-

DOCKET No: 50-369 UNIT: McGuire 1 DATE: 7/13/84-NARRATIVE

SUMMARY

Month: June 1984 The unit has experienced peaking factor problems this month following their refueling outage which had limited the unit to 90% power for much of the month. The unit also tripped on June 6 due to a faulty undervoltage relay which caused a Reactor Coolant punp to trip.

, r ,g * .--g , - w- .,i

OPERATING DATA REPORT DOCKET NO. 50-370 DATE 07-13-84 CO31PLETED BY J.A. Reavis TELEPHONE 7ma-173-7567 OPERATING STATUS Mccuire 2 Notes

  • Nameplate Rating
1. Unit Name:
2. Reporting Period: Juna 1. 1984 - Jimo 10. 19gg (Gross MWe) calculated as 3411 1450.000 MVA x .90 power
3. Licensed Thermal Power (SIWt): factor per Page lii,
4. Nameplate Rating (Gross 31We): 1305*

NUEG-0020.

S. Design Electrical Rating (Net 31We): 1180 1

i 6. Maximum Dependable Capacity (Gross MWe):

7. Staximum Dependable Capacity (Net SlWe):

1180

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

t-None None

9. Power Level To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions.lf Any

t This Month Yr..to.Date Cumulative

11. Hours in Reporting Period 720.0 2 927.0 ~.2 927.0

. 12. Number Of Hours Reactor Was Critical 713.5 2 756.8 2 756.8 l 13. Reactor Reserve Shutdown Hours

14. Hours Generator On.Line 711.6 2 741.3 2 741.3
15. Unit Resene Shutdown Hours - -
16. Gross Thermal Energy Generated (MWH) 2 382 476 9 122 729 9 122 729
17. Gross Electrical Energy Generated (MWH) 845 849 3 255 030 3 255 030 IS. Net Electrical Energy Generated (MWH) 816 201 3 137 591 3 137 591
19. Unit Service Factor 98.8 ot7 93.7
20. Unit Availability Factor 98.8 93.7 . 93.7
21. Unit Capacity Factor (Using MDC Net) 96.1 90.8 90.8
22. Unit Capacity Factor (Using DER Net) 96.1 90.8 90.8
23. Unit Forced Ourage Rate 1.2 3.5 3.5
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

Refueling'- January 10, 1985 - 9 Weeks .

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY
CO%INIERCIAL OPERATION (9/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-370 UNIT McGuire 2 DATE 07-13-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH June 1984 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne t) 1 1 165 17 1 111 2 1 174 18 1 168 3 1 170 19 1 166 4 1 172 ,,

20 1 156 5 1 176 21 1 164 6 1 175 22 1 164 7 1 173 23 1 167 8 1 173 24 1 165 9 1 109 25 1 166 10 378 26 1 155 11 1 166 27 1 167 12 1 167 28 1 168 13 1 170 29 1 169 14 1 169 30 1 169 15 1 167 31 -

16 1 050 INSTRUCTIONS Onin the thisreporting format, list the average daily unit power level in MWe-Net for each day month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 -370 UNIT NAME McGuire z-DATE 7h 3/84 REPORT MONTH June 1984 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_

o e t en$ License y Cause & Corrective SO "c u .c a o e No. Date ~. %h 5E g$ ov g

E 31;c

%5$

Event hE3 h

83 Action to a: zmo Report # mu ou Prevent Recurrence 25-p 84-06-01 S --

F -

ZZ ZZZZZZ Dispatch Reduction 26-p 84-06-04 F --

A -

SG BIDWER Both Trains of Control Room Ventilation Inoperabic

~8 84-06-10 F 8.42 A 2 HI VALVEX Repair Steam Generator Blowdown Valve 27-p 84-06-10 F --

A -

III FILTER Change Feedwater Pump Oil Filter 28-p 84-06-15 S --

B -

IB INSTRU Incore/Excore Calibrations 29-p 84-06-20 F --

B -

IB INSIRU Reactor Protection System Calibrations 30-p 84-06-24 F --

A -

IHi PlNPXX Repair Heater Drain Punp 31-p 84-06-26 F --

B -

IB INSTRU Reactor Protection System Channel Functional Test 1 2 3 4 Reason: Method: Exhibit G'- Instructions S led A-Equipment Failure (Explain) 1-Manual- for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

E-Operator Training G License Examination F-Adninistrative 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

L(9/771

.. = _ _..

.I l

- l DOCKET NO: 50-370 UNIT: McGuire 2 DATE: 7/.13/84 NARRATIVE

SUMMARY

Month: June, 1984 The unit operated at 100% most of the month with no major problems.

The unit was removed from service on June 10th to perform repairs on a bad. Steam Generator blow down valve solenoid.

i k

1 4

't 4

r

r:

l MONTHLY REFUELING INFORMATION REQUEST l

1. Facility name: McGuire Unit 2 .

4; 2. Scheduled next refueling shutdown: January 1985 .

3. Scheduled restart following refueling: March 1985 .
4. Will refueling or resumption of operation thereafter require a technical

]' -specification change or other license amendment? Yes .

If yes,-what will these be? Technical Specification Revision i

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting' information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A
7. Number of fuel assemblies-(a) in the core: 193 .

(b) in the spent-fuel pool: 0 .

8. Present licensed fuel pool capacity:. 500 .

Size.of requested or planned increase: 1463 _,.

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

, DUKE POWER COMPANY Date: July 13. 1984 .

Name of

Contact:

J. A. Reavis Phone:- 704-373-7567

McGUIRE NUCLEAR STATION Monthly Operating Status Report

1. Personnel Exposure For the month of May, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2. The total station liquid release contribution to whole body dose for May has been compared with the Technical Specifications annual value of 3 mrem; the total release for May was less than 10 percent of this

' limit.

The total station gaseous release contribution to any organ dose for May has been compared with the Technical Specifications annual value of 15 mrem; the total release for May was less than 10 percent of this limit.

i 1

i

'I

, , . - , , . # -. ., .--., - . _ , . -~~

=4

, :e DUKE POWER GOMPANY P.O. DOK 33180 CHARLOTTE, M.O. 28242 HALH. TUCKER TELEPHONE

= aa

,, L July 13, 1984 (*) ==

rector Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Re: McGuire Nuclear Station Docket No. 50-369, -370

Dear Sir:

Please find attached information concerning the performance and operating status of the-McGuire Nuclear Station for the month of June 1984.

Very truly yours,

%<8. M //w Hal B. Tucker JAR:scs Attachments cc: Regional Administrator Mr. Ralph Birkel U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Washington, D. C. 20555 Atlanta, Georgia 30323 Mr. Phil'Ross American Nuclear Insurera U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library-The Exchange, Suite 245 MNBB-5715 Washington, D. C. 20555 270 Farmington Avenue Farmington, Connecticut 06032 INPO Records Center Suite'1500 M&M Nuclear Consultants 1100 Circle 75 Parkway 1221 Avenue of the Americas Atlanta, Georgia 30339 New York, New York 10020 Senior Resident Inspector McGuire Nuclear Station 1 l

{