Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217G795 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20217F366 | 22 September 1999 | Rev 18 to McGuire Unit 1 Cycle 14 Colr | Boric Acid Shutdown Margin |
ML20212D191 | 20 September 1999 | SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 | |
ML20216E885 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20211B128 | 31 August 1999 | Dynamic Rod Worth Measurement Using Casmo/Simulate | |
ML20217G810 | 31 August 1999 | Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 | |
ML20211G526 | 24 August 1999 | SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 | VT-2 Incorporated by reference Dissimilar Metal Weld |
ML20211F344 | 17 August 1999 | Updated non-proprietary Page 2-4 of TR DPC-NE-2009 | |
ML20210S237 | 31 July 1999 | Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20216E895 | 31 July 1999 | Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20209E436 | 9 July 1999 | SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation | |
ML20196K663 | 7 July 1999 | Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers | |
ML20209H163 | 30 June 1999 | Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20210S249 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20209H173 | 31 May 1999 | Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20206T477 | 31 May 1999 | Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology | Boric Acid Shutdown Margin Loop seal Fuel cladding Coast down Affidavit |
ML20196L188 | 31 May 1999 | Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology | GOTHIC |
ML20195K369 | 31 May 1999 | Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20206N351 | 11 May 1999 | Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs | Stroke time |
ML20195K376 | 30 April 1999 | Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20206R089 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205L234 | 5 April 1999 | SFP Criticality Analysis | |
ML20206R093 | 31 March 1999 | Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205P899 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205C417 | 25 March 1999 | Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed | Safe Shutdown Fire Barrier Emergency Lighting Fire Protection Program Backfit |
ML20207K205 | 5 March 1999 | Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed | |
ML20204C891 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205P902 | 28 February 1999 | Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20204C896 | 31 January 1999 | Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20199E030 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 | |
ML20216F993 | 31 December 1998 | Piedmont Municipal Power Agency 1998 Annual Rept | |
ML20198A448 | 11 December 1998 | Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted | Incorporated by reference |
ML20198D756 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 | |
ML20199E049 | 30 November 1998 | Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure | |
ML20199E965 | 24 November 1998 | Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility | |
ML20196D417 | 24 November 1998 | Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress | Safe Shutdown Fire Barrier Continuous fire watch Fire Protection Program Hourly Fire Watch |
ML20196G058 | 6 November 1998 | Rev 17 to COLR Cycle 13 for McGuire Unit 1 | Boric Acid Shutdown Margin |
ML20196G076 | 6 November 1998 | Rev 15 to COLR Cycle 12 for McGuire Unit 2 | Boric Acid Shutdown Margin |
ML20198D777 | 31 October 1998 | Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 | |
ML20195E596 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 | |
ML20154L625 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 | |
ML20195E602 | 30 September 1998 | Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 | |
ML20154B413 | 22 September 1998 | Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage | Packing leak Hydrostatic Anchor Darling VT-2 Dissimilar Metal Weld Scaffolding |
ML20151W352 | 8 September 1998 | Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc | Fire impairment |
ML20154L632 | 31 August 1998 | Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 | |
ML20153B374 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 | |
ML20236U160 | 31 July 1998 | Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept | Anticipated operational occurrence Fuel cladding |
ML20237B238 | 31 July 1998 | Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 | |
ML20153B393 | 31 July 1998 | Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 | |
ML20236P045 | 8 July 1998 | Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days |