Interim Deficiency Rept Re Westinghouse Centrifugal Charging Pumps at Min Allowable Flow Rate When RCS Reaches Value Below Pressurizer Safety Valve Setpoint Pressure.Initially Reported on 800509.Also Reported Per Part 21
ML20081B244
Person / Time
Site: Marble Hill
Issue date: 10/20/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, S80-13, SVP-0132-83, SVP-132-83, NUDOCS 8310270395
Download: ML20081B244 (2)


Text

-- - . bm8 PUBLIC SERVICE INDIANA S. W. Shields October 20, 1983 senior vice President . S80-13 Nuclear Division SVP-0132-83 Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On May 9,1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc.

(PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). This same item was reported by Westinghouse (letter to Mr. V. Stello of NRC, dated May 8, 1980 ref, no. NS-TMA-2245) under 10 CFR 21. Westinghouse had identified a potential problem in the operation of centrifugal charging pumps (CCPS) at their minimum allowable flow rate when the reactor coolant system reaches a value just below the pressurizer safety valve setpoint pressure, but above the pump shutoff head, during a secondary system high energy line rupture. This situation would have led to a deadhead condition (zero delivered flow) and the potential failure of the CCPS.

PSI has a Westinghouse proposal to provide modifications to the charging pump minimum flow recirculation system. This proposal is based upon the modifications made at Byron Station, the plant which Marble Hill is replicat-ing. Upon PSI's completed evaluation and formalized design changes, PSI will inform you of the changes.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before February 24, 1984. If you have any questions regarding this matter, please contact me at your convenience.

Sincerely, k

0310270395 831020

~

PDR ADOCK 05000546 S. W. Shields S PDR $

SWS/LGY/bak d-gw,/,,

P. O. Box 190, New Washington, Indiana 47162 OCT 2 41983 812. 289 .3000

PUBUC SERVICE Letter: J. G. Keppler October 20, 1983 INDIANA S80-13 SVP-0132-83 cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin J. F. Schapker