Part 21 Rept Re Linear Converter Device W/Possible Generic Defect.Initially Reported on 840116.Written Notifications Issued.Customer Responses Should Be Received by 840331.Final Rept Will Be Submitted by 840430
ML20086L092
Person / Time
Site: Nine Mile Point, Perry, Catawba, Byron, Braidwood, Surry, Clinton, Midland, 05000000, 05000434, 05000435, Marble Hill
Issue date: 01/30/1984
From: Jim Dodson
PACIFIC AIR PRODUCTS CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20086L095 List:
References
REF-PT21-84-120-000 PT21-84-120, PT21-84-120-000, NUDOCS 8402070365
Download: ML20086L092 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

J

)

3133 West Horvord Street . Santo Ano. Cohfornia 92704 . P.O. Box 5277 . Telephone 714/557-1710. Telex No. 67-8319 Janua ry 30, 1984 United States Nuclear Regulatory Commission 1717 H Street NW Washington, D.C. 20555 Attention: Director, Office of Inspection & Enforcement Regarding: Potential 10CFR Part 21 Condition Ge n tl eme n :

Pacific Air Products Co. is presently evaluating the per-formance of the linear converter device under simulated jobsite conditions. The purpose of the evaluation is to determine whether or not a generic defect exists that w uld be reportable under 10CFR Part 21. The steps that we have taken to date are as follows:

1. Telephone notification of our concern was made to NRC Region IV (Dallas) on 1/16/84.
2. Written notification of same was sent to Region IV on 1/17/84. (Copy attached.)
3. Notification of concern is being sent to each utility shown on Attachment "A".

(Copy attached.)

4. Life Cycle Comparison Tests have been run on 1/20/84 through 1/23/84 on two stock uni ts . One original and two copies of the report are attached.

84o2070365 840130 M pg ADOCK 05000280 g

PDR

[d j f [

/

4 (2)

What We Intend To Do Is:

Assimilate and evaluate any jobsite date returne'd to us by our customers to determine if there is a mechanical common denominator or circumstance that may contribute to failure of the linear converter unit.

Evaluate the effects of various lubricants and frequency of maintenance by performing additional tests at Pacific Air Products Co.

Inform customers and the Nuclear Regulatory Commission of test results and conclusion reached.

We anticipate receiving all customer responses by the end of March 1984. Evaluation and correlation with the test data that we are presently generating should be complete by mid April 1984.

A final report and 10CFR Part 21 determination will be issued before the end of April 1984.

Sincerely, PACIFIC AIR PRODUCTS C0.

Z+>44 h James P. Dodson Director of Quality Assurance Enclosures JPD:dg