Interim Deficiency Rept Re Design Changes Not Shown on Detail Drawings Used by Primary Civil Contractor (Newberg-Marble Hill).Initially Reported on 830622.Drawing Review Continuing.Next Rept by 830826
ML20072F404
Person / Time
Site: Marble Hill
Issue date: 06/16/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S82-15, SVP-0101-83, SVP-101-83, NUDOCS 8306270375
Download: ML20072F404 (2)


Text

s PUBLIC SERVICE INDIANA S. W. Shields June 16, 1983 S82-15 Senior Vice President -

SVP-0101-83 Nuclear Division Mr. James G. Keppler, Docket Nos.: STN 50-546 STN 50-547 Regional Administrator U. S. Nuclear Regulatory Commission Construction Permit Nos.:

CPPR - 170 Region III CPPR - 171 799 Roosevelt Road Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On June 22, 1982, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). The primary civil contractor, Newberg-Marble Hill (NMH) was utilizing the structural steel fabricator's detail drawings for erection and inspection of structural steel. This fabri-cator had gone out of business and no longer reviewed the architect-engineer's, Sargent & Lundy, drawings for design changes or conflicts.

The NMH quality assurance program did not provide for this review and the potential therefore exists that a number of design changes may not be shown on detail drawings used by NMH production and inspection personnel to erect structural steel.

The effort of Sargent & Lundy to review the detail drawings against their design drawings is continuing. Upon completion of this review Sargent & Lundy will advise PSI of any changes that might be necessary to bring the previously erected structural steel into conformance with the plant design.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before August 26, 1983. If you have any questions regarding this report, please contact me at your convenience.

Since ely,

^

[S.W. Shields k

0306270375 830616 PDR ADDCK 05000546 S

PDR SWS/LGY/bak 20 E )Q P. O. Box 190, New Washington, Indiana 47162 812. 289.3000 1

j

i SEFMCE

. Letter:. J. G. Keppler June 16, 1983 S82 SVP-0101-83 cc: Director of' Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.