ML20076L653
| ML20076L653 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 07/06/1983 |
| From: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, S83-30, SVP-0105-83, SVP-105-83, NUDOCS 8307190261 | |
| Download: ML20076L653 (1) | |
Text
_
D/nB PUBLIC SERVICE INDIANA July 6, 1983 SVP-0105-83 S. W. Shields S83-30 Senior Vice President -
Nuclear Division Mr. James G. Keppler Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:
Region III CPPR-170 799 Roosevelt Road CPPR-171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2
Dear Mr. Keppler:
On June 7, 1983, Mr. S. J. Brewer of Public Service Company of Indiana, Inc.
(PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). This item pertains to the lack of quality assurance involvement (fabrication inspection) in the fabrication of Seismic Category I HVAC ductwork which does not serve a safety-related function. This lack of involvement is not consistent with PSI's commitment to Regulatory Guide 1.29, Revision 3.
PSI has determined that.had this problem gone uncorrected, the potential exists for a situation to have arisen whereby a safety-related function could have been impaired during a seismic event due to the failure of non-safety-related equipment.
PSI has defined the scope of the problem and is currently working to
~
determine the necessary corrective ac:fon. This letter is intended to fulfill the thirty (30) day reporting requirements of 10 CFR 50.55(e) and is considered to be an interim report. A further report will be filed on or before November 4, 1983.
If you have any questions regarding this matter, please contact me at your convenience.
Sincerely, 8307190261 830706 o
PDR ADOCK 05000546
{/
g PDR p
S. W. Shields SWS/LGY/c1g cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. E. Konklin J. F. Schapker JE 8 1983
-;Cfo/
1 -
P. O. Box 190, New Washington, Indiana 47162 812. 289.3000