ML20081B330

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Welding Techniques Not Covered by QA Program Used in Fabrication of safety-related Switchgear. Initially Reported on 820525.QA Manual Rewritten & Procedures Revised to Include Controls on Welding
ML20081B330
Person / Time
Site: Marble Hill
Issue date: 10/20/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-83-083-000 10CFR-50.55E, PT21-83-083-000, PT21-83-83, S82-12, SVP-0139-83, SVP-139-83, NUDOCS 8310270458
Download: ML20081B330 (2)


Text

.r . ,

AA'8 PUBLIC SERVICE INDIANA S. W. Shields October 20, 1983 Senior Vice President - S82-12 Nuclear Division SVP-0139-83 Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On May 25, 1982, Mr. S. J. Brewer of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). During an audit at Brown-Boveri Electric, Inc. (BBC) facilities PSI quality assurance personnel discovered that welding techniques not covered by BBC's quality assurance program were being used in the fabrication of safety-re'.ated switchgear. Such activ-ities are special processes and should have been controlled by procedure as required by 10 CFR 50, Appendix B, Criterion IX. With these deficiencies it is possible that installed equipment could differ from that used for IEEE 323/344 qualification.

BBC has rewritten part of their Quality Assurance Manual to address

-special processes and bring such activities into compliance with 10 CFR 50, Appendix B. BBC has revised its procedures to include controls on welding activities. Equipment affected by the aforemen-tioned activities has been identified on a nonconformance report.

Further inspections have revealed that certain structural welds on some of this equipment are not specified as to type, configura-tion, and location on the fabrication drawings. BBC has therefore expanded the scope of this nonconformance report. PSI is currently working to address the additional items and ensure appropriate correc-tive action is taken.

This letter is intended to fulfill the requirements of an interim report as required by 10 CFR 50.55(e). A further report on this item will be filed on or before March 2, 1984.

8310270458 831020 gj$

PDR ADOCK 05000546 s 9,41983 P. O. Box 190, New Washington, Indiana 47162 812. 289.3000

77. ' ,

" Letter: J. G. Keppler October 20, 1983 m

S82-12 SVP-0139-83 i

1 If you have any questions regarding thia matter, please-contact me at your convenience. .

Sincerely, f'

0s S. W. Shields SWS/LGY/bak cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin J. F. Schapker f

i i

s#%