Interim Deficiency Rept Re Potential Inadequacy of Southwest Steel Fabricators,Inc QA Program.Initially Reported on 830524.Review of Items Outside Sampling Program Continuing. Next Rept Will Be Submitted by 840113
ML20078A503
Person / Time
Site: Marble Hill
Issue date: 09/16/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S83-28, SVP-0125-83, SVP-125-83, NUDOCS 8309230292
Download: ML20078A503 (2)


Text

.o ,.

Dmo PUBLIC SERVICE INDIANA S. W. Shields September 16, 1983 Senior Vice President . S83-28 Nuclear Division SVP-0125-83 Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On May 24, 1983, Mr. L. G. Yeager of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). An audit of Southwest Steel Fabricators, Inc. (SSF) resulted in a number of findings which indicate that SSF has not adequately implemented their quality assurance program. SSF supplies miscellaneous structural steel for use in safety-related areas. It is conceivable that nonconforming conditions could exist and had they gone uncorrected, could have adversely affected the safe operations of the plant.

SSF has satisfactorily responded to all of the audit findings. Necessary quality program changes have been made and implementation started for future work. A sampling program of previously supplied SSF items verified a high confidence level in the quality of the items already on site. These actions have enabled SSF to restart activities for Marble Hill work. The i review of SSF supplied items outside of the sampling program is continuing.

This letter is intended to fulfill the requirements of an interim report as required by 10 CFR 50.55(e). A further report will be filed on or before January 13, 1984. If you have any questions regarding this matter, please contact me at your convenience.

Sincerely, 8309230292 830916 PDR ADOCK 05000546 S. W. Shields S PDR SWS/LGY/bak /

! SEP 191983 P. O. Box 190, New Washington, Indiana 47162 812. 289 .3000 '/d

SERVICE September 16, 1983 mm Letter: J. G. Keppler S83-28 l_

SVP-0125-83 cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin-

-J. F. Schapker 8

N I