Interim Deficiency Rept Re Welding Techniques Not Covered by Brown-Boveri Electric,Inc QA Program.Initially Reported on 830525.Brown-Boveri Revised Procedures to Include Controls on Welding Activities.Next Rept Expected by 831021
ML20077A827
Person / Time
Site: Marble Hill
Issue date: 07/14/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, SVP-0109-83, SVP-109-83, NUDOCS 8307220460
Download: ML20077A827 (2)


Text

,

-\

+ .

PUBLIC

' SERVICE INDIANA S. W. Shields July 14, 1983 Senior Vice President - S82-12 Nuclear Division - SVP-0109-83 Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPB - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On May 25, 1982, Mr. S. J. Brewer of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). During an audit at Brown-Boveri Electric, Inc. _ (BBC) f acilities PSI quality assurance personnel discovered that welding techniques not covered by BBC's quality assurance program were being used in the fabrication of safety-related switchgear. Such activ-ities are special processes and should have been controlled by procedure as required by 10 CFR 50, Appendix B, Criterion IX. With these deficiencies it is possible that installed equipment could differ from that used for IEEE 323/344 qualification.

BBC has rewritten part of their Quality Assurance Manual to address special processes and bring such activities into compliance with 10 CFR 50, Appendix B. BBC has revised its procedures to include controls on welding activities. Equipment affected by the aforementioned activities has been identified on nonconformance reports. Further inspections have revealed that certain structural welds on some of this equipment are not specified as to type, configuration, and location on the fabrication drawings. Some of the equipment in question has been rejected by PSI. Work by PSI and BBC is continuing in an effort to close out the remaining nonconformance reports.

This letter is intended to fulfill the requirements of an interim report as required by 10 CFR 50.55(e). A further report on this item will be filed on or before October 21, 1983.

s r307220460 830714 &

PDR ADOCK 05000546 7 dg S PDR \

P. O. Box 190, New Washington,in#iana 47162 812. 289 . 3000

. SERVCE INDIANA '-

Letter: - J. G. Keppler - July 14, 1983 S82-12

- SVP-0109-83 4

If you have.any questions regarding this matter, please contact me at your convenience.

J Sincerely,

!/ ..

. W. Shields

!. - -SWS/LGY/bak l

~

cc: Director of Inspection & Enforcement 7 U. .S. Nuclear Regulatory Commission Washington, D. C. 20555