Interim Deficiency Rept Re Inadequate Implementation of QA Program for Electrical contractor,Commonwealth-Lord Joint Venture.Initially Reported on 830211.Only One Original Audit Finding Remains Open.Next Rept Expected by 840120
ML20082B736
Person / Time
Site: Marble Hill
Issue date: 11/10/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S83-03, S83-3, SVP-0158-83, SVP-158-83, NUDOCS 8311210306
Download: ML20082B736 (2)


Text

. . ~ .

. . , A

[

~y PUBLIC SERVICE INDIANA S. W. Shields November 10, 1983 Senior Vice President . S83-03 Nuclear Division SVP-0158-83 Mr. James G. Keppler, Docket Nos.: SIN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

=

Dear Mr. Keppler:

On February 11, 1983, Mr. L. G. Yeager of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). A PSI audit of the site electrical contractc,r, Commonwealth-Lord Joint Venture (CLJV), resulted in a number of findings which indicate that CLJV had not adequately implemented their quality assurance program. It is conceivable that nonconforming conditions could exist and had they gone uncorrected, could have adversely affected .

the safe operations of the plant.

CLJV has addressed the findings of the subject audit. PSI has reviewed and accepted CLJV's disposition of the findings and corrective action has ,

been initiated. During investigation into CLJV's implementation of their quality assurance program, nonconformance reports were written against CLJV to address concerns not covered in the previously mentioned audit. These concerns were added to the original scope of this item. At this time all of these additional concerns have been satisfactorily dispositioned.

Of the original audit findings only one remains open. Upon satisfactory disposition of this finding, PSI will submit a final report.

This letter is intended to fulfill the requirements of an interim report -

as required by 10 CFR 50.55(e). A further report will be filed on or before January 20, 1984. If you have any questions on this matter, please contact me at your convenience.

2 S cerelyj 8311210306 831110 '

PDR ADOCK 05000546 S. Snields I}h S PDR SWS/LGY/bak HOV 15 N P. O. Box 190, New Washington, indiana 47162 812. 289 .3000

.~. . .

E Letter: J. G. Keppler November 10, 1983 S83-03 SVP-0158-83 cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Conunission Washington, D. C. 20555 J. E. Konklin J. F. Schapker r