Final Rept Re Cracks in Welds at Stiffeners to Box Beams. Initially Reported on 830715.Welding Method Modified.Cracked Areas Ground Out & Repaired Using Approved Procedures
ML20080R423
Person / Time
Site: Marble Hill
Issue date: 10/07/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S83-34, SVP-0133-83, SVP-133-83, NUDOCS 8310170530
Download: ML20080R423 (2)


Text

( :.

DA'0 PUBLIC SERVICE INDIANA S. W. Shields October 7, 1983 senior vice President . S83-34 Nuclear Division SVP-0133-83 Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region Ill CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On July 15, 1983, Mr. S. J. Brewer of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). (Cracks in welds at stiffeners to box beams in the Unit 2 containment building were discovered af ter reinspection of the welds. Required visual inspection found the welds acceptable while supplemental magnetic particle examinations detected the cracks.

Since the magnetic particle examinations are not required and are not always performed, it is possible that the cracked welds could have gone undetected. Had this condition gone uncorrected, it could have affected adversely the safety of operations of the plant during a seismic event.

PSI engineering personnel determined that the weld cracking was due to the welding method being used. It was found that increasing the preheat temperature produced sound welds. The welding method was therefore modified for future use. The cracked areas previously identified were ground out and repaired in accordance with approved procedures.

This letter is intended to fulfill the requirements of a final report as required by 10 CFR 50.55(e). If you have any questions regarding this matter, please contact me at your convenience.

Sincerely, ,

+

S. W. Shields SWS/LGY/bak 8310170530 831oo7

.ZEAS10 PDR ADOCK 05000547 007117933 S PDR P. O. Box 190, New Washington, Indiana 47162 812. 289 .3000

.. .. . -. - .. .= . . - . . _ . . . -

i j ,

s

.- October 7, 1983 SERVICE INDIANA . Letter: J. G. Keppler S83-34

SVP-0133-83 cc
Director of Inspection and Enforcement i

U. S. Nuclear Regulatory Cotmnission Washington, D. C. 20555 J. E. Konklin J. F. Schapker 1