ML20011F59722 February 1990Part 21 Rept Re Solder Connections in Abb 27/59 Relays Deteriorated Due to Thermal Stress,Causing Bonding of Printed Wiring Pattern to Glass Epoxy Circuit Board.Interim Circuit Board W/Larger Pads & Higher Wattage Will Be Used
ML20212N13725 August 1986Part 21 Rept Re Potentially Defective Operation of Synchro-Start Products,Inc Synchronizing Speed Switches Used in Auxiliary Generating Equipment.Initally Reported on 860820.Next Rept Will Be Submitted by 860926
ML20151Y8144 February 1986Part 21 Rept Re Colt-Pielstick Engine Tripping Out on High Speed When Started for Test Purposes at Seabrook.Caused by Source of Air Pressure Staying On.Engines Will Be Modified to Positively Vent Air from Rack Boost CylinderSafe Shutdown
Boric Acid
Shutdown Margin
Packing leak
High Radiation Area
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Design basis earthquake
Process Control Program
Stress corrosion cracking
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
Unidentified leakage
Overspeed trip
Eddy-Current Testing
Operational leakage
ML20137W26130 September 1985Update to Part 21 Rept Re Insp for Cracked Welds Discovered in Generator Brackets.Insp for Callaway Unit 1 Postponed Until Next Refueling Outage (Probably Apr 1986).No Cracks Discovered During Insp at Wolf Creek
ML20102C23830 March 1985Site Stabilization Plan for Marble Hill Nuclear Generating Station,Units 1 & 2
ML20100E06529 March 1985Part 21 Rept Re Series of Cracked Welds Discovered in Generators.Welds Occurred in Conical Baffle Section of Coil Guards.All Units Will Be Inspected.Affected Plants Listed
NRC-85-3024, Part 21 Rept Re Possible Undetectable Failures in ESF Actuation Sys.Initially Reported on 791107.Possibility of Undetectable Failures Remain Under Certain Circumstances Despite Change in Hardware22 March 1985Part 21 Rept Re Possible Undetectable Failures in ESF Actuation Sys.Initially Reported on 791107.Possibility of Undetectable Failures Remain Under Certain Circumstances Despite Change in Hardware
ML20084L1158 May 1984Suppl 1 to Part 21 Rept Re United Electric Controls Fuel Oil Filter Differential Pressure Switches at Shoreham Plant. Switch Also Provided to Listed Plants.Corrective Actions Defined in 840328 Rept Will Be Applied
ML20088A62328 March 1984Part 21 Rept Re Abnormal Wear on Linear Converter Units Mfg & Furnished to Power Generating Facilities.Caused by Actuator Hunting.All Customers Provided Field Lubrication Procedure
ML20081C5119 March 1984Part 21 Rept Re Status Update Concerning Abnormal Wear on Linear Converters.Test Program Underway.Results of Investigation Indicate Excessive Wear Caused by Hunting of Control Circuitry
ML20087P7958 March 1984Interim Part 21 Rept Re Linear Converters Furnished by Pacific Air Products.Initially Reported on 840213.Vendor Investigation of Possible Causes of Excessive Wear Underway. Next Rept by 840730
ML20086L09230 January 1984Part 21 Rept Re Linear Converter Device W/Possible Generic Defect.Initially Reported on 840116.Written Notifications Issued.Customer Responses Should Be Received by 840331.Final Rept Will Be Submitted by 840430
ML20086L09817 January 1984Part 21 Rept Re Linear Converter Device W/Possible Generic Defect.Initially Reported on 840116.Preliminary Analysis Indicates Excessive Wear of Brass Shaft Guides.Next Rept Will Be Submitted within 90 Days.Supporting Info EnclBoric Acid
ML20093L33831 December 1983Annual Rept 1983,Public Svc of Indiana
ML20083F82119 December 1983Interim Deficiency Rept Re Diesel Generator Component Support Welds Accepted by Unqualified Inspector.Initially Reported on 831118.Evaluation Continuing.Next Rept Will Be Filed by 840413
ML20083D95616 December 1983Supplemental Final Deficiency Rept Re Potential for Erroneous Steam Generator Level Indications During High Energy Line Breaks Inside Containment.Initially Reported on 800116.Item Not Reportable Under 10CFR50.55(e)
ML20082U8119 December 1983Interim Deficiency Rept Re Inadequate Penetration (Effective Throat) of Flare Bevel Welds.Initially Reported on 830809. Program Being Developed to Address Quality of Past Flare Bevel Welding.Next Rept Expected by 840511
ML20082J79418 November 1983Interim Deficiency Rept Re Use of Incorrect Input Values in Design Calculations.Sargent & Lundy Requested to Perform Addl Work Re Incorrect Thermal & Seismic Header Displacements Used in Subsystem 1CS06
ML20082J34018 November 1983Final Deficiency Rept Re Capstan Spring Malfunction in Pacific Scientific Model PSA-1 & PSA-3 Mechanical Shock Arrestors.Initially Reported on 831021.Shock Arrestors Returned to Pacific Scientific
ML20082B73610 November 1983Interim Deficiency Rept Re Inadequate Implementation of QA Program for Electrical contractor,Commonwealth-Lord Joint Venture.Initially Reported on 830211.Only One Original Audit Finding Remains Open.Next Rept Expected by 840120
ML20081M2043 November 1983Interim Deficiency Rept Re Lack of QA Involvement in Fabrication of HVAC Ductwork Not Serving safety-related Function.Impairment Due to Failure of nonsafety-related Equipment.Next Rept Expected by 840401
ML20081H4803 November 1983Followup to Part 21 Rept Re Potential Failure of Westinghouse Type SA-1 Relays (IE Info Notice 83-63).Addl Potential Problems Discussed in Encl Ltr Re Tantalum Capacitor Leaking Electrolyte.Not Reportable Per Part 21
ML20081G49131 October 1983Interim Deficiency Rept Re safety-related Ductwork Already Installed W/O Engineering Evaluation Necessary to Meet Design Criteria for Seismic Event.Initially Reported on 831003.AE Performing Evaluation.Next Rept by 840309
ML20081H25228 October 1983Final Deficiency Rept Re Design Changes to Structural Steel Fabrication Drawings for Erection & Insp of Structural Steel.Initially Reported on 820622.Drawings Reviewed & Changes Made to Bring Structural Steel Into Conformance
ML20081B33020 October 1983Interim Deficiency Rept Re Welding Techniques Not Covered by QA Program Used in Fabrication of safety-related Switchgear. Initially Reported on 820525.QA Manual Rewritten & Procedures Revised to Include Controls on Welding
ML20081B24420 October 1983Interim Deficiency Rept Re Westinghouse Centrifugal Charging Pumps at Min Allowable Flow Rate When RCS Reaches Value Below Pressurizer Safety Valve Setpoint Pressure.Initially Reported on 800509.Also Reported Per Part 21
ML20085K56613 October 1983Interim Deficiency Rept Re Indications That Pullman Const Industries,Inc Failed to Adequately Implement QA Program. Initially Reported on 830228.Reinsp Continuing.Next Rept Will Be Submitted by 840210
ML20080R4237 October 1983Final Rept Re Cracks in Welds at Stiffeners to Box Beams. Initially Reported on 830715.Welding Method Modified.Cracked Areas Ground Out & Repaired Using Approved Procedures
ML20085L37330 September 1983Independent Const Review of Marble Hill Units 1 & 2, Vol 3, Potential Finding Repts & Corrective Action Plans
ML20085L36530 September 1983Independent Const Review of Marble Hill Units 1 & 2, Vol 2, Program ResultsUltimate heat sink
Nondestructive Examination
Liquid penetrant
ML20085L36030 September 1983Independent Const Review of Marble Hill Units 1 & 2, Vol 1, Executive SummaryUltimate heat sink
Nondestructive Examination
ML20080P17330 September 1983Interim Deficiency Rept Re Potential for Spec/Design Changes to Remain Unincorporated in as-built Configuration of safety-related Equipment or Structures.Initially Reported on 811208.Procedure Changes in Progress.Next Rept by 840217
ML20078A50316 September 1983Interim Deficiency Rept Re Potential Inadequacy of Southwest Steel Fabricators,Inc QA Program.Initially Reported on 830524.Review of Items Outside Sampling Program Continuing. Next Rept Will Be Submitted by 840113
ML20024F45230 August 1983Final Deficiency Rept Re Missing & Deformed Wine Anchors & Cracked Welds Between Plate & Anchor in Primary Shield Wall. Initially Reported on 820818.Alternative Anchorage Sys Installed to Ensure Structural Integrity of Shield Wall
ML20024F49030 August 1983Interim Deficiency Rept Re Inadequate Penetration (Effective Throat) of Flare Bevel Welds.Initially Reported on 830809. Condition May Effect Numerous Cable Tray Supports.Scope & Severity Under Review
ML20024F57230 August 1983Final Deficiency Rept Re Deformed Wire Anchors Separated from Embedded Plate.Initially Reported on 821020.Results of Tests Indicated Cause Due to Axial Tensile Stress Applied to Welds.Item Not Reportable Per 10CFR50.55(e)
ML20076F44017 August 1983Interim Deficiency Rept Re Incorrect Use of Input Valves in Design Calculations.Initially Reported on 830701.Sargent & Lundy Evaluation Underway.Next Rept Will Be Submitted by 831118
ML20076D05416 August 1983Final Deficiency Rept Re Possible Undetectable Failure Mode Existing in Westinghouse Solid State Protection Sys on-line Testing Circuits.Initially Reported on 820805.New Design Eliminates Problems
ML20076C18415 August 1983Interim Deficiency Rept Re Cracks in Welds at Stiffeners to Box Beams in Containment Bldg.Initially Reported on 830715.Cause Under Investigation.Next Rept Will Be Submitted by 831007
ML20077H6883 August 1983Interim Deficiency Rept Re Inadequate Implementation of Commonwealth-Lord Joint Venture (Cljv) QA Program.Initially Reported on 830211.CLJV Disposition of Findings & Corrective Action Initiated.Next Rept by 831111
ML20024D60829 July 1983Interim Deficiency Rept Re Incorrect Output Values in Design Calculations W/Potential to Decrease Allowable Stresses in Some Piping Subsystems.Sargent & Lundy Reviewing Stress Repts for Design Inconsistencies.Next Rept by 831118
ML20080B49529 July 1983Nonproprietary Version of Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & E Steam GeneratorsOperating Basis Earthquake
Nondestructive Examination
Stress corrosion cracking
Eddy Current Testing
Flow Induced Vibration
Water hammer
ML20077G44322 July 1983Interim Deficiency Rept Re Audit Findings Showing That Pullman Const Industries,Inc Inadequately Implemented QA Program.Initially Reported on 830228.Work on Corrective Actions Continuing.Next Rept by 831014
ML20077A82714 July 1983Interim Deficiency Rept Re Welding Techniques Not Covered by Brown-Boveri Electric,Inc QA Program.Initially Reported on 830525.Brown-Boveri Revised Procedures to Include Controls on Welding Activities.Next Rept Expected by 831021
ML20077K92514 July 1983Annual Financial Rept 1982
ML20077A91213 July 1983Interim Deficiency Rept Re Six Sheared Pinion Keys in Limitorque Model SB-O Valve Motor Operators Installed by Westinghouse.Initially Reported on 820805.Item Not Reportable Per 10CFR50.55(e)
ML20076L6536 July 1983Interim Deficiency Rept Re Lack of QA Involvement in Fabrication of Seismic Category I HVAC Duct Work Not Serving safety-related Function.Initially Reported on 830607.Next Rept Expected by 831104
ML20024B74630 June 1983Final Deficiency Rept Re Heat Sink Failures on Loop Power Supply Cards & Contact Bounce in Mercury Relay Utilized on Temp Channel Test Cards of Westinghouse 7300 Process Protection Sys.Initially Reported on 830603
ML20085A21622 June 1983Interim Deficiency Rept Re Possible Southwest Steel Fabricator Nonconforming QA Program for Structural Steel Used in safety-related Areas.Initially Reported on 830524. Review Continuing.Next Rept Due by 830916
ML20072F40416 June 1983Interim Deficiency Rept Re Design Changes Not Shown on Detail Drawings Used by Primary Civil Contractor (Newberg-Marble Hill).Initially Reported on 830622.Drawing Review Continuing.Next Rept by 830826