Interim Deficiency Rept Re Lack of QA Involvement in Fabrication of HVAC Ductwork Not Serving safety-related Function.Impairment Due to Failure of nonsafety-related Equipment.Next Rept Expected by 840401
ML20081M204
Person / Time
Site: Marble Hill
Issue date: 11/03/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S83-30, SVP-0156-83, SVP-156-83, NUDOCS 8311170137
Download: ML20081M204 (2)


Text

c .

3.-

0Aih PUBLIC SERVICE INDIANA S. W. Shields November 3, 1983 Senior Vice President - S83-30 Nuclear Division SVP-0156-83 t.

Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Reed CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On June 7,1983, Mr. S. J. Brewer of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e) . This item pertains to the lack of quality assurance involvement (f abrication inspection) in the fabrication of Seismic Categorv I HVAC ductwork which does not serve a safety-related function. This lack of involvement is not consistent with PSI's commitment to Regulatory Guide 1.29, Revision 3. PSI has determined that had this problem gone uncorrected, the potential exists for a situation to have arisen whereby a safety-related function could have been impaired during a seismic event due to the failure of non-safety-related equipment.

PSI has defined the scope of the problem and is currently working to determine the necessary corrective action. To date, PSI has initiated changes to contractor specifications, the Project Quality Assurance Manual, and applicable contractor procedures to further implement PSI's commitment to Regulatory Guide 1.29, Revision 3.

This letter is intended to fulfill the requirements of an interim report as required by 10 CFR 50.55(e). A further report will be filed on or before April 6,1984. If you have any questions regarding this matter, please contact me at your convenience.

Sine rely,

/

8311170137 031103 / . /. A PDR ADOCK 05000546 s PDR -

SWS/LGY/bak NOV 7 1!83 f

IM7 f D P. O. Box 190, New Washington, Indiana 47162 812. 289 .30

SEmnCE . .

November.3, 1983 mIDIANA ~ Letter: -J. G. Keppler S83-30

'SVP-0156-83 cc: Director ~ of Inspection and Enforcement U. S. Nuclear Regulatory Conunission Washington, D. C. 20555

J. E. Konklin

' J. F. Schapker I