Final Deficiency Rept Re Design Changes to Structural Steel Fabrication Drawings for Erection & Insp of Structural Steel.Initially Reported on 820622.Drawings Reviewed & Changes Made to Bring Structural Steel Into Conformance
ML20081H252
Person / Time
Site: Marble Hill
Issue date: 10/28/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S82-15, S83-15, SVP-0154-83, SVP-154-83, NUDOCS 8311070368
Download: ML20081H252 (2)


Text

,

/d PUBLIC SERVICE INDIANA S. W. Shields October 28, 1983 Senior Vice President . S82-15 Nuclear Division SVP-0154-83 Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On June 22, 1982, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e) . The primary civil contractor, Newberg-Marble Hill (NMH) was utilizing the structural steel fabricator's detail drawhgs for erection and inspection of structural steel. This fabri-cator had gone out of business and no longer reviewed the architect engineer's, Sargent & Lundy (S&L), drawings for design changes or conflicts.

The NMH quality assurance program did not provide for this review and the potential therefore exists that a number of design changes may not be shown on detail drawings used by NMH production and inspection personnel to erect structural steel.

To determine the acceptability of the structural steel in question, Sargent & Lundy reviewed the detail drawings against their design drawings and advised PSI of changes that were necessary to bring the erected structural steel into conformance with the plant design.

To ensure that future erection and inspection is performed in an acceptable manner, applicable NMH procedures have been revised to require the use of Sargent & Lundy design drawings in conjunction with fabricator structural steel detail drawings for erection and inspection of structural steel. Also, PSI has selected another contractor to assume the responsibilities of the fabricator who has gone out of business. This new contractor is now responsible for reviewing Sargent & Lundy drawings for design changes or conflicts with fabricator drawings.

8311070368 831028 1 D PDR ADOCK 05000546 s PDR 2 1983 NOV P. O. Box 190, New Washington, Indiana 47162 812. 289 . 3000

PUBUC SERVICE INDIANA Letter: J. G. Keppler S82-15 SVP-0154-83 This letter is intended to fulfill the requirements of a final report as defined in 10 CFR 50.55(e). If you have any questions regarding this report, please contact me at your convenience.

Since3ely, '

-/

i ', .d

. W. Shields SWS/LGY/bak cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Comnission Washington, D. C. 20555 J. E. Konklin J. F. Schapker