ML20079J572

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Approval of Disposition of Contractor Nonconformance Rept W/O Design Subcontractor Review of Equipment.Initially Reported on 820811.Action to Redisposition Rept Taken.Next Rept Expected by 830218
ML20079J572
Person / Time
Site: Marble Hill
Issue date: 12/20/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S82-20, SVP-0062-82, SVP-62-82, NUDOCS 8212280272
Download: ML20079J572 (2)


Text

-

PUBLIC SERVICE INDIANA S. W. Shields December 20, 1982 senior vice President - S82-20 Nuchar Division SVP-0062-82 Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On August 11, 1982, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). Contrary to procedure, the disposition of a contractor nonconformance report (NCR) was approved without design subcontractor review of the affected equipment. The subject NCR had been written to document removal of seismic uplift restraints from the containment polar crane due to an installation inte*:ference. Furthermore, the disposition of this NCR did not prescribe corrective action to reattach the restraints after in-stallation was complete.

PSI Quality Assurance personnel have documented thit, item on a corrective action request and have initiated action to reopen and redisposition the contractor NCR. A review of similar NCR's which may have been dispositioned without appropriate design subcontractor review will also be initiated.

This letter is intended to fulfill the requirements of an interim report as required by 10 CFR 50.55(e). A further report will be filed on or before February 18, 1983. If you have any questions regarding this matter, please contact me at your convenience.

Since ely,

~

~

i 8215280272 BEi220 DR ADOCK 05000546 . W. Shields PDR SWS/LGY/bak P. O. Box 190, New Washington, Indiana 47162 812. 289.3000 2 682

SERVICE

" " Letter: J. G. Keppler December 20, 1982 S82-20 SVP-0062-82 cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin J. J. Harrison J