NPDES Noncompliance Notification:Discharge of Total Residual Chlorine from Outfall 3IB00016004,discharge Tunnel on 950210.Caused by Mispositioned Switch.Anticipated Time Exceedance Expected to Continue
ML20078Q385
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/13/1995
From: Shelton D
CENTERIOR ENERGY
To: Hall B
OHIO, STATE OF
References
PY-CEI-OEPA-021, PY-CEI-OEPA-21, NUDOCS 9502210227
Download: ML20078Q385 (2)


Text

I l

0 h CENTERCOR ENERGY W

PERRY NUCLEAR POWER PLANT Mail Address: Donald C. Shelton P SENIOR VICE PRESIDENT 10 CENTER ROAD P RR , O 10 44081 PERRY, OHIO 44081 NUCLEAR (216) 259 3737 February 13, 1995 PY-CEI/0 EPA-0214L Brian Hall Ohio EPA Northeast District Office ,

2110 E. Aurora Rd.

Twinsburg, Ohio 44087 Perry Nuclear Power Plant ,

OEPA Permit No. 3IB00016DD

Dear Mr. Hall,

In accordance with Part III, Section 12.c of the Permit, this letter is serving as confirmation of a telephone report of an effluent limitation exceedance made to the State Emergency Response Commission on 2/10/95.

1. The limitation which has been exceeded: The time limit (tvo hours) for discharge of total residual chlorine (TRC) from outfall 3IB00016004, the discharge tunnel. Free available chlorine was measured at 0.0 ppm at the final discharge point near the end of the event.
2. The extent of the exceedance: A two hour and fifteen minute discharge of TRC resulting from approximately 2 gpm of 0.8% sodium hypochlorite entering the plant service water system.
3. The cause of the exceedance: A mispositioned switch ("on" vs.

" auto").

4. The period of exceedance: From 2135 to 2350 on 2/9/95.
5. The anticipated time the exceedance is expected to continue: The release was stopped at 2350 on 2/9/95.

21000J operonna ccmpon.es cieveiona Decmc in um>ncong 9502210227 950213 ,

)

ic'ecoto w PDR ADOCK 05000440 I ' []

S PDR

o l

o i PY-CEI/0 EPA-0214L February 13, 1995 Page 2 of 2

6. Steps being taken to reduce, eliminate and/or prevent recurrence of the exceedance: A Human Performance Enhancement System evaluation is being conducted along with a detailed investigation. The results of both evaluations vill be used to determine specific actions necessary to prevent recurrence.

If you have questions or require additional information, please contact Louise Barton at (216) 280-5512.

Sincerely, f) / ) /

f w f/

g> yDon'a'id C. Shelton LKB:sc cc: NRC Project Manager NRC Resident Inspector NRC Document Control Desk NRC Region III