ML20249A195

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results for Apr 1998, for Pnpp
ML20249A195
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/30/1998
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20249A188 List:
References
NUDOCS 9806160164
Download: ML20249A195 (1)


Text

I 1' s 1

INDUSTRIAL RETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date: 4/23/98 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 4/1 to 4/2/98 Time of sample: 1415 J Sample Location: Sewage Pump Station Name of Sampler: S. Masters j l Laboratory Address: 7118 Industrial Park Blvd.

l Mentor, Ohio 44060-5314 Date of Analysis: 4/2 to 4/15/98 Flow: 42,800 gpd PARAMETER SAMPLE EPA ANALYSIS DISCIIARGE ANALYSIS TYPE METilOD DATE LIMIT RESULT COD Composite 410.4 4/3/98 n/a 190 mg/l BOD Composite 405.1 4/15/98 n/a 16 mg/l TSS Composite 160.2 4n/98 n/a 69 mg/l ,

Silver Composite 200.7 4/7/98 n/a <.050 mg/l Mercury Composite 245.1 4/7/98 2 ug/l <.50 ug/l pli Composite 150.1 4/2/98 5.5 to 12 s.u. 8.5s.u.

Oil /Orcase Grab 1664 4/6/98 50 mg/l 19 mg/l I certify under penalty oflaw that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant

- penalties for submitting false information including the possibility of fine and imprisonment.

M M M/e '

24/97 Vice President - Nuclear Signature / 'diate' Title 9906160164 990611ADOCK ,l" 05000440 PDR R PDR g