ML20210U808

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results, for Jul 1997
ML20210U808
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/31/1997
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20210U792 List:
References
NUDOCS 9709220089
Download: ML20210U808 (1)


Text

. _ . _ . _.

~

INDUSIRI AL PRETREATMENT QUARTERLY SELF MONITORING RESUL1S Perry Nuclear Power Plant Pennit No.: 1004411 10 Center Rd. Report Date: 7/l8 97 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 7/9 to 7/10/97 Time of sample: 12:45 Sample Location: Sewage Pump Station Name of Sampler: J. Beckerman Laboratory Address: 7118 Industrial Park Blvd.

Mentor, Ohio 44060-5314 Date of Analysis: 7/10 to 7/16/97 Flow: 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS DISCHARGE ANALYSIS TYPE METilOD DATE LIMIT RESULT COD Composite 410.4 7/15/97 n 'a' 190 mg/l BOD Composite 405.1 7/16/97 /

rt av M0 mg/l TSS Composite 160.2 7/15!97 n/a 490 mg/l Silver Composite 272.1 7/14/97 st'a <.050 mg/l Mercury Composite 245.1 7/14/97 2 ug/l <.50 ug/l pil Composite 150.1 7/10/97 5.5 to 12 s.u. 8.5 s.u.

Oil / Grease Grab 413.1 7/15/97 50 mg/l 23 mg/l I certify under penalty oflaw that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are signi6 cant penalties for submitting false information including the possibility of One and imprisonment.

j[4,-, Yf[9) Vice President - Nuclear

%natu're 7 Date Title 9709220089 970912 PDR ADOCK 05000440 R PDR I

- - - - -