ML20198C087
| ML20198C087 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 09/30/1998 |
| From: | Luiza E, Myers L CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20198C085 | List: |
| References | |
| NUDOCS 9812210300 | |
| Download: ML20198C087 (1) | |
Text
L, r,
i INDUSTRIAL PRETREATMENT g
QUARTERLY SELF-MONITORNG RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd.
Report Date: 9/29/98 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 9/9 to 9/10/98 Time of sample: 1100 Sample Location: Sewage Pump Station Name of Sampler: E. Luiza Laboratory Address: 7118 Industrial Park Blvd.
Mentor, Ohio 44060-5314 Date of Analysis: 9/05 to 9/85/98 Flow:42,800 gpd PARAMETER SAMPLE EPA ANALYSIS DISCIIARGE ANALYSIS TYPE METHOD DATE LIMIT RESULT COD Composite 410.4 9/15/98 n/a 260 mg/l BOD Composite 405.1 9/15/98 n/a 120 mg/l TSS Composite 160.2 9/11/98 n/a 160 mg/l Silver Composite 200.7 9/14/98 n/a
< 050 mg/l Mercury Composite 245.2 9/14/98 2 ug/l
<0.53 ug/l pH Composite 150.1 9/10/98 5.5 tol2 s.u.
8.3s.u.
Oil / Grease Grab 1664 9/5/98 50 mg/l 18.0 mg/l I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.
MM 8/euS
/2///Ms Vice President - Nuclear Signature
/
Daff Title 9812210300 981209 PDR ADOCK 05000440 R
PDR c