ML20203H324

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results, for Oct 1997
ML20203H324
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/31/1997
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20203H306 List:
References
NUDOCS 9712180382
Download: ML20203H324 (1)


Text

._

4 4

INDUSTRIAL PRETREATMENT QUARTERLY Sell' MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd.

Report Date: 10!!4/97 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample; 10/9 to 10!l0/97 Time of sample: 1615 Sample Location: Sewage Fump Station Name of Sampler: Masters /Landis Laboratory Address: 71 tu industrial Park I31vd.

McMor Ohio 44060-5314 Date of Analysis: 10/3 in 10/13/97 Flow. 33,000 gpd PARAMETER SAMPLE EPA ANALY' IS DISCllARGE ANALYSIS S

TYPE METilOD DATE LIMIT RESULT

^

COD Cc uposite 410.4 10/8/97 n/a 500 mg/l IlOD Composite 405.1 10/8/97 n/a 210 mg/l TSS Composite 160.2 10/13/97 n/a 100 mg/l Silver Composite 272.1 10/9/97 n/a

<.050 mg/l Mercury Composite 245.1 10/10/97 2 ug/l

<.50 ug/l plI Composite 150.1 10/3/97 5.5 to 12 s.u.

7.6 s.u.

Oil / Grease Grab 413.1 10/13/97 50 mg/l 19 mg/l I certify under penalty oflaw that I have personally examiaed and I am familiar with the information in this r. port and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report. I believe that the information is true, accurate, and complete. I am aware that there are signincant penalties for submitting false Information including the possibility of fine and imprisonment.

/ VQo fz/g/97 Vice President - Nuclear Signature

/

Date Title 9712180382 971210 PDR ADOCK 05000440 R

peg

_______- - -