ML20249A193
| ML20249A193 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/31/1998 |
| From: | Myers L CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20249A188 | List: |
| References | |
| NUDOCS 9806160161 | |
| Download: ML20249A193 (1) | |
Text
,_
INDUSTRIAL RETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd.
Report Date: 3/19/98 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 3/9 to 3/10/98 Time of sample: 1442 Sample Location: Sewage Pump Station Name of Sampler: P. Brown Laboratory Address: 7118 Industrial Park Blvd.
Mentor, Ohio 44060-5314 Date of Analysis: 3/11 to 3/16/98 Flow: 42,800 gpd i
PARAMETER SAMPLE EPA ANALYSIS DISCHARGE ANALYSIS TYPE METHOD DATE LIMIT RESULT COD Composite 410.4
. 3/11/98 n/a 360 mg/l BOD Composite 405.1 3/16/98 n/a 80 mg/l l
TSS Composite 160.2 3/12/98 n/a 120 mg/l Silver Composite 200.7 3/12/98
-n/a
<.050 mg/l Mercury Composite 245.1 3/16/98 2 ug/l
<0.50 ug/l pH Composite 150.1 3/11/98-5.5 tol2 s.u.
8.3s.u.
Oil / Grease -
Grab 1664 3/13/98 50 mg/l 23.0 mg/l I certify under penalty oflaw that I have personally examined and I am familiar with the information in this report and that, based on my ir,quiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.
CM ced M M/h
/Jad[
Vice President - Nuclear Signature
/
~
Date~
Title 4
_m 0m POR ADOCR 05000440 t R
/
la