ML20151W186

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results for June 1998, for PNPP
ML20151W186
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/30/1998
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20151W176 List:
References
NUDOCS 9809150209
Download: ML20151W186 (1)


Text

-..

~ -... _ _. _ -

l' l

INDUSTRIAL PRETREATMENT QUARTERLY SELF-MONITORING RESULTS l

Perry Nuclear Power Plant Permit No.: 1004911

^

1 10 Center Rd.

Report Date: 6/15/98 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 6/3 to 6/4/98 Time ofsample: 1442 Sample Location: Sewage Pump Station Name of Sampler: P. Brown Laboratory Address: 7113 Industrial Park Blvd.

M.:ntor, Ohio 44060-5314 i

Date of Analysis: 6/04 to o/10/98 Flow: 42,800 gpd 1

PARAMETER SAMPLE EPA ANALYSIS DISCIIARGE ANALYSIS TYPE METHOD DATE LIMIT RESULT COD Co cosite 410.4 6/9/98 n/a 360 mg/l BOD Composite 405.1 6/10/98 n/a 180 mg/l TSS Composite 160.2 6/5/98 n/a 260 mg/l Silver Composite 200.7 6/10/98 n/a

<.050 mg/l Mercury Composite 245.2 6/5/98 2 ug/l

<0.50 ug/l pH Composite 150.1 6/4/98 5,5 tol2 s.u.

8.4 s.u.

Oil / Grease Grab 1664 6/5/98 50 mg/l 28.0 mg/l I certify under penalty oflaw that I have personally examined end I am familiar with the information in this repon and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

> M /J'/w SN/v/

Vice President - Nuclear Signature

/

'6a'te '

Title l

l l

l-l I

9809150209 980909 7

gDR ADOCK 05000440.

eda i l

,-