ML20210U802

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results, for June 1997
ML20210U802
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/30/1997
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20210U792 List:
References
NUDOCS 9709220088
Download: ML20210U802 (1)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

INDUSTRI AL PRI 1 REATMENT QUARTERLY SELF-MONITORING Rl:SUL1S Perry Nuclear Power Plant Pennit No.: 1004911 10 Center Rd. Report I) ate: 6'20'47 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 6/9 to 6/10'97 Time of sample: 13:45 Sample Location: Sewage Pump Station Name of Sampler: S, Masters Laboratory Address: 7118 Industrial Park Blvd.

Mentor, Ohio 44060-5314 Date of Analysis
6/10 to 6/13/97 Flow: 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS DISCllARGE ANALYSIS TYPE METilOD DATE LIMIT RESULT COD Composite 410.4 6/13/97 n/a 310 mg/l BOD Composite 405.1 6/12/97 n/a 77 mg/l s TSS Composite 160.2 6/l1/97 n/a 42 mg/l Silver Composite 272.I 6/12/97 n/a < 050 mg/l Mercury Composite 245.1 6/12/97 2 ug/l <0.50 ug/l pil Composite 150.1 6/10/97 5.5 tol2 s.u. 8.2s.u.

Oit' Grease Grab 413.1 6/13/97 50 mg/l 8.3 mg/l -

I certify under penalty oflaw that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accrrate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

MM8f/m 7 9Id ? '

Vice President - Nuclear Signature 'DTte Title 9709220088 970912 PDR ADOCK 05000440 R PDR

- _ _ _ _ _ _ _ _ _ _ _